1931Year Built
2Stories
F9Building Class
R6BZoning
7,400 sfGross Floor Area
3Units
Rent Stabilized13 Open Violations ▸FDNY Report ↗
Factory, industrial, miscellaneous · Owner of record: AMAR 8107-09 101 AVE LLC · 6,026 sf lot · 1.23 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralGeneral
Roof6p · 2 filings · 20 docs
Bulkhead3p · 1 filing · 20 docs
Floor 52p · 1 filing · 20 docs
Floor 42p · 1 filing · 20 docs
Floor 32p · 1 filing · 20 docs
Floor 24p · 2 filings · 20 docs
Floor 16p · 2 filings · 20 docs
Cellar3p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AMAR 8107-09 101AVE203/21/2026
AMAR 8107-09 101 AVE LLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SALEH AND ASSOCIATES LLC606/04/2026
JIAN ENGINEERING PLLC405/02/2026
SIMON JIANG101/08/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
B2 CODE CONSULTANTS203/21/2026
Building Lifecycle
All (114)Filed (11)Violation (16)Objection (57)Special Inspection (30)
08/17/2026
Objection resolved — Resolved
07/01/2026
Objection resolved — Resolved
06/25/2026
Objection resolved — Addressed
06/15/2026
Objection resolved — Addressed
06/11/2026
Objection raised — Other
06/11/2026
Objection resolved — Addressed
06/11/2026
Special inspection requirement — Concrete - Cast-In-Place
06/11/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
06/11/2026
Special inspection requirement — Subgrade Inspections
06/05/2026
Objection resolved — Addressed
06/04/2026
Filed — Alteration
Q01365700-I1
05/30/2026
Objection resolved — Addressed
05/29/2026
Objection resolved — Addressed
05/29/2026
Objection resolved — Addressed
05/29/2026
Objection resolved — Addressed
05/29/2026
Objection resolved — Addressed
05/29/2026
Objection resolved — Addressed
05/29/2026
Objection resolved — Addressed
05/29/2026
Objection resolved — Addressed
05/29/2026
Objection resolved — Addressed
05/29/2026
Objection resolved — Addressed
05/29/2026
Objection resolved — Addressed
05/11/2026
Special inspection requirement — Protection of exposed foundation insulation
05/11/2026
Special inspection requirement — Air barrier — testing
05/11/2026
Special inspection requirement — Lighting in dwelling units
05/11/2026
Special inspection requirement — Maintenance information
05/11/2026
Special inspection requirement — Metering
05/08/2026
Objection raised — Structural
05/08/2026
Objection raised — Inspections
05/08/2026
Objection raised — Structural
05/08/2026
Objection raised — Admin
05/08/2026
Objection raised — Other
05/08/2026
Objection raised — Structural
05/08/2026
Objection raised — Inspections
05/08/2026
Objection raised — Inspections
05/08/2026
Objection raised — Structural
05/08/2026
Objection raised — Structural
05/08/2026
Objection raised — Structural
05/08/2026
Objection raised — Admin
05/06/2026
Objection raised — Other
05/02/2026
Filed — New Building
Application file to reduced the size of the curb cut to 10 linear feet.
Q01370714-S5
04/30/2026
Filed — New Building
Application file to reduced the size of the curb cut to 10 linear feet.
Q01370714-S7
04/30/2026
Filed — New Building
Application file to reduced the size of the curb cut to 10 linear feet.
Q01370714-S8
04/30/2026
Filed — New Building
Application file to reduced the size of the curb cut to 10 linear feet.
Q01370714-S6
04/30/2026
Objection raised — Structural
04/30/2026
Objection resolved — Resolved
04/30/2026
Objection raised — Zoning
04/30/2026
Objection resolved — Resolved
04/29/2026
Special inspection requirement — Underpinning
04/27/2026
Objection raised — Structural
04/27/2026
Objection raised — Structural
04/27/2026
Objection raised — Zoning
04/27/2026
Objection raised — Admin
04/27/2026
Objection raised — Structural
04/27/2026
Objection raised — Inspections
04/27/2026
Objection raised — Inspections
04/27/2026
Objection raised — Energy
04/27/2026
Objection raised — Scope
04/27/2026
Objection raised — Energy
04/24/2026
Special inspection requirement — Final
Latest 60 of 114 events.
Nothing on file for this building.
1 project · most recent 05/02/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/02/2026——Heating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-3C24NA4-U1 24,000 BTU · Condensing Unit ×14
MXZ-3C36NA4-U1 36,000 BTU · Vrf Outdoor ×14
MXZ-SM48NLHZ 47,000 BTU · Condensing Unit ×3
SUZ-AA09NLHZ-U1 162,000 BTU · Condensing Unit ×2
1 project · most recent 05/02/2026
Sprinkler System
FiledStatusContractorScope
05/02/2026——Sprinkler System
1 project · most recent 05/02/2026
Storm Water/Sanitary
FiledStatusContractorScope
05/02/2026——Storm, Water/Sanitary
1 project · most recent 12/06/2017
FiledStatusContractorScope
12/06/2017CompleteELECTROTEC OF NY ELECL IN—
1 project · most recent 05/02/2026
Concrete
FiledStatusContractorScope
05/02/2026——Concrete
▾Special Inspection Requirements (DOB NOW) — 50
DateRequirementInspectorRole
06/11/2026Concrete - Cast-In-Place—special
06/11/2026Subsurface Conditions – Fill Placement & In-Place Density—special
06/11/2026Subgrade Inspections—special
05/11/2026Protection of exposed foundation insulation—energy_progress
05/11/2026Air barrier — testing —energy_progress
05/11/2026Lighting in dwelling units—energy_progress
05/11/2026Maintenance information—energy_progress
05/11/2026Metering—energy_progress
04/29/2026Underpinning—special
04/24/2026Final—progress
04/24/2026Footing and Foundation—progress
04/24/2026Final—progress
04/13/2026Shutoff dampers—energy_progress
04/12/2026Energy Code Compliance Inspections—progress
04/12/2026HVAC-R and service water piping design and insulation—energy_progress
04/12/2026Maintenance information—energy_progress
04/12/2026HVAC-R and service water heating system controls—energy_progress
04/12/2026HVAC-R and service water heating equipment—energy_progress
04/12/2026Fire-Resistance Rated Construction—progress
04/12/2026Post-installed Anchors—special
04/02/2026Final—progress
04/02/2026Fire-Resistant Penetrations and Joints—special
04/02/2026Sprinkler Systems—special
04/02/2026Energy Code Compliance Inspections—progress
04/02/2026Mechanical Systems—special
Latest 25 of 50.
▾Documents — 30 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/17/2026Q01370714-I1Request digital key ↗
08/17/2026Q01370714-S6Request digital key ↗
08/16/2026Q01365700-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/17/2026Q01370714-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/17/2026Q01370714-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/17/2026Q01370714-I1Open ↗
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/17/2026Q01370714-S1Open ↗
08/17/2026Q01370714-S3Open ↗
08/17/2026Q01370714-I1Open ↗
Showing 3 of 10 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/17/2026Q01370714-I1Open ↗
▸Other Documents6
▸DOB NOWAdjoining Owners Notification2
08/15/2026Q01370714-S5Open ↗
08/15/2026Q01370714-S7Open ↗
▸DOB NOWProperty Ownership Certification1
08/17/2026Q01370714-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026Q01340710-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/17/2026Q01370714-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/17/2026Q01370714-I1Open ↗