← Back
Four families
105-19 RUBY STREET
QUEENS · BIN 4189698
💬 Discuss this project
1931Year Built
2Stories
C3Building Class
R4AZoning
3,307 sfGross Floor Area
4Units
Rent Stabilized5 Open Violations ▸
Four families · Owner of record: 4 KERRY LANE LLC · 2,650 sf lot · 1.25 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
1 job · most recent 08/13/2026
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
08/13/2026——Air Conditioning Systems, Heating Systems
Cooling
Mitsubishi Electric MSZ-GL06NA 6,000 BTU · Ahu ×6
MSZ-GL15NA 14,000 BTU · Ahu ×3
MSZ-GL12NA 12,000 BTU · Ahu ×2
MXZ-2C20NAA 20,000 BTU · Vrf Outdoor ×2
MUZ-GL15NA 15,000 BTU · Condensing Unit ×1
MXZ-3C24NA3 22,000 BTU · Condensing Unit ×1
MXZ-4C36NA3 36,000 BTU · Condensing Unit ×1
Heating
Mitsubishi Electric MSZ-GL06NA 7,200 BTU · Ahu ×6
MSZ-GL15NA 18,000 BTU · Ahu ×3
MSZ-GL12NA 14,400 BTU · Ahu ×2
MXZ-2C20NAA 25,000 BTU · Vrf Outdoor ×2
MUZ-GL15NA 18,000 BTU · Condensing Unit ×1
MXZ-3C24NA3 25,000 BTU · Condensing Unit ×1
MXZ-4C36NA3 43,000 BTU · Condensing Unit ×1
Building Lifecycle
All (21)Filed (1)Violation (13)Special Inspection (7)
08/13/2026
Filed — Alteration
REGISTER HVAC UNITS.
Q01440291-I1
08/05/2026
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
08/04/2026
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
08/04/2026
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
08/04/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
08/04/2026
Special inspection requirement — Maintenance information
LOUIS ARENA
08/03/2026
Special inspection requirement — Final
LOUIS ARENA
08/03/2026
Special inspection requirement — Mechanical Systems
LOUIS ARENA
05/06/2026
Violation issued (HPD, open)
A
11/21/2025
Violation issued (HPD, closed)
I
06/11/2025
Violation issued (HPD, open)
A
12/02/2024
Violation issued (HPD, closed)
I
03/28/2023
Violation issued (HPD, closed)
A
03/03/2022
Violation issued (HPD, closed)
A
10/03/2021
Violation issued (HPD, closed)
C
10/03/2021
Violation issued (HPD, closed)
B
04/14/2021
Violation issued (HPD, closed)
A
11/18/2016
Violation issued (HPD, closed)
I
12/06/2008
Violation issued (HPD, open)
B
03/16/2003
Violation issued (HPD, open)
B
03/16/2003
Violation issued (HPD, open)
B
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
4 KERRY LANE LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW YORK ENGINEERING ASSOC., P.C.108/13/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERING ASSO851108/13/2026
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
08/05/2026Tenant Protection Plan ComplianceLOUIS ARENAspecial
08/04/2026HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
08/04/2026HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
08/04/2026HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
08/04/2026Maintenance informationLOUIS ARENAenergy_progress
08/03/2026FinalLOUIS ARENAprogress
08/03/2026Mechanical SystemsLOUIS ARENAspecial
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/16/2026Q01440291-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026Q01440291-I1Open ↗
08/25/2026Q01440291-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026Q01440291-I1Open ↗
08/25/2026Q01440291-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026Q01440291-I1Open ↗