← Back
Three families
93-04 104 STREET
QUEENS · BIN 4195232
💬 Discuss this project
1920Year Built
3Stories
C0Building Class
R3-1Zoning
2,640 sfGross Floor Area
3Units
Rent Stabilized3 Open Violations ▸FDNY Report ↗
Three families · 3,242 sf lot · 0.81 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
Nothing on file for this building.
Building Lifecycle
All (33)Filed (2)Permit Issued (1)Signed Off (1)Violation (23)Inspection (4)Special Inspection (2)
05/07/2026
Violation issued (HPD, open)
A
06/12/2025
Violation issued (HPD, closed)
A
10/31/2024
Signed off — Alteration
OIL TO GAS CONVERSION; REPLACE EXISTING 3 BOILERS & 3 HWH WITH 3 NEW COMBINED BOILERS. REMOVE EX OIL TANK IN CELL. UPDATE GAS RISER PIPES.
Q00741942-I1
09/03/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/25/2024
Filed — Alteration
OIL TO GAS CONVERSION; REPLACE EXISTING 3 BOILERS & 3 HWH WITH 3 NEW COMBINED BOILERS. REMOVE EX OIL TANK IN CELL. UPDATE GAS RISER PIPES.
Q00741942-P1
07/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
07/22/2024
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
05/24/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/17/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/17/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/29/2024
Permit issued — Plumbing
Q00741942-I1-PL
04/15/2024
Violation issued (HPD, closed)
A
03/28/2023
Violation issued (HPD, closed)
A
11/02/2022
Violation issued (HPD, open)
C
11/02/2022
Violation issued (HPD, closed)
B
11/02/2022
Violation issued (HPD, closed)
C
11/02/2022
Violation issued (HPD, closed)
B
11/02/2022
Violation issued (HPD, closed)
B
11/02/2022
Violation issued (HPD, closed)
B
11/02/2022
Violation issued (HPD, closed)
C
11/02/2022
Violation issued (HPD, closed)
C
11/02/2022
Violation issued (HPD, open)
C
06/02/2022
Filed — Alteration
OIL TO GAS CONVERSION; REPLACE EXISTING 3 BOILERS & 3 HWH WITH 3 NEW COMBINED BOILERS. REMOVE EX OIL TANK IN CELL. UPDATE GAS RISER PIPES.
Q00741942-I1
03/04/2022
Violation issued (HPD, closed)
A
04/15/2021
Violation issued (HPD, closed)
A
04/15/2021
Violation issued (HPD, closed)
I
10/23/2018
Violation issued (HPD, closed)
I
12/04/2017
Violation issued (HPD, closed)
I
11/18/2016
Violation issued (HPD, closed)
I
10/15/2015
Violation issued (HPD, closed)
I
02/27/2015
Violation issued (HPD, closed)
I
06/09/2001
Violation issued (ECB, closed)
Construction
07/16/1999
Violation issued (ECB, closed)
Zoning
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ALLADIN EQUITIES INC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AA BLDG & INSP SVC LLC207/25/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JOTAKA MODERN HOME RENOVATIONS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KISHAN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519207/25/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offN AND S PLUMBING INC04/29/2024
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
09/03/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/24/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/17/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/17/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
07/22/2024Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
07/22/2024Energy Code Compliance InspectionsYounes Abouyaalaprogress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/21/2026Q00741942-P1Request digital key ↗
08/21/2026Q00741942-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/21/2026Q00741942-I1Open ↗
08/21/2026Q00741942-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/01/2026Q00741942-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026Q00741942-P1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/21/2026Q00741942-I1Open ↗
08/21/2026Q00741942-P1Open ↗