← Back
Two stories - detached, small or mid-size
91-33 116 STREET
QUEENS · BIN 4196595
💬 Discuss this project
1910Year Built
2.5Stories
A1Building Class
R4AZoning
1,680 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 2,760 sf lot · 0.61 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
1 job · most recent 12/11/2024
Gas Water/Sanitary
FiledStatusContractorScope
12/11/2024Signed-offM & M PIPING AND HEATINGGas, Water/Sanitary
Building Lifecycle
All (45)Filed (5)Permit Issued (4)Signed Off (2)Violation (2)Inspection (5)Objection (22)Special Inspection (5)
09/03/2026
Permit issued — Curb Cut
Q00929804-S2-CC
12/18/2025
Permit issued — General Construction
Q01181958-I1-GC
07/21/2025
Objection resolved — Addressed
07/21/2025
Objection resolved — Addressed
07/21/2025
Objection resolved — Addressed
04/04/2025
Objection raised — Scope
04/04/2025
Objection raised — Zoning
04/04/2025
Objection raised — Cost
03/30/2025
Filed — Alteration CO
Q01181958-I1
02/15/2025
Special inspection requirement — Concrete - Cast-In-Place
Sunil Saigal
01/29/2025
Signed off — Alteration
FILING IN ASSOCIATION WITH APPLICATION NUMBER 420565347 FOR THE PURPOSE OF REINSPECTION AND SIGN OFF. Uploaded as supported documents approved plans under job number 420563347 dated 5/1/12. This job was approved constructed inspected but never signed off
Q00929804-S1
01/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Sunil Saigal
01/06/2025
Special inspection requirement — Energy Code Compliance Inspections
Sunil Saigal
12/26/2024
Objection resolved — Addressed
12/19/2024
Objection raised — Other
12/11/2024
Filed — Alteration
FILING IN ASSOCIATION WITH APPLICATION NUMBER 420565347 FOR THE PURPOSE OF REINSPECTION AND SIGN OFF. Uploaded as supported documents approved plans under job number 420563347 dated 5/1/12. This job was approved constructed inspected but never signed off
Q00929804-P1
12/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Sunil Saigal
12/06/2024
Special inspection requirement — Energy Code Compliance Inspections
Sunil Saigal
11/14/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/29/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/03/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/03/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/16/2024
Permit issued — Plumbing
Q00929804-S1-PL
07/29/2024
Signed off — Alteration
FILING IN ASSOCIATION WITH APPLICATION NUMBER 420565347 FOR THE PURPOSE OF REINSPECTION AND SIGN OFF. Uploaded as supported documents approved plans under job number 420563347 dated 5/1/12. This job was approved constructed inspected but never signed off
Q00929804-I1
07/24/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
07/05/2024
Permit issued — General Construction
Q00929804-I1-GC
05/05/2024
Objection resolved — Addressed
04/25/2024
Filed — Alteration
FILING IN ASSOCIATION WITH APPLICATION NUMBER 420565347 FOR THE PURPOSE OF REINSPECTION AND SIGN OFF. Uploaded as supported documents approved plans under job number 420563347 dated 5/1/12. This job was approved constructed inspected but never signed off
Q00929804-S2
02/02/2024
Objection resolved — Addressed
02/02/2024
Objection resolved — Addressed
10/23/2023
Objection raised — Scope
10/23/2023
Objection raised — Scope
10/15/2023
Filed — Alteration
FILING IN ASSOCIATION WITH APPLICATION NUMBER 420565347 FOR THE PURPOSE OF REINSPECTION AND SIGN OFF. Uploaded as supported documents approved plans under job number 420563347 dated 5/1/12. This job was approved constructed inspected but never signed off
Q00929804-S1
10/13/2023
Objection resolved — Addressed
10/13/2023
Objection resolved — Addressed
10/13/2023
Objection resolved — Addressed
10/08/2023
Objection resolved — Addressed
09/26/2023
Objection raised — Scope
09/26/2023
Objection raised — Scope
09/26/2023
Objection raised — Other
09/26/2023
Objection raised — Scope
09/26/2023
Objection raised — Inspections
09/13/2023
Filed — Alteration
FILING IN ASSOCIATION WITH APPLICATION NUMBER 420565347 FOR THE PURPOSE OF REINSPECTION AND SIGN OFF. Uploaded as supported documents approved plans under job number 420563347 dated 5/1/12. This job was approved constructed inspected but never signed off
Q00929804-I1
11/26/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/15/2005
Violation issued (ECB, closed)
Construction
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ENTHINK ENGINEERS LLC503/30/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
VISIONAEC503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DIGITAL CONSTRUCTION TECHGeneral Contractor509/07/2026
M & M PIPING AND HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ENTHINK ENGINEERS LLC6247303/30/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutPermit IssuedDIGITAL CONSTRUCTION TECH09/03/2026
DOB NOWGeneral ConstructionPermit IssuedDIGITAL CONSTRUCTION TECH12/18/2025
DOB NOWPlumbingSigned-offM & M PIPING AND HEATING08/16/2024
DOB NOWGeneral ConstructionSigned-offDIGITAL CONSTRUCTION TECH07/05/2024
BISCCISSUEDREMODELERS AND FINISHING05/08/2012
BISOTISSUEDOWNER09/28/2005
BISPLISSUEDTHE PLG CO INC09/28/2005
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
11/14/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/29/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/03/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/03/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/24/2024Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
02/15/2025Concrete - Cast-In-PlaceSunil Saigalspecial
01/06/2025Fire-Resistant Penetrations and JointsSunil Saigalspecial
01/06/2025Energy Code Compliance InspectionsSunil Saigalprogress
12/06/2024Fire-Resistant Penetrations and JointsSunil Saigalspecial
12/06/2024Energy Code Compliance InspectionsSunil Saigalprogress
▾Documents — 42 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/24/2026Q00929804-I1Request digital key ↗
08/24/2026Q00929804-S1Request digital key ↗
08/24/2026Q00929804-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
05/14/2012420565347Open ↗
▸BISWORK PERMIT APPLICATION1
05/11/2012420565347Open ↗
▸Zoning, Tax Lot & Property Records4
▸DOB NOWRestrictive Declaration/Easement 13
08/24/2026Q00929804-S1Open ↗
08/13/2026Q00929804-I1Open ↗
08/13/2026Q00929804-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01181958-I1Open ↗
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/24/2026Q00929804-S1Open ↗
08/13/2026Q00929804-P1Open ↗
08/13/2026Q00929804-S2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/26/2026Q01181958-I1Open ↗
08/24/2026Q00929804-S1Open ↗
08/23/2026Q00929804-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/24/2026Q00929804-S1Open ↗
08/23/2026Q00929804-P1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
05/14/2012420565347Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
05/14/2012420565347Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
05/14/2012420565347Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST1
05/14/2012420565347Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q01181958-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q01181958-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026Q01181958-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q01181958-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/24/2026Q00929804-S1Open ↗
08/13/2026Q00929804-I1Open ↗
08/13/2026Q00929804-P1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
05/14/2012420565347Open ↗
▸Inspections & Test Reports4
▸BISCONCRETE - CAST-IN-PLACE2
10/18/2023420565347Open ↗
10/18/2023420565347Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
10/18/2023420565347Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
10/18/2023420565347Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
05/14/2012420565347Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
05/14/2012420565347Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
05/14/2012420565347Open ↗
▸Other Documents2
▸DOB NOWFinal Survey1
08/13/2026Q01181958-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026Q01181958-I1Open ↗