← Back
Two family frame
95-32 111 STREET
QUEENS · BIN 4197935
💬 Discuss this project
1920Year Built
2Stories
B2Building Class
R4AZoning
2,288 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family frame · 2,700 sf lot · 0.85 FAR built · Flood zone X
Locations of Work
Other
Cellar2p · 1 filing · 20 docs
1 job · most recent 08/08/2021
FiledStatusContractorScope
08/08/2021Permit IssuedJ.W. ELECTRIC CORP3 meters, 1 new_meters
Building Lifecycle
All (32)Filed (4)Permit Issued (2)Signed Off (2)Violation (2)Inspection (4)Special Inspection (18)
03/10/2025
Violation issued (ECB, closed)
Construction
06/15/2022
Signed off — Alteration
Install Bathroom with 3 fixtures and relocate washer, dryer and slop sink
Q00577551-I1
06/14/2022
Signed off — Alteration
Renovate Cellar and add Bathroom with Three Fixtures, one new boiler and one new hot water heater
Q00577530-I1
02/17/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/15/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/15/2021
Special inspection requirement — Lighting in dwelling units
EGAR STEWART
11/15/2021
Special inspection requirement — Energy Code Compliance Inspections
EGAR STEWART
11/15/2021
Special inspection requirement — Insulation placement and R values
EGAR STEWART
11/15/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
EGAR STEWART
11/15/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
EGAR STEWART
11/15/2021
Special inspection requirement — Fire-Resistance Rated Construction
EGAR STEWART
11/15/2021
Special inspection requirement — Final
EGAR STEWART
11/10/2021
Special inspection requirement — Energy Code Compliance Inspections
EGAR STEWART
11/10/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
EGAR STEWART
11/09/2021
Filed — Alteration
Renovate Cellar and add Bathroom with Three Fixtures, one new boiler and one new hot water heater
Q00577530-P1
11/09/2021
Filed — Alteration
Install Bathroom with 3 fixtures and relocate washer, dryer and slop sink
Q00577551-P1
11/09/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
EGAR STEWART
11/09/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
EGAR STEWART
11/09/2021
Special inspection requirement — Energy Code Compliance Inspections
EGAR STEWART
11/09/2021
Special inspection requirement — Final
EGAR STEWART
11/09/2021
Special inspection requirement — Fire-Resistance Rated Construction
EGAR STEWART
11/09/2021
Special inspection requirement — Insulation placement and R values
EGAR STEWART
11/09/2021
Special inspection requirement — Lighting in dwelling units
EGAR STEWART
11/09/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
EGAR STEWART
11/09/2021
Special inspection requirement — Energy Code Compliance Inspections
EGAR STEWART
09/28/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/28/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/20/2021
Permit issued — General Construction
Q00577530-I1-GC
09/08/2021
Permit issued — Plumbing
Q00577551-I1-PL
08/17/2021
Filed — Alteration
Install Bathroom with 3 fixtures and relocate washer, dryer and slop sink
Q00577551-I1
08/17/2021
Filed — Alteration
Renovate Cellar and add Bathroom with Three Fixtures, one new boiler and one new hot water heater
Q00577530-I1
07/25/2005
Violation issued (ECB, closed)
Quality of Life
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STEWART ENGINEERING SERVICES, PLLC411/09/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AKIE LAWRENCEGeneral Contractor107/08/2026
JERRY'S PLBG & HVAC INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STEWART ENGINEERING SERVI2506411/09/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offAKIE LAWRENCE09/20/2021
DOB NOWPlumbingSigned-offJERRY'S PLBG & HVAC INC09/08/2021
BISPLISSUEDROCK E SMALL PLBG&HTG INC08/25/2005
BISOTISSUEDNA08/23/2005
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
02/17/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/15/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/28/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/28/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
11/15/2021Lighting in dwelling unitsEGAR STEWARTenergy_progress
11/15/2021Energy Code Compliance InspectionsEGAR STEWARTprogress
11/15/2021Insulation placement and R valuesEGAR STEWARTenergy_progress
11/15/2021Fire-Resistant Penetrations and JointsEGAR STEWARTspecial
11/15/2021Structural Stability – Alterations of existing buildingsEGAR STEWARTspecial
11/15/2021Fire-Resistance Rated ConstructionEGAR STEWARTprogress
11/15/2021FinalEGAR STEWARTprogress
11/10/2021Energy Code Compliance InspectionsEGAR STEWARTprogress
11/10/2021Fire-Resistant Penetrations and JointsEGAR STEWARTspecial
11/09/2021Fire-Resistant Penetrations and JointsEGAR STEWARTspecial
11/09/2021Structural Stability – Alterations of existing buildingsEGAR STEWARTspecial
11/09/2021Energy Code Compliance InspectionsEGAR STEWARTprogress
11/09/2021FinalEGAR STEWARTprogress
11/09/2021Fire-Resistance Rated ConstructionEGAR STEWARTprogress
11/09/2021Insulation placement and R valuesEGAR STEWARTenergy_progress
11/09/2021Lighting in dwelling unitsEGAR STEWARTenergy_progress
11/09/2021Fire-Resistant Penetrations and JointsEGAR STEWARTspecial
11/09/2021Energy Code Compliance InspectionsEGAR STEWARTprogress
▾Documents — 35 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/27/2026Q00577530-I1Request digital key ↗
08/27/2026Q00577530-P1Request digital key ↗
08/27/2026Q00577551-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWRestrictive Declaration/Easement 14
08/27/2026Q00577551-I1Open ↗
08/13/2026Q00577551-P1Open ↗
08/13/2026Q00577530-I1Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications22
▸DOB NOWProgress Inspector Seal & Signature12
08/31/2026Q00577551-I1Open ↗
08/26/2026Q00577551-P1Open ↗
08/25/2026Q00577530-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/31/2026Q00577551-I1Open ↗
08/26/2026Q00577551-P1Open ↗
08/25/2026Q00577530-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/27/2026Q00577530-P1Open ↗
08/27/2026Q00577530-I1Open ↗
08/27/2026Q00577551-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/27/2026Q00577530-P1Open ↗
08/27/2026Q00577530-I1Open ↗
08/27/2026Q00577551-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00577530-I1Open ↗