Two family frame
95-43 113 STREET
QUEENS · BIN 4198171
💬 Discuss this project
1920Year Built
2Stories
B2Building Class
R4AZoning
1,976 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family frame · 2,477 sf lot · 0.8 FAR built · Flood zone X
Locations of Work
Architecture
Roof2p · 1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
UNISOLAR105/16/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
INDY ELECTRIC CORP.Electrical103/22/2026
CENTURION SOLAR ENERGYGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CENTURION SOLAR ENERGY LL9475105/16/2025
Building Lifecycle
All (13)Filed (1)Permit Issued (1)Signed Off (1)Violation (1)Objection (4)Special Inspection (5)
10/22/2025
Signed off — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONICGENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.*NO CHANGE TO USE, EGRESS OR OCCUPANCY.*
Q01224713-I1
06/03/2025
Permit issued — Solar
Q01224713-I1-SL
05/28/2025
Objection resolved — Addressed
05/28/2025
Objection resolved — Addressed
05/19/2025
Objection raised — Structural
05/19/2025
Objection raised — Other
05/16/2025
Filed — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONICGENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.*NO CHANGE TO USE, EGRESS OR OCCUPANCY.*
Q01224713-I1
05/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Andres Arias Londono
05/12/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Andres Arias Londono
05/12/2025
Special inspection requirement — Energy Code Compliance Inspections
Andres Arias Londono
05/12/2025
Special inspection requirement — Final
Andres Arias Londono
05/12/2025
Special inspection requirement — Air barrier - visual inspection
Andres Arias Londono
11/20/1999
Violation issued (ECB, closed)
Quality of Life
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offCENTURION SOLAR ENERGY06/03/2025
BISPLISSUEDJOHNNY'S P&H CONTRAC INC12/27/1999
BISOTISSUEDINDIRA ROY12/15/1999
2 projects · most recent 05/14/2025
General Wiring
FiledStatusContractorScope
05/14/2025CompleteBERGER QUALITY ELEC'L CON—
04/22/2018CancelledINDY ELECTRIC CORP.General Wiring
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
05/12/2025Fire-Resistant Penetrations and JointsAndres Arias Londonospecial
05/12/2025Structural Stability – Alterations of existing buildingsAndres Arias Londonospecial
05/12/2025Energy Code Compliance InspectionsAndres Arias Londonoprogress
05/12/2025FinalAndres Arias Londonoprogress
05/12/2025Air barrier - visual inspectionAndres Arias Londonoenergy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/20/2026Q01224713-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWProgress Inspector Seal & Signature3
08/23/2026Q01224713-I1Open ↗
08/23/2026Q01224713-I1Open ↗
08/23/2026Q01224713-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026Q01224713-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026Q01224713-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q01224713-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01224713-I1Open ↗