Two stories - detached, small or mid-size
114-04 95 AVENUE
QUEENS · BIN 4198183
💬 Discuss this project
1910Year Built
2Stories
A1Building Class
R4AZoning
1,248 sfGross Floor Area
1Units
4 Open Violations ▸FDNY Report ↗
Two stories - detached, small or mid-size · 1,900 sf lot · 0.66 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AP PROFESSIONAL ENGINEERING PLLC104/04/2026
MOMENTUM SOLAR202/28/2025
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AP PROFESSIONAL ENGINEERI5974104/04/2026
MXV SIA LLC9281202/28/2025
Building Lifecycle
All (16)Filed (3)Permit Issued (1)Signed Off (1)Violation (5)Special Inspection (6)
04/04/2026
Filed — Alteration
PROPOSED FRAME PORTABLE STORAGE SHED FILED UNDER THIS APPLICATION AND TO RESOLVE VIOLATION # 039174612Y
Q01381087-I1
04/01/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
GURVINDER SINGH
01/21/2026
Violation issued (ECB, open)
Construction
01/21/2026
Violation issued (ECB, open)
Construction
01/21/2026
Violation issued (ECB, open)
Unknown
01/21/2026
Violation issued (ECB, open)
Construction
04/24/2025
Signed off — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 19 Panels, 7.79 kW
Q01077080-I1
02/28/2025
Filed — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 19 Panels, 7.79 kW
Q01077080-P1
02/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
02/13/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
02/13/2025
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
02/13/2025
Special inspection requirement — Final
Mina Makar
02/13/2025
Special inspection requirement — Air barrier - visual inspection
Mina Makar
07/10/2024
Permit issued — Solar
Q01077080-I1-SL
07/08/2024
Filed — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 19 Panels, 7.79 kW
Q01077080-I1
01/30/2003
Violation issued (ECB, closed)
Quality of Life
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR07/10/2024
2 projects · most recent 03/01/2026
General Wiring
FiledStatusContractorScope
03/01/2026CompleteINDY ELECTRIC CORP.General Wiring
07/08/2024CompleteISLAND ELECTRIC CORP—
1 project · most recent 04/04/2026
FiledStatusContractorScope
04/04/2026——1 scope_items
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
04/01/2026Structural Stability – Alterations of existing buildingsGURVINDER SINGHspecial
02/13/2025Fire-Resistant Penetrations and JointsMina Makarspecial
02/13/2025Structural Stability – Alterations of existing buildingsMina Makarspecial
02/13/2025Energy Code Compliance InspectionsMina Makarprogress
02/13/2025FinalMina Makarprogress
02/13/2025Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/29/2026Q01381087-I1Request digital key ↗
08/20/2026Q01077080-P1Request digital key ↗
08/20/2026Q01077080-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/20/2026Q01077080-I1Open ↗
08/20/2026Q01077080-P1Open ↗
08/17/2026Q01381087-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/27/2026Q01077080-P1Open ↗
08/27/2026Q01077080-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/27/2026Q01077080-P1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/20/2026Q01077080-I1Open ↗
08/20/2026Q01077080-P1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01077080-I1Open ↗