ECB04/12/2022WORK WITHOUT PERMIT. NOTED; AT REAR OF BUILDING AT 2ND FLOOR LEVEL CREATED WOOD FRAME DECK AND COMBUSTIBLE WOOD FRAME OVERHEAD CANOPY ATTACHED TO FACADE. 100% OF WORK COMPLETED., OBTAIN PERMIT$500 due
DOB11/08/2019VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
DOB04/06/2018VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
DOB12/13/2011VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
HPD04/14/2010SECTION 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY
Predominantly retail with other uses · Owner of record: BHATIA TRUST, DATED FEBRUARY 05, 2025 · 1,450 sf lot · 1.75 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)