← Back
Two stories - detached, small or mid-size
97-32 126 STREET
QUEENS · BIN 4199965
💬 Discuss this project
1910Year Built
2Stories
A1Building Class
R4AZoning
1,216 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 2,018 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
3 jobs · most recent 07/01/2020
General Wiring
FiledStatusContractorScope
07/01/2020CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
10/16/2019Permit IssuedALL WAYS ELECTRIC CORP.W—
09/13/2018CompleteBERGER QUALITY ELEC'L CON—
Building Lifecycle
All (22)Filed (4)Permit Issued (4)Signed Off (4)Special Inspection (10)
03/11/2021
Signed off — Alteration
INSTALLATION OF 2 NEW FLOOR DRAINS IN BOILER ROOM AND LAUNDRY IN THE CELLAR. REMOVAL OF BATHTUB, INSTALLATION OF NEW STALL SHOWER, RELOCATION OF SINK AND TOILET IN THE SECOND FLOOR BATHROOM.
Q00338776-S2
03/09/2021
Signed off — Alteration
INSTALLATION OF 2 NEW FLOOR DRAINS IN BOILER ROOM AND LAUNDRY IN THE CELLAR. REMOVAL OF BATHTUB, INSTALLATION OF NEW STALL SHOWER, RELOCATION OF SINK AND TOILET IN THE SECOND FLOOR BATHROOM.
Q00338776-S1
03/01/2021
Signed off — Alteration
INSTALLATION OF 2 NEW FLOOR DRAINS IN BOILER ROOM AND LAUNDRY IN THE CELLAR. REMOVAL OF BATHTUB, INSTALLATION OF NEW STALL SHOWER, RELOCATION OF SINK AND TOILET IN THE SECOND FLOOR BATHROOM.
Q00338776-I1
02/11/2021
Permit issued — Plumbing
Q00338776-S2-PL
01/15/2021
Filed — Alteration
INSTALLATION OF 2 NEW FLOOR DRAINS IN BOILER ROOM AND LAUNDRY IN THE CELLAR. REMOVAL OF BATHTUB, INSTALLATION OF NEW STALL SHOWER, RELOCATION OF SINK AND TOILET IN THE SECOND FLOOR BATHROOM.
Q00338776-S2
01/13/2021
Special inspection requirement — HVAC-R and service water heating equipment
MICHIO SANGA
01/13/2021
Special inspection requirement — Energy Code Compliance Inspections
MICHIO SANGA
01/13/2021
Special inspection requirement — HVAC-R and service water heating system controls
MICHIO SANGA
01/13/2021
Special inspection requirement — Maintenance information
MICHIO SANGA
01/13/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
MICHIO SANGA
12/02/2020
Signed off — Alteration
Q00337947-I1
12/01/2020
Permit issued — Plumbing
Q00338776-S1-PL
08/12/2020
Permit issued — Curb Cut
Q00337947-I1-CC
08/10/2020
Filed — Alteration
INSTALLATION OF 2 NEW FLOOR DRAINS IN BOILER ROOM AND LAUNDRY IN THE CELLAR. REMOVAL OF BATHTUB, INSTALLATION OF NEW STALL SHOWER, RELOCATION OF SINK AND TOILET IN THE SECOND FLOOR BATHROOM.
Q00338776-S1
07/17/2020
Permit issued — Plumbing
Q00338776-I1-PL
04/10/2020
Filed — Alteration
INSTALLATION OF 2 NEW FLOOR DRAINS IN BOILER ROOM AND LAUNDRY IN THE CELLAR. REMOVAL OF BATHTUB, INSTALLATION OF NEW STALL SHOWER, RELOCATION OF SINK AND TOILET IN THE SECOND FLOOR BATHROOM.
Q00338776-I1
04/10/2020
Filed — Alteration
Q00337947-I1
04/04/2020
Special inspection requirement — Energy Code Compliance Inspections
MICHIO SANGA
04/03/2020
Special inspection requirement — HVAC and service water heating equipment
MICHIO SANGA
04/03/2020
Special inspection requirement — Maintenance information
MICHIO SANGA
04/03/2020
Special inspection requirement — HVAC and service water heating system controls
MICHIO SANGA
04/03/2020
Special inspection requirement — HVAC insulation and sealing
MICHIO SANGA
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/14/2015$380K—— → —$312/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MICHIO SANGA RA401/15/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STELLAR INDUSTRIES INCGeneral Contractor303/21/2026
G.M.A. PLUMBING & HEATINGPlumbing307/08/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offG.M.A. PLUMBING & HEATING02/11/2021
DOB NOWPlumbingSigned-offG.M.A. PLUMBING & HEATING12/01/2020
DOB NOWCurb CutPermit IssuedSTELLAR INDUSTRIES INC08/12/2020
DOB NOWPlumbingSigned-offG.M.A. PLUMBING & HEATING07/17/2020
BISOTISSUEDHOPE HOME IMPROVEMENT INC06/22/2020
BISOTISSUEDBROOKLYN SOLAR PARTNERS08/12/2018
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
01/13/2021HVAC-R and service water heating equipmentMICHIO SANGAenergy_progress
01/13/2021Energy Code Compliance InspectionsMICHIO SANGAprogress
01/13/2021HVAC-R and service water heating system controlsMICHIO SANGAenergy_progress
01/13/2021Maintenance informationMICHIO SANGAenergy_progress
01/13/2021HVAC-R and service water piping design and insulationMICHIO SANGAenergy_progress
04/04/2020Energy Code Compliance InspectionsMICHIO SANGAprogress
04/03/2020HVAC and service water heating equipment MICHIO SANGAenergy_progress
04/03/2020Maintenance informationMICHIO SANGAenergy_progress
04/03/2020HVAC and service water heating system controls MICHIO SANGAenergy_progress
04/03/2020HVAC insulation and sealing MICHIO SANGAenergy_progress
▾Documents — 92 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch - Plumbing2
08/28/2026Q00338776-S1Request digital key ↗
08/28/2026Q00338776-S2Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing Legalization1
08/28/2026Q00338776-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/28/2026Q00337947-I1Request digital key ↗
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION4
03/24/2020421802687Open ↗
03/20/2020421802687Open ↗
05/14/2019440498944Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION2
06/22/2020421802687Open ↗
08/08/2018440498944Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWRestrictive Declaration/Easement 12
08/13/2026Q00338776-I1Open ↗
08/13/2026Q00338776-S2Open ↗
▸BISRESTRICTION: RESTRICTIVE DECLARATION1
04/23/2020421802687Open ↗
▸Seals & Professional Certifications22
▸DOB NOWProgress Inspector Seal & Signature10
08/31/2026Q00338776-I1Open ↗
08/31/2026Q00338776-I1Open ↗
08/31/2026Q00338776-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/28/2026Q00337947-I1Open ↗
08/13/2026Q00338776-S1Open ↗
08/13/2026Q00338776-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
04/22/2020421802687Open ↗
04/21/2020421802687Open ↗
03/20/2020421802687Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
03/20/2020421802687Open ↗
08/08/2018440498944Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/08/2018440498944Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
03/20/2020421802687Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/08/2018440498944Open ↗
▸Safety & Tenant Protection4
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM3
06/09/2020421802687Open ↗
04/21/2020421802687Open ↗
03/20/2020421802687Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES1
08/08/2018440498944Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/13/2026Q00338776-S2Open ↗
08/13/2026Q00338776-S1Open ↗
08/13/2026Q00338776-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
03/20/2020421802687Open ↗
08/08/2018440498944Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
04/23/2020421802687Open ↗
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
12/23/2020421802687Open ↗
12/16/2020421802687Open ↗
05/18/2020421802687Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
04/22/2020421802687Open ↗
04/21/2020421802687Open ↗
03/20/2020421802687Open ↗
▸BISAS-BUILT ENERGY ANALYSIS3
12/23/2020421802687Open ↗
12/16/2020421802687Open ↗
05/16/2019440498944Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
08/08/2018440498944Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
05/16/2019440498944Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/08/2018440498944Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00338776-S2Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY6
12/16/2020421802687Open ↗
06/09/2020421802687Open ↗
05/18/2020421802687Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
12/23/2020421802687Open ↗
05/16/2019440498944Open ↗
▸BISUtility Company PV System Interconnection Acknowledgement Letter1
05/16/2019440498944Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
12/23/2020421802687Open ↗
04/23/2020421802687Open ↗
03/20/2020421802687Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms16
▸BISADDITIONAL INFORMATION10
06/22/2020421802687Open ↗
06/09/2020421802687Open ↗
06/09/2020421802687Open ↗
Showing 3 of 10 on file for this type
▸BISBOROUGH INTAKE FORM4
06/22/2020421802687Open ↗
04/22/2020421802687Open ↗
04/21/2020421802687Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET1
03/20/2020421802687Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
08/08/2018440498944Open ↗
▸Other Documents1
▸BISPLOT DIAGRAM1
03/20/2020421802687Open ↗