← Back
Two stories - detached, small or mid-size
97-15 126 STREET
QUEENS · BIN 4200005
💬 Discuss this project
1910Year Built
2.5Stories
A1Building Class
R4AZoning
1,620 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 3,028 sf lot · 0.54 FAR built · Flood zone X
Locations of Work
General
Roof1p · 1 filing · 12 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ETRECTE LLC206/03/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PATRIOT ENERGY SOLUTIONS CORP403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PATRIOT ENERGY SOL COGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ETRECTE LLC8116206/03/2025
Building Lifecycle
All (9)Filed (2)Permit Issued (1)Signed Off (1)Special Inspection (5)
03/12/2026
Signed off — Alteration
ROOFTOP SOLAR PANEL INSTALLATION
Q00977753-I1
06/03/2025
Filed — Alteration
ROOFTOP SOLAR PANEL INSTALLATION
Q00977753-P1
06/03/2025
Special inspection requirement — Final
VYACHESLAV NECHAYEV
06/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
VYACHESLAV NECHAYEV
06/03/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
VYACHESLAV NECHAYEV
06/03/2025
Special inspection requirement — Energy Code Compliance Inspections
VYACHESLAV NECHAYEV
06/03/2025
Special inspection requirement — Air barrier - visual inspection
VYACHESLAV NECHAYEV
12/26/2023
Permit issued — Solar
Q00977753-I1-SL
12/15/2023
Filed — Alteration
ROOFTOP SOLAR PANEL INSTALLATION
Q00977753-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offPATRIOT ENERGY SOL CO12/26/2023
1 project · most recent 01/23/2024
FiledStatusContractorScope
01/23/2024CompleteMAK ELECTRICAL CONTR CORP1 meters
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
06/03/2025FinalVYACHESLAV NECHAYEVprogress
06/03/2025Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
06/03/2025Structural Stability – Alterations of existing buildingsVYACHESLAV NECHAYEVspecial
06/03/2025Energy Code Compliance InspectionsVYACHESLAV NECHAYEVprogress
06/03/2025Air barrier - visual inspectionVYACHESLAV NECHAYEVenergy_progress
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/23/2026Q00977753-I1Request digital key ↗
08/23/2026Q00977753-P1Request digital key ↗
▸Seals & Professional Certifications7
▸DOB NOWProgress Inspector Seal & Signature3
08/25/2026Q00977753-I1Open ↗
08/25/2026Q00977753-I1Open ↗
08/25/2026Q00977753-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/23/2026Q00977753-I1Open ↗
08/13/2026Q00977753-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026Q00977753-I1Open ↗
08/25/2026Q00977753-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/23/2026Q00977753-I1Open ↗
08/13/2026Q00977753-P1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q00977753-I1Open ↗