← Back
Office only, 2-6 stories
108-05 LIBERTY AVENUE
QUEENS · BIN 4201716
💬 Discuss this project
1931Year Built
2Stories
O2Building Class
R6BZoning
2,600 sfGross Floor Area
1Units
2 Open Violations ▸
Office only, 2-6 stories · Owner of record: QUEENS HOMES LLC · 1,760 sf lot · 1.48 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 5 docs
1 job · most recent 07/03/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/03/2026——Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Heating
Ventilation
Broan ×2
1 job · most recent 06/22/2026
General Wiring
FiledStatusContractorScope
06/22/2026Permit IssuedACCURATE ELEC'L CORP.General Wiring
Building Lifecycle
All (36)Filed (1)Violation (7)Objection (14)Special Inspection (14)
08/17/2026
Special inspection requirement — Duct leakage testing, insulation and design
08/11/2026
Objection resolved — Resolved
08/11/2026
Objection resolved — Resolved
08/11/2026
Objection resolved — Resolved
08/11/2026
Objection resolved — Resolved
08/11/2026
Objection resolved — Resolved
08/11/2026
Objection resolved — Resolved
08/11/2026
Objection resolved — Resolved
08/07/2026
Objection raised — Accessibility
08/07/2026
Objection raised — Other
08/07/2026
Objection raised — Fire_Protection
08/07/2026
Objection raised — Accessibility
08/07/2026
Objection raised — Fire_Protection
08/07/2026
Objection raised — Fire_Protection
08/07/2026
Objection raised — Fire_Protection
07/03/2026
Filed — Alteration CO
INTERIOR ALTERATION OF EXISTING MIXED USE BUILDING AND CHANGING USE TO COMMERCIAL USE
Q01424879-I1
07/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/03/2026
Special inspection requirement — Heating Systems
07/03/2026
Special inspection requirement — Lighting controls
07/03/2026
Special inspection requirement — Ventilation and air distribution system
07/03/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
07/03/2026
Special inspection requirement — Fenestration areas
07/03/2026
Special inspection requirement — Fenestration air leakage
07/03/2026
Special inspection requirement — Interior lighting power
06/30/2026
Special inspection requirement — HVAC-R and service water heating equipment
06/30/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
06/30/2026
Special inspection requirement — Final
06/30/2026
Special inspection requirement — Mechanical Systems
06/30/2026
Special inspection requirement — HVAC-R and service water heating system controls
02/24/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/16/1999
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/07/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/28/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BANJI AWOSIKA ARCHITECT P.C.107/03/2026
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
08/17/2026Duct leakage testing, insulation and design—energy_progress
07/03/2026Fire-Resistant Penetrations and Joints—special
07/03/2026Heating Systems—special
07/03/2026Lighting controls—energy_progress
07/03/2026Ventilation and air distribution system—energy_progress
07/03/2026Fenestration and door U-factor and product ratings—energy_progress
07/03/2026Fenestration areas—energy_progress
07/03/2026Fenestration air leakage—energy_progress
07/03/2026Interior lighting power—energy_progress
06/30/2026HVAC-R and service water heating equipment—energy_progress
06/30/2026HVAC-R and service water piping design and insulation—energy_progress
06/30/2026Final—progress
06/30/2026Mechanical Systems—special
06/30/2026HVAC-R and service water heating system controls—energy_progress
▾Documents — 5 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/14/2026Q01424879-I1Request digital key ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026Q01424879-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/14/2026Q01424879-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/14/2026Q01424879-I1Open ↗
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/14/2026Q01424879-I1Open ↗