← Back
Predominantly retail with other uses
105-14 LIBERTY AVENUE
QUEENS · BIN 4202138
💬 Discuss this project
1931Year Built
2Stories
K4Building Class
R6BZoning
2,900 sfGross Floor Area
3Units
Rent Stabilized14 Open Violations ▸FDNY Report ↗
Predominantly retail with other uses · Owner of record: HMF 105-14 LLC · 1,710 sf lot · 1.7 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanical
Roof1p · 1 filing · 12 docs
Floor 13p · 1 filing · 12 docs
2 jobs · most recent 04/21/2026
General Wiring
FiledStatusContractorScope
04/21/2026Permit IssuedVOLTRON ELECTRIC LLC—
11/21/2025CompleteVOLTRON ELECTRIC LLCGeneral Wiring
Building Lifecycle
All (57)Filed (6)Permit Issued (4)Signed Off (2)Violation (18)Inspection (5)Special Inspection (22)
04/28/2026
Permit issued — Sign
Q01352897-I1-SG
01/29/2026
Filed — Alteration
Q01352897-I1
11/25/2025
Violation issued (HPD, open)
I
11/14/2025
Violation issued (ECB, closed)
Construction
11/14/2025
Violation issued (ECB, closed)
Construction
05/14/2025
Signed off — Alteration
TO PROPOSE PLUMBING WORK FOR EXISTING STORE IN CONJUNCTION WITH ALT-2 JOB Q01115609 AS PER PLAN FILLED HEREWITH. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
Q01116498-I1
05/09/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/05/2025
Signed off — Alteration
TO PROPOSE INTERIOR RENOVATION FOR EXISTING STORE AT 001 FLOOR WITH GENERAL CONSTRUCTION AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
Q01115609-I1
04/30/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/21/2025
Special inspection requirement — Final
Tianchen Hu
03/21/2025
Special inspection requirement — HVAC-R and service water heating equipment
Tianchen Hu
03/21/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Tianchen Hu
03/21/2025
Special inspection requirement — HVAC-R and service water heating system controls
Tianchen Hu
03/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Tianchen Hu
03/21/2025
Special inspection requirement — Mechanical Systems
Tianchen Hu
03/21/2025
Special inspection requirement — Tenant Protection Plan Compliance
Tianchen Hu
03/21/2025
Special inspection requirement — Fire-Resistance Rated Construction
Tianchen Hu
03/21/2025
Special inspection requirement — Energy Code Compliance Inspections
Tianchen Hu
03/19/2025
Filed — Alteration
TO PROPOSE INTERIOR RENOVATION FOR EXISTING STORE AT 001 FLOOR WITH GENERAL CONSTRUCTION AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
Q01115609-P3
03/13/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/24/2025
Filed — Alteration
TO PROPOSE PLUMBING WORK FOR EXISTING STORE IN CONJUNCTION WITH ALT-2 JOB Q01115609 AS PER PLAN FILLED HEREWITH. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
Q01116498-P1
02/24/2025
Filed — Alteration
TO PROPOSE INTERIOR RENOVATION FOR EXISTING STORE AT 001 FLOOR WITH GENERAL CONSTRUCTION AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
Q01115609-P1
02/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Tianchen Hu
02/24/2025
Special inspection requirement — Tenant Protection Plan Compliance
Tianchen Hu
02/24/2025
Special inspection requirement — Energy Code Compliance Inspections
Tianchen Hu
02/24/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Tianchen Hu
02/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Tianchen Hu
02/23/2025
Special inspection requirement — Mechanical Systems
Tianchen Hu
02/23/2025
Special inspection requirement — Tenant Protection Plan Compliance
Tianchen Hu
02/23/2025
Special inspection requirement — Energy Code Compliance Inspections
Tianchen Hu
02/23/2025
Special inspection requirement — Final
Tianchen Hu
02/23/2025
Special inspection requirement — Fire-Resistance Rated Construction
Tianchen Hu
02/23/2025
Special inspection requirement — HVAC-R and service water heating equipment
Tianchen Hu
02/23/2025
Special inspection requirement — HVAC-R and service water heating system controls
Tianchen Hu
02/23/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Tianchen Hu
01/13/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/13/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/07/2025
Permit issued — General Construction
Q01115609-I1-GC-CX
12/05/2024
Violation issued (HPD, open)
I
10/21/2024
Permit issued — Plumbing
Q01116498-I1-PL
10/07/2024
Permit issued — Mechanical Systems
Q01115609-I1-GC-CX
10/05/2024
Filed — Alteration
TO PROPOSE PLUMBING WORK FOR EXISTING STORE IN CONJUNCTION WITH ALT-2 JOB Q01115609 AS PER PLAN FILLED HEREWITH. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
Q01116498-I1
09/26/2024
Filed — Alteration
TO PROPOSE INTERIOR RENOVATION FOR EXISTING STORE AT 001 FLOOR WITH GENERAL CONSTRUCTION AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
Q01115609-I1
11/29/2023
Violation issued (HPD, open)
I
11/18/2022
Violation issued (HPD, open)
I
03/17/2022
Violation issued (HPD, closed)
I
05/04/2014
Violation issued (HPD, open)
B
05/04/2014
Violation issued (HPD, open)
B
03/05/2002
Violation issued (HPD, open)
B
03/05/2002
Violation issued (HPD, open)
B
03/05/2002
Violation issued (HPD, open)
B
02/08/2000
Violation issued (HPD, open)
B
02/08/2000
Violation issued (HPD, open)
B
02/08/2000
Violation issued (HPD, open)
B
02/08/2000
Violation issued (HPD, open)
B
02/08/2000
Violation issued (HPD, open)
B
06/07/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
8203 3RD AVE PROPERTY307/08/2026
HMF 105-14 LLC203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NYX ENGINEERING, PLLC101/29/2026
NEW AIR SOLUTION INC.503/19/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KALE CONSTRUCTION INCGeneral Contractor107/08/2026
KLE CONSTRUCTION INCGeneral Contractor107/08/2026
XH&RC PLBG AND HTG INCPlumbing107/08/2026
A1 SPECIALIZED, INCScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW AIR SOLUTION INC8418503/19/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignPermit IssuedMAD SIGNS INC04/28/2026
DOB NOWGeneral ConstructionSigned-offKALE CONSTRUCTION INC01/07/2025
DOB NOWPlumbingSigned-offXH&RC PLBG AND HTG INC10/21/2024
DOB NOWMechanical SystemsSigned-offKLE CONSTRUCTION INC10/07/2024
BISFPISSUEDMASTER FIRE PREVENTION SYSTEMS03/19/1996
BISPLISSUEDA P PLUMBING&HEATING INC03/05/1996
BISOTISSUEDG AND R GEN CONSTRUCTION CO12/19/1995
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
05/09/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/30/2025Pass-Final General Construction Non-Directive 14PassView ↗
03/13/2025Pass-Final General Construction Non-Directive 14PassView ↗
01/13/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/13/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
03/21/2025FinalTianchen Huprogress
03/21/2025HVAC-R and service water heating equipmentTianchen Huenergy_progress
03/21/2025HVAC-R and service water piping design and insulationTianchen Huenergy_progress
03/21/2025HVAC-R and service water heating system controlsTianchen Huenergy_progress
03/21/2025Fire-Resistant Penetrations and JointsTianchen Huspecial
03/21/2025Mechanical SystemsTianchen Huspecial
03/21/2025Tenant Protection Plan ComplianceTianchen Huspecial
03/21/2025Fire-Resistance Rated ConstructionTianchen Huprogress
03/21/2025Energy Code Compliance InspectionsTianchen Huprogress
02/24/2025Fire-Resistant Penetrations and JointsTianchen Huspecial
02/24/2025Tenant Protection Plan ComplianceTianchen Huspecial
02/24/2025Energy Code Compliance InspectionsTianchen Huprogress
02/24/2025HVAC-R and service water piping design and insulationTianchen Huenergy_progress
02/23/2025Fire-Resistant Penetrations and JointsTianchen Huspecial
02/23/2025Mechanical SystemsTianchen Huspecial
02/23/2025Tenant Protection Plan ComplianceTianchen Huspecial
02/23/2025Energy Code Compliance InspectionsTianchen Huprogress
02/23/2025FinalTianchen Huprogress
02/23/2025Fire-Resistance Rated ConstructionTianchen Huprogress
02/23/2025HVAC-R and service water heating equipmentTianchen Huenergy_progress
02/23/2025HVAC-R and service water heating system controlsTianchen Huenergy_progress
02/23/2025HVAC-R and service water piping design and insulationTianchen Huenergy_progress
▾Documents — 21 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/21/2026Q01115609-P3Request digital key ↗
08/21/2026Q01115609-P1Request digital key ↗
08/21/2026Q01115609-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications15
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/21/2026Q01116498-P1Open ↗
08/21/2026Q01116498-I1Open ↗
08/17/2026Q01352897-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/02/2026Q01115609-I1Open ↗
09/02/2026Q01115609-I1Open ↗
08/25/2026Q01115609-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/02/2026Q01115609-I1Open ↗
08/25/2026Q01115609-P1Open ↗
08/24/2026Q01116498-P1Open ↗