← Back
Multi-story retail building (2+)
121-25 LIBERTY AVENUE
QUEENS · BIN 4203820
💬 Discuss this project
1931Year Built
2Stories
K2Building Class
R6AZoning
2,178 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Multi-story retail building (2+) · Owner of record: 122-01 LIBERTY AVE LLC · 1,430 sf lot · 1.52 FAR built · Flood zone X
Locations of Work
Mechanical
Basement1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HF MANAGEMENT SERVICES407/08/2026
HEALTHFIRST407/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LEON SKVIRSKY PE106/26/2023
MCSWEENEY ENGINEERING202/01/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DOMANI CONSULTING203/21/2026
BUILDING BROTHERS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MARLIN MECHANICAL INCGeneral Contractor107/08/2026
ACTIVE SIGNSScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ARCO ENGINEERING PC3769202/01/2023
Building Lifecycle
All (27)Filed (3)Permit Issued (2)Signed Off (2)Violation (1)Special Inspection (19)
02/18/2025
Signed off — Alteration
INSTALL EXTERIOR ILLUMINATED WALL SIGN (HEALTHFIRST)
Q00878959-I1
07/31/2023
Permit issued — Sign
Q00878959-I1-SG
06/26/2023
Filed — Alteration
INSTALL EXTERIOR ILLUMINATED WALL SIGN (HEALTHFIRST)
Q00878959-I1
05/22/2023
Special inspection requirement — Final
LEON SKVIRSKY
03/03/2023
Signed off — Alteration
Install a/c unit to provide cooling to doctors office in cellar, condenser to be mounted on wall of the backyard of the building. No change to use, egress or occupancy.
Q08028257-I1
02/06/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOSE MANTRANA
02/06/2023
Special inspection requirement — Final
Michael McSweeney
02/06/2023
Special inspection requirement — Energy Code Compliance Inspections
Michael McSweeney
02/06/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Michael McSweeney
02/06/2023
Special inspection requirement — HVAC-R and service water heating equipment
Michael McSweeney
02/06/2023
Special inspection requirement — Maintenance information
Michael McSweeney
02/06/2023
Special inspection requirement — HVAC-R and service water heating system controls
Michael McSweeney
02/06/2023
Special inspection requirement — Duct leakage testing, insulation and design
Michael McSweeney
02/06/2023
Special inspection requirement — Mechanical Systems
JOSE MANTRANA
02/01/2023
Filed — Alteration
Install a/c unit to provide cooling to doctors office in cellar, condenser to be mounted on wall of the backyard of the building. No change to use, egress or occupancy.
Q08028257-P1
01/26/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOSE MANTRANA
01/26/2023
Special inspection requirement — Mechanical Systems
JOSE MANTRANA
01/26/2023
Special inspection requirement — Energy Code Compliance Inspections
Michael McSweeney
01/26/2023
Special inspection requirement — Final
Michael McSweeney
01/26/2023
Special inspection requirement — HVAC-R and service water heating system controls
Michael McSweeney
01/26/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Michael McSweeney
01/26/2023
Special inspection requirement — HVAC-R and service water heating equipment
Michael McSweeney
01/26/2023
Special inspection requirement — Duct leakage testing, insulation and design
Michael McSweeney
01/26/2023
Special inspection requirement — Maintenance information
Michael McSweeney
12/09/2022
Permit issued — Mechanical Systems
Q08028257-I1-MS
12/01/2022
Filed — Alteration
Install a/c unit to provide cooling to doctors office in cellar, condenser to be mounted on wall of the backyard of the building. No change to use, egress or occupancy.
Q08028257-I1
11/21/2019
Violation issued (FDNY_NOV, closed)
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offACTIVE SIGNS INC07/31/2023
DOB NOWMechanical SystemsSigned-offMARLIN MECHANICAL INC12/09/2022
BISPLISSUEDL.RICHARDS PLBG & HTG02/23/1999
BISEQISSUEDCITY SCAFFOLDING02/09/1999
BIS—ISSUEDBHAL'S CUSTOM HOME INC06/05/1998
1 project · most recent 08/03/2023
FiledStatusContractorScope
08/03/2023CompleteRAINBOW ELECTRIC CO., INC—
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
05/22/2023FinalLEON SKVIRSKYprogress
02/06/2023Fire-Resistant Penetrations and JointsJOSE MANTRANAspecial
02/06/2023FinalMichael McSweeneyprogress
02/06/2023Energy Code Compliance InspectionsMichael McSweeneyprogress
02/06/2023HVAC-R and service water piping design and insulationMichael McSweeneyenergy_progress
02/06/2023HVAC-R and service water heating equipmentMichael McSweeneyenergy_progress
02/06/2023Maintenance informationMichael McSweeneyenergy_progress
02/06/2023HVAC-R and service water heating system controlsMichael McSweeneyenergy_progress
02/06/2023Duct leakage testing, insulation and designMichael McSweeneyenergy_progress
02/06/2023Mechanical SystemsJOSE MANTRANAspecial
01/26/2023Fire-Resistant Penetrations and JointsJOSE MANTRANAspecial
01/26/2023Mechanical SystemsJOSE MANTRANAspecial
01/26/2023Energy Code Compliance InspectionsMichael McSweeneyprogress
01/26/2023FinalMichael McSweeneyprogress
01/26/2023HVAC-R and service water heating system controlsMichael McSweeneyenergy_progress
01/26/2023HVAC-R and service water piping design and insulationMichael McSweeneyenergy_progress
01/26/2023HVAC-R and service water heating equipmentMichael McSweeneyenergy_progress
01/26/2023Duct leakage testing, insulation and designMichael McSweeneyenergy_progress
01/26/2023Maintenance informationMichael McSweeneyenergy_progress
▾Documents — 28 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/25/2026Q08028257-P1Request digital key ↗
08/25/2026Q08028257-I1Request digital key ↗
08/24/2026Q00878959-I1Request digital key ↗
▸Seals & Professional Certifications22
▸DOB NOWProgress Inspector Seal & Signature15
08/31/2026Q08028257-I1Open ↗
08/31/2026Q08028257-I1Open ↗
08/31/2026Q08028257-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/31/2026Q08028257-I1Open ↗
08/31/2026Q08028257-I1Open ↗
08/28/2026Q08028257-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/25/2026Q08028257-P1Open ↗
08/25/2026Q08028257-I1Open ↗
08/24/2026Q00878959-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/25/2026Q08028257-P1Open ↗
08/25/2026Q08028257-I1Open ↗
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q08028257-I1Open ↗