← Back
Two stories - detached, small or mid-size
136-05 KEW GARDENS ROAD
QUEENS · BIN 4206288
💬 Discuss this project
1920Year Built
2Stories
A1Building Class
R6Zoning
1,288 sfGross Floor Area
1Units
19 Open Violations ▸FDNY Report ↗
Two stories - detached, small or mid-size · Owner of record: 136 KEW NY LLC · 2,850 sf lot · 0.45 FAR built · Flood zone X
Locations of Work
Architecture
Roof3p · 2 filings · 14 docs
Floor 71p · 1 filing · 4 docs
Floor 6
Floor 51p · 1 filing · 4 docs
Floor 4
Floor 3
Floor 2
Floor 11p · 1 filing · 4 docs
Cellar2p · 2 filings · 14 docs
1 job · most recent 03/28/2025
Storm Water/Sanitary
FiledStatusContractorScope
03/28/2025——Storm, Water/Sanitary
1 job · most recent 12/29/2025
Fence
FiledStatusContractorScope
12/29/2025Permit IssuedDYKER SOLUTIONS INCFence
Building Lifecycle
All (69)Filed (4)Permit Issued (1)Violation (19)Objection (15)Special Inspection (30)
08/21/2026
Violation issued (ECB, open)
Construction
03/09/2026
Permit issued — Construction Fence
Q01123906-S1-FN
02/04/2026
Objection resolved — Addressed
02/03/2026
Objection resolved — Addressed
01/13/2026
Objection raised — Other
12/29/2025
Filed — Full Demolition
TWO STORY FRAME BUILDING FULL DEMOLITION.
Q01123906-S1
06/16/2025
Objection raised — Admin
06/05/2025
Objection resolved — Addressed
04/11/2025
Objection raised — Zoning
03/28/2025
Filed — New Building
NEW INSTALLATIONS OF 3"DOMESTIC AND 4"FIRE SERVICE & ONE 6"COMBINED SANITARY/STORM SERVICE FROM KEW GARDENS ROAD FOR NEW PROPOSED 7-STORY MIX-USED BLDG
Q00976282-I1
03/28/2025
Special inspection requirement — Metering
03/28/2025
Special inspection requirement — Lighting controls
03/28/2025
Special inspection requirement — Air barrier — testing
03/28/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
03/28/2025
Special inspection requirement — Electrical motors and elevators
03/20/2025
Objection raised — Other
12/02/2024
Objection raised — Other
11/18/2024
Filed — Full Demolition
TWO STORY FRAME BUILDING FULL DEMOLITION.
Q01123906-I1
10/08/2024
Special inspection requirement — Structural Stability – Alterations of existing Buildings
Alexander Bomstein
10/08/2024
Special inspection requirement — Demolition
Alexander Bomstein
10/03/2024
Special inspection requirement — Fenestration air leakage
04/01/2024
Special inspection requirement — Fire-Resistance Rated Construction
04/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/01/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
04/01/2024
Special inspection requirement — Energy Code Compliance Inspections
04/01/2024
Special inspection requirement — Insulation placement and R values
04/01/2024
Special inspection requirement — Interior lighting power
04/01/2024
Special inspection requirement — Air barrier - visual inspection
04/01/2024
Special inspection requirement — Lighting in dwelling units
04/01/2024
Special inspection requirement — Exterior lighting power
04/01/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
04/01/2024
Special inspection requirement — Maintenance information
04/01/2024
Special inspection requirement — Fenestration areas
04/01/2024
Special inspection requirement — Protection of exposed foundation insulation
11/23/2022
Objection raised — Zoning
11/23/2022
Objection resolved — Resolved
11/23/2022
Objection raised — Energy
11/23/2022
Objection raised — Admin
11/23/2022
Objection raised — Scope
11/23/2022
Objection raised — Zoning
11/23/2022
Objection resolved — Resolved
11/04/2022
Filed — New Building
DEVELOPMENT OF MIXED-USE (RESIDENTIAL AND COMMUNITY FACILITY) QUALITY HOUSING NEW BUILDING COMPRISING OF 4 STORIES, PENTHOUSE AND CELLAR WITH UNENCLOSED ACCESSORY OFFSTREET PARKINGFOR 3 AUTOMOBILES.
Q08021881-I1
11/04/2022
Special inspection requirement — Energy Code Compliance Inspections
11/04/2022
Special inspection requirement — Lighting in dwelling units
11/04/2022
Special inspection requirement — Maintenance information
11/04/2022
Special inspection requirement — Exterior lighting power
11/04/2022
Special inspection requirement — Lighting controls
11/04/2022
Special inspection requirement — Interior lighting power
11/04/2022
Special inspection requirement — Air barrier - visual inspection
11/04/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
11/04/2022
Special inspection requirement — Fire-Resistance Rated Construction
09/01/2016
Violation issued (HPD, open)
B
09/01/2016
Violation issued (HPD, open)
B
09/01/2016
Violation issued (HPD, open)
B
09/01/2016
Violation issued (HPD, open)
B
09/01/2016
Violation issued (HPD, open)
B
09/01/2016
Violation issued (HPD, open)
A
09/01/2016
Violation issued (HPD, open)
B
09/01/2016
Violation issued (HPD, open)
B
09/01/2016
Violation issued (HPD, open)
A
Latest 60 of 69 events.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/28/2024$998K—QUEENS KEW INC. → 136 KEW NY LLC$775/sf building
05/12/2022$820K—— → —$637/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A&B WORLD CONSULTING212/29/2025
TAN ARCHITECT P.C203/28/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ENKAY DESIGN CONSULTING203/21/2026
YBL NY403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DYKER SOLUTIONS INCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A&B WORLD CONSULTING, INC5704111/18/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedDYKER SOLUTIONS03/09/2026
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
03/28/2025Metering—energy_progress
03/28/2025Lighting controls—energy_progress
03/28/2025Air barrier — testing —energy_progress
03/28/2025Subsurface Investigations (Borings/Test Pits)—special
03/28/2025Electrical motors and elevators—energy_progress
10/08/2024Structural Stability – Alterations of existing BuildingsAlexander Bomsteinspecial
10/08/2024DemolitionAlexander Bomsteinspecial
10/03/2024Fenestration air leakage—energy_progress
04/01/2024Fire-Resistance Rated Construction—progress
04/01/2024Fire-Resistant Penetrations and Joints—special
04/01/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
04/01/2024Energy Code Compliance Inspections—progress
04/01/2024Insulation placement and R values—energy_progress
04/01/2024Interior lighting power—energy_progress
04/01/2024Air barrier - visual inspection—energy_progress
04/01/2024Lighting in dwelling units—energy_progress
04/01/2024Exterior lighting power—energy_progress
04/01/2024Fenestration and door U-factor and product ratings—energy_progress
04/01/2024Maintenance information—energy_progress
04/01/2024Fenestration areas—energy_progress
04/01/2024Protection of exposed foundation insulation—energy_progress
11/04/2022Energy Code Compliance Inspections—progress
11/04/2022Lighting in dwelling units—energy_progress
11/04/2022Maintenance information—energy_progress
11/04/2022Exterior lighting power—energy_progress
Latest 25 of 34.
▾Documents — 36 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/20/2026Q00976282-I1Request digital key ↗
08/20/2026Q00976282-S1Request digital key ↗
08/20/2026Q00976282-S2Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits2
▸BISBPP-5 - Authorization to the Department of Transportation1
09/11/2025440825243Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
09/11/2025440825243Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q00976282-I1Open ↗
08/13/2026Q08021881-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00976282-I1Open ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/25/2026Q08021881-I1Open ↗
08/21/2026Q01123906-S1Open ↗
08/21/2026Q01123906-I1Open ↗
Showing 3 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
09/11/2025440825243Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/11/2025440825243Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWWater Cut-Off1
08/13/2026Q01123906-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026Q01123906-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00976282-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026Q00976282-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/15/2026Q01123906-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
08/13/2026Q00976282-I1Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
09/11/2025440825243Open ↗
▸Other Documents10
▸BISBPP - SUPPORTING DOCUMENTATION3
09/11/2025440825243Open ↗
09/11/2025440825243Open ↗
09/11/2025440825243Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026Q00976282-I1Open ↗
08/13/2026Q08021881-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/15/2026Q01123906-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026Q01123906-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026Q01123906-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q00976282-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026Q01123906-I1Open ↗