← Back
Elevator apt, semi-fireproof without stores
Kew Gardens
82-08 135 STREET · BIN 4206528
💬 Discuss this project
1952Year Built
6Stories
D1Building Class
R6AZoning
53,600 sfGross Floor Area
72Units
LL97 CoveredRent Stabilized35 Open Violations ▸FISP: SAFEFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: WINDSOR OXFORD LLC · 25,846 sf lot · 2.07 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanical
Roof25p · 1 filing · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ARGO REAL ESTATE1407/08/2026
WINDSOR OXFORD COMPANY303/22/2026
WINDSOR OXFORD LLC ARGO R203/22/2026
ARGO403/22/2026
OWNER OF 82-08 135 ST103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JULIAN A. GOMEZ403/21/2026
SYNERGY BUILDING CONSULTANTS303/21/2026
AE DESIGN SOLUTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CS BRIDGE CORPGeneral Contractor907/08/2026
LAWRENCE EXTERIOR RESTORATIONGeneral Contractor907/08/2026
CENTRAL AIR CONDITIONINGGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUILDING CONSULTING ENGIN1034103/01/2024
RAND ENGINEERING & ARCHIT266203/01/2024
Building Lifecycle
All (121)Filed (6)Permit Issued (12)Signed Off (2)Facade (FISP) (18)Violation (60)Inspection (1)Objection (2)Special Inspection (20)
09/30/2025
Violation issued (FDNY_NOV, closed)
08/14/2025
Violation issued (HPD, open)
C
08/14/2025
Violation issued (HPD, open)
B
08/14/2025
Violation issued (HPD, open)
C
08/14/2025
Violation issued (HPD, open)
B
08/14/2025
Violation issued (HPD, open)
C
08/14/2025
Violation issued (HPD, open)
B
08/14/2025
Violation issued (HPD, open)
B
08/14/2025
Violation issued (HPD, open)
A
08/14/2025
Violation issued (HPD, open)
B
07/15/2025
Signed off — Alteration
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q00289004-I1
12/24/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/19/2024
Cycle 9 facade report signed — SAFE
08/09/2024
Cycle 9 facade report signed — SAFE
07/16/2024
Permit issued — Mechanical Systems
Q00504804-S1-MS
06/21/2024
Cycle 9 facade report submitted
06/21/2024
Cycle 9 facade report submitted
06/07/2024
Cycle 9 facade inspection completed
06/07/2024
Cycle 9 facade inspection completed
05/28/2024
Objection resolved — Addressed
05/24/2024
Special inspection requirement — HVAC-R and service water heating system controls
Peter Varsalona
05/24/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Peter Varsalona
05/24/2024
Special inspection requirement — HVAC-R and service water heating equipment
Peter Varsalona
03/15/2024
Objection raised — Energy
03/01/2024
Filed — Alteration
8th Cycle Facade repairs. No change to use egress or occupancy.
Q00504804-S1
02/22/2024
Special inspection requirement — Final
Peter Varsalona
02/22/2024
Special inspection requirement — Tenant Protection Plan Compliance
TONY ONYEAGORO
02/22/2024
Special inspection requirement — Maintenance information
Peter Varsalona
02/22/2024
Special inspection requirement — Electrical motors and elevators
Peter Varsalona
02/22/2024
Special inspection requirement — Mechanical Systems
Peter Varsalona
02/22/2024
Special inspection requirement — Energy Code Compliance Inspections
Peter Varsalona
01/22/2024
Permit issued — General Construction
Q00504804-I1-GC-CX
12/08/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00676685-I1
12/05/2023
Permit issued — Sidewalk Shed
Q00289004-I1-SH
04/15/2023
Violation issued (HPD, closed)
C
04/15/2023
Violation issued (HPD, open)
A
04/15/2023
Violation issued (HPD, closed)
C
04/15/2023
Violation issued (HPD, open)
B
04/15/2023
Violation issued (HPD, open)
B
04/15/2023
Violation issued (HPD, open)
B
04/15/2023
Violation issued (HPD, closed)
C
04/07/2023
Violation issued (ECB, closed)
Construction
04/03/2023
Violation issued (HPD, closed)
C
02/03/2023
Permit issued — Supported Scaffold
Q00676685-I1-SF
01/26/2023
Permit issued — Structural
Q00504804-I1-GC-CX
12/02/2022
Permit issued — Sidewalk Shed
Q00289004-I1-SH
09/30/2022
Permit issued — General Construction
Q00504804-I1-GC-CX
08/21/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/08/2022
Filed — Alteration
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q00289004-P2
04/22/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/22/2022
Violation issued (ECB, closed)
Construction
02/28/2022
Permit issued — Supported Scaffold
Q00676685-I1-SF
02/25/2022
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00676685-I1
02/25/2022
Violation issued (ECB, closed)
Construction
02/13/2022
Violation issued (HPD, open)
C
12/08/2021
Permit issued — Sidewalk Shed
Q00289004-I1-SH
09/17/2021
Cycle 9 facade report submitted
09/15/2021
Cycle 9 facade report signed — UNSAFE
08/19/2021
Permit issued — General Construction
Q00504804-I1-GC-CX
08/17/2021
Cycle 9 facade report submitted
Latest 60 of 121 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedCENTRAL AIR CONDITIONING07/16/2024
DOB NOWGeneral ConstructionPermit IssuedLAWRENCE EXTERIOR RESTORA01/22/2024
DOB NOWSidewalk ShedSigned-offCS BRIDGE CORP12/05/2023
DOB NOWSupported ScaffoldSigned-offLAWRENCE EXTERIOR RESTORA02/03/2023
DOB NOWStructuralPermit IssuedLAWRENCE EXTERIOR RESTORA01/26/2023
DOB NOWSidewalk ShedSigned-offCS BRIDGE CORP12/02/2022
DOB NOWGeneral ConstructionPermit IssuedLAWRENCE EXTERIOR RESTORA09/30/2022
DOB NOWSupported ScaffoldSigned-offLAWRENCE EXTERIOR RESTORA02/28/2022
DOB NOWSidewalk ShedSigned-offCS BRIDGE CORP12/08/2021
DOB NOWGeneral ConstructionPermit IssuedLAWRENCE EXTERIOR RESTORA08/19/2021
DOB NOWSidewalk ShedSigned-offCS BRIDGE CORP12/24/2020
DOB NOWSidewalk ShedSigned-offCS BRIDGE CORP01/03/2020
BISFSISSUEDABILENE, INC11/09/2004
BISOTISSUEDNATIONAL MICROWAVE CONTRACTORS I08/27/1998
BISOTISSUEDM.B WATERPROOFING12/22/1997
BISBLISSUEDABILENE, INC07/19/1996
BISPLISSUEDBELL FUEL OIL, LLC07/19/1996
BISEQISSUEDYORK SCAFFOLDING11/21/1989
1 project · most recent 03/01/2024
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/01/2024Permit IssuedCENTRAL AIR CONDITIONINGVentilation Systems
Ventilation
Greenheck GB-330-VG-20 9,000 CFM · Exhaust Fan ×1
2 projects · most recent 03/12/2024
General Wiring
FiledStatusContractorScope
03/12/2024CompleteBELMONT ELECTRICAL, INCGeneral Wiring
01/14/2020CompleteNASH ELECTRIC SERVICES IN—
1 project · most recent 03/01/2024
Concrete
FiledStatusContractorScope
03/01/2024Permit IssuedCENTRAL AIR CONDITIONINGConcrete
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
12/24/2024Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
05/24/2024HVAC-R and service water heating system controlsPeter Varsalonaenergy_progress
05/24/2024HVAC-R and service water piping design and insulationPeter Varsalonaenergy_progress
05/24/2024HVAC-R and service water heating equipmentPeter Varsalonaenergy_progress
02/22/2024FinalPeter Varsalonaprogress
02/22/2024Tenant Protection Plan ComplianceTONY ONYEAGOROspecial
02/22/2024Maintenance informationPeter Varsalonaenergy_progress
02/22/2024Electrical motors and elevatorsPeter Varsalonaenergy_progress
02/22/2024Mechanical SystemsPeter Varsalonaspecial
02/22/2024Energy Code Compliance InspectionsPeter Varsalonaprogress
06/11/2021Insulation placement and R valuesJohn Monroeenergy_progress
06/11/2021Energy Code Compliance InspectionsJohn Monroeprogress
06/11/2021Air barrier - visual inspectionJohn Monroeenergy_progress
06/11/2021Fenestration and door U-factor and product ratingsJohn Monroeenergy_progress
06/11/2021Fenestration areasJohn Monroeenergy_progress
06/11/2021Fenestration air leakageJohn Monroeenergy_progress
04/15/2021MasonryJohn Monroespecial
04/15/2021Post-installed AnchorsJohn Monroespecial
04/15/2021Structural Steel - High Strength BoltingJohn Monroespecial
04/15/2021FinalJohn Monroeprogress
04/15/2021Structural Stability – Alterations of existing buildingsJohn Monroespecial
▾Documents — 29 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch4
08/26/2026Q00676685-I1Request digital key ↗
08/23/2026Q00504804-P1Request digital key ↗
08/23/2026Q00504804-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed3
08/28/2026Q00289004-P2Request digital key ↗
08/28/2026Q00289004-I1Request digital key ↗
08/15/2026Q00289004-P1Request digital key ↗
▸Seals & Professional Certifications15
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/28/2026Q00289004-I1Open ↗
08/23/2026Q00504804-I1Open ↗
08/13/2026Q00504804-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/25/2026Q00504804-S1Open ↗
08/25/2026Q00504804-S1Open ↗
08/25/2026Q00504804-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/25/2026Q00504804-S1Open ↗
08/25/2026Q00504804-S1Open ↗
08/23/2026Q00504804-I1Open ↗
▸Safety & Tenant Protection3
▸DOB NOWTenant Protection Plan3
08/28/2026Q00289004-P1Open ↗
08/28/2026Q00289004-I1Open ↗
08/13/2026Q00289004-P2Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026Q00504804-S1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWDEP Variance (V5) letter1
08/13/2026Q00504804-I1Open ↗
▸Other Documents2
▸DOB NOWDHCR Document2
08/28/2026Q00289004-I1Open ↗
08/13/2026Q00289004-P2Open ↗