← Back
Elevator apt, semi-fireproof without stores
135-05 HOOVER AVENUE
QUEENS · BIN 4206550
💬 Discuss this project
1952Year Built
6Stories
D1Building Class
R5DZoning
61,218 sfGross Floor Area
78Units
LL97 CoveredRent Stabilized18 Open Violations ▸FISP: SAFEFDNY Report ↗
Elevator apt, semi-fireproof without stores · 31,260 sf lot · 1.96 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanical
Roof19p · 1 filing · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ARGO REAL ESTATE1407/08/2026
THE ARGO CORP RLTY.303/22/2026
ARGO203/22/2026
BILTMORE REALTY ASSOC503/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION203/21/2026
JULIAN A. GOMEZ403/21/2026
SYNERGY BUILDING CONSULTANTS303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CS BRIDGE CORPGeneral Contractor807/08/2026
LAWRENCE EXTERIOR RESTORATIONGeneral Contractor607/08/2026
GELLIS, IRWINElectrical103/21/2026
KONE ELEVATORSElectrical103/21/2026
MURPHY, DANIELElectrical103/21/2026
CENTRAL AIR CONDITIONINGGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUILDING CONSULTING ENGIN1034103/01/2024
RAND ENGINEERING & ARCHIT266203/01/2024
Building Lifecycle
All (122)Filed (6)Permit Issued (11)Signed Off (2)Facade (FISP) (18)Violation (57)Objection (10)Special Inspection (18)
08/27/2025
Violation issued (HPD, open)
B
08/27/2025
Violation issued (HPD, open)
A
08/27/2025
Violation issued (HPD, open)
B
08/27/2025
Violation issued (HPD, open)
C
08/27/2025
Violation issued (HPD, open)
B
08/27/2025
Violation issued (HPD, open)
B
07/15/2025
Signed off — Alteration
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q00293168-I1
08/19/2024
Cycle 9 facade report signed — SAFE
08/19/2024
Cycle 9 facade report signed — SAFE
07/31/2024
Cycle 9 facade inspection completed
07/01/2024
Permit issued — Mechanical Systems
Q00504811-S1-MS
06/21/2024
Cycle 9 facade report submitted
06/21/2024
Cycle 9 facade report submitted
06/07/2024
Cycle 9 facade inspection completed
05/14/2024
Permit issued — Structural
Q00504811-I1-GC-CX
04/25/2024
Objection resolved — Addressed
04/25/2024
Objection resolved — Addressed
04/25/2024
Objection resolved — Addressed
04/25/2024
Objection resolved — Addressed
04/25/2024
Objection resolved — Addressed
04/25/2024
Special inspection requirement — Shutoff dampers
Peter Varsalona
03/18/2024
Violation issued (ECB, closed)
Construction
03/08/2024
Objection raised — Zoning
03/08/2024
Objection raised — Admin
03/08/2024
Objection raised — Scope
03/08/2024
Objection raised — Fire_Protection
03/08/2024
Objection raised — Inspections
03/01/2024
Filed — Alteration
8th Cycle Facade Repairs. No change to use, egress or occupancy.
Q00504811-S1
03/01/2024
Special inspection requirement — Energy Code Compliance Inspections
Peter Varsalona
02/22/2024
Special inspection requirement — Final
Peter Varsalona
02/22/2024
Special inspection requirement — Electrical motors and elevators
Peter Varsalona
02/22/2024
Special inspection requirement — Mechanical Systems
Peter Varsalona
02/22/2024
Special inspection requirement — Tenant Protection Plan Compliance
TONY ONYEAGORO
02/22/2024
Special inspection requirement — Maintenance information
Peter Varsalona
01/02/2024
Permit issued — Sidewalk Shed
Q00293168-I1-SH
12/08/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00783145-I1
08/09/2023
Violation issued (ECB, closed)
Construction
08/09/2023
Violation issued (ECB, closed)
Construction
08/03/2023
Violation issued (HPD, open)
A
08/03/2023
Violation issued (HPD, open)
B
08/03/2023
Violation issued (HPD, open)
C
04/17/2023
Violation issued (HPD, closed)
C
02/02/2023
Permit issued — Supported Scaffold
Q00783145-I1-SF
01/26/2023
Permit issued — Structural
Q00504811-I1-GC-CX
01/06/2023
Violation issued (HPD, open)
A
01/06/2023
Violation issued (HPD, open)
A
01/06/2023
Violation issued (HPD, open)
C
01/05/2023
Permit issued — Sidewalk Shed
Q00293168-I1-SH
12/02/2022
Cycle 9 facade report submitted
12/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/29/2022
Cycle 9 facade report signed — UNSAFE
11/22/2022
Cycle 9 facade inspection completed
08/17/2022
Violation issued (ECB, closed)
Construction
08/17/2022
Violation issued (ECB, closed)
Construction
08/01/2022
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00783145-I1
08/01/2022
Permit issued — Supported Scaffold
Q00783145-I1-SF
06/02/2022
Filed — Alteration
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q00293168-P2
04/27/2022
Permit issued — General Construction
Q00504811-I1-GC-CX
03/21/2022
Cycle 9 facade report signed — UNSAFE
03/18/2022
Violation issued (HPD, open)
C
Latest 60 of 122 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedCENTRAL AIR CONDITIONING07/01/2024
DOB NOWStructuralPermit IssuedLAWRENCE EXTERIOR RESTORA05/14/2024
DOB NOWSidewalk ShedSigned-offCS BRIDGE CORP01/02/2024
DOB NOWSupported ScaffoldSigned-offLAWRENCE EXTERIOR RESTORA02/02/2023
DOB NOWStructuralPermit IssuedLAWRENCE EXTERIOR RESTORA01/26/2023
DOB NOWSidewalk ShedSigned-offCS BRIDGE CORP01/05/2023
DOB NOWSupported ScaffoldSigned-offLAWRENCE EXTERIOR RESTORA08/01/2022
DOB NOWGeneral ConstructionPermit IssuedLAWRENCE EXTERIOR RESTORA04/27/2022
DOB NOWSidewalk ShedSigned-offCS BRIDGE CORP01/05/2022
DOB NOWSidewalk ShedSigned-offCS BRIDGE CORP01/06/2021
DOB NOWSidewalk ShedSigned-offCS BRIDGE CORP01/10/2020
BISOTISSUEDABILENE INC11/09/2004
BISOTISSUEDNATIONAL MICROWAVE CONTRACTOR08/06/1998
BISEQISSUEDM.B WATERPROOFING03/03/1998
BISOTISSUEDM.B WATERPROOFING03/03/1998
BISFSISSUEDABILENE, INC07/31/1996
1 project · most recent 03/01/2024
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/01/2024Permit IssuedCENTRAL AIR CONDITIONINGVentilation Systems
Ventilation
Greenheck GB-330-VG-20 9,000 CFM · Exhaust Fan ×1
3 projects · most recent 01/07/2025
General Wiring
FiledStatusContractorScope
01/07/2025CompleteVILANOVA ELECL CONTS LLC—
03/13/2024CompleteBELMONT ELECTRICAL, INCGeneral Wiring
01/08/2020CompleteNASH ELECTRIC SERVICES IN—
1 project · most recent 03/01/2024
Concrete
FiledStatusContractorScope
03/01/2024Permit IssuedCENTRAL AIR CONDITIONINGConcrete
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
04/25/2024Shutoff dampersPeter Varsalonaenergy_progress
03/01/2024Energy Code Compliance InspectionsPeter Varsalonaprogress
02/22/2024FinalPeter Varsalonaprogress
02/22/2024Electrical motors and elevatorsPeter Varsalonaenergy_progress
02/22/2024Mechanical SystemsPeter Varsalonaspecial
02/22/2024Tenant Protection Plan ComplianceTONY ONYEAGOROspecial
02/22/2024Maintenance informationPeter Varsalonaenergy_progress
10/01/2021Fenestration and door U-factor and product ratingsJohn Monroeenergy_progress
10/01/2021Energy Code Compliance InspectionsJohn Monroeprogress
10/01/2021Fenestration areasJohn Monroeenergy_progress
10/01/2021Air barrier - visual inspectionJohn Monroeenergy_progress
10/01/2021Fenestration air leakageJohn Monroeenergy_progress
10/01/2021Insulation placement and R valuesJohn Monroeenergy_progress
04/15/2021MasonryJohn Monroespecial
04/15/2021FinalJohn Monroeprogress
04/15/2021Structural Stability – Alterations of existing buildingsJohn Monroespecial
04/15/2021Structural Steel - High Strength BoltingJohn Monroespecial
04/15/2021Post-installed AnchorsJohn Monroespecial
▾Documents — 29 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch4
08/26/2026Q00783145-I1Request digital key ↗
08/23/2026Q00504811-S1Request digital key ↗
08/23/2026Q00504811-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed3
08/27/2026Q00293168-I1Request digital key ↗
08/15/2026Q00293168-P2Request digital key ↗
08/15/2026Q00293168-P1Request digital key ↗
▸Seals & Professional Certifications15
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/27/2026Q00293168-P2Open ↗
08/27/2026Q00293168-P1Open ↗
08/27/2026Q00293168-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/31/2026Q00504811-S1Open ↗
08/31/2026Q00504811-S1Open ↗
08/31/2026Q00504811-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/31/2026Q00504811-S1Open ↗
08/31/2026Q00504811-S1Open ↗
08/29/2026Q00504811-I1Open ↗
▸Safety & Tenant Protection3
▸DOB NOWTenant Protection Plan3
08/13/2026Q00293168-P1Open ↗
08/13/2026Q00293168-I1Open ↗
08/13/2026Q00293168-P2Open ↗
▸Approvals, Objections & Sign-offs2
▸DOB NOWDEP Variance (V5) letter2
08/13/2026Q00504811-S1Open ↗
08/13/2026Q00504811-I1Open ↗
▸Other Documents2
▸DOB NOWDHCR Document2
08/13/2026Q00293168-I1Open ↗
08/13/2026Q00293168-P2Open ↗