← Back
Primarily 5-6 family with 1 store or office
88-12 161 STREET
QUEENS · BIN 4208955
💬 Discuss this project
1935Year Built
3Stories
S5Building Class
R7XZoning
5,772 sfGross Floor Area
6Units
Rent Stabilized16 Open Violations ▸FDNY Report ↗
Primarily 5-6 family with 1 store or office · Owner of record: 26TH ST. HOLDING · 2,580 sf lot · 2.24 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Floor 38p · 1 filing · 20 docs
Floor 28p · 1 filing · 20 docs
Floor 18p · 1 filing · 20 docs
Cellar10p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
26TH ST. HOLDING1603/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TABRIZ GROUP ENTERPRISES407/06/2026
TABRIZ DESIGN GROUP301/29/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
TABRIZ DESIGN GROUP103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Y R A DEVELOPMENT CORPGeneral Contractor603/21/2026
J&J DESIGNS INCGeneral Contractor303/21/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
ROCK E SMALL PLBG&HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TABRIZ GROUP ENTERPRISES3275707/06/2026
Building Lifecycle
All (117)Filed (7)Permit Issued (5)Signed Off (3)Violation (60)Inspection (12)Objection (6)Special Inspection (24)
08/17/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
BAKHTIAR SHAMLOO
08/17/2026
Special inspection requirement — Energy Code Compliance Inspections
BAKHTIAR SHAMLOO
08/17/2026
Special inspection requirement — Interior lighting power
BAKHTIAR SHAMLOO
08/17/2026
Special inspection requirement — Lighting in dwelling units
BAKHTIAR SHAMLOO
08/17/2026
Special inspection requirement — Metering
BAKHTIAR SHAMLOO
07/06/2026
Filed — Alteration CO
conversion of existing open first floor, rear commercial space to an apartment - amend existing certificate of occupancy.
Q00644880-P4
07/06/2026
Special inspection requirement — Metering
BAKHTIAR SHAMLOO
07/06/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
BAKHTIAR SHAMLOO
07/06/2026
Special inspection requirement — Energy Code Compliance Inspections
BAKHTIAR SHAMLOO
07/06/2026
Special inspection requirement — Lighting in dwelling units
BAKHTIAR SHAMLOO
07/06/2026
Special inspection requirement — Interior lighting power
BAKHTIAR SHAMLOO
05/07/2026
Violation issued (HPD, open)
A
12/10/2025
Filed — Alteration CO
conversion of existing open first floor, rear commercial space to an apartment - amend existing certificate of occupancy.
Q00644880-P3
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/18/2025
Signed off — Alteration
INSTALLATION OF FIVE SPRINKLER HEADS AT THE FIRST FLOOR REAR APARTMENT, OFF THE EXISTING DOMESTIC WATER LINE.
Q01168049-I1
07/16/2025
Violation issued (HPD, open)
C
07/16/2025
Violation issued (HPD, open)
C
07/16/2025
Violation issued (HPD, open)
C
07/16/2025
Violation issued (HPD, open)
B
07/14/2025
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
06/12/2025
Violation issued (HPD, open)
A
02/27/2025
Inspection — Certified Sprinkler (PL)-SP-Fixtures (PL)-Finish
Certified
View inspection ↗
02/21/2025
Permit issued — Plumbing
Q01168049-I1-PL
01/29/2025
Filed — Alteration
INSTALLATION OF FIVE SPRINKLER HEADS AT THE FIRST FLOOR REAR APARTMENT, OFF THE EXISTING DOMESTIC WATER LINE.
Q01168049-I1
01/16/2025
Special inspection requirement — Sprinkler Systems
BAKHTIAR SHAMLOO
07/25/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/26/2024
Filed — Alteration CO
conversion of existing open first floor, rear commercial space to an apartment - amend existing certificate of occupancy.
Q00644880-P2
05/31/2024
Special inspection requirement — Energy Code Compliance Inspections
BAKHTIAR SHAMLOO
05/31/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
BAKHTIAR SHAMLOO
05/31/2024
Special inspection requirement — Lighting in dwelling units
BAKHTIAR SHAMLOO
05/31/2024
Special inspection requirement — Interior lighting power
BAKHTIAR SHAMLOO
05/31/2024
Special inspection requirement — Metering
BAKHTIAR SHAMLOO
04/22/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/15/2024
Violation issued (HPD, open)
A
04/15/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
03/26/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/28/2023
Violation issued (HPD, open)
A
11/16/2022
Violation issued (HPD, closed)
I
10/31/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/03/2022
Signed off — Alteration
plumbing work in conjunction with alteration application # Q00644880
Q00696786-I1
08/01/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/08/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/29/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/17/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/17/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/22/2022
Permit issued — Plumbing
Q00696786-I1-PL
04/19/2022
Filed — Alteration
plumbing work in conjunction with alteration application # Q00644880
Q00696786-I1
03/04/2022
Violation issued (HPD, open)
A
01/06/2022
Permit issued — General Construction
Q00644880-I1-GC
12/10/2021
Filed — Alteration CO
conversion of existing open first floor, rear commercial space to an apartment - amend existing certificate of occupancy.
Q00644880-I1
06/02/2021
Signed off — Alteration
REPLACEMENT OF TWO EXISTING WINDOWS AT FRONT OF 1ST FLOOR WITH ONE STORE FRONT TYPE WINDOW AND ADD SECOND ENTRANCE TO THE OFFICE UNIT AT THE FRONT OF BUILDING
Q00454442-I1
05/25/2021
Violation issued (HPD, closed)
B
05/25/2021
Violation issued (HPD, open)
C
05/25/2021
Violation issued (HPD, open)
C
04/20/2021
Violation issued (ECB, closed)
Construction
Latest 60 of 117 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR02/21/2025
DOB NOWPlumbingSigned-offROCK E SMALL PLBG&HTG INC04/22/2022
DOB NOWGeneral ConstructionPermit IssuedJ&J DESIGNS INC01/06/2022
DOB NOWGeneral ConstructionSigned-offY R A DEVELOPMENT CORP04/16/2021
DOB NOWGeneral ConstructionSigned-offY R A DEVELOPMENT CORP03/15/2021
5 projects · most recent 09/15/2023
General Wiring
FiledStatusContractorScope
09/15/2023CompleteC & A ELECTRICAL CORPGeneral Wiring
05/30/2022CompleteC & A ELECTRICAL CORPGeneral Wiring
11/12/2020CancelledC & A ELECTRICAL CORPGeneral Wiring
11/12/2020CompleteC & A ELECTRICAL CORPGeneral Wiring
03/18/2019CancelledAGIR ELEC'L LTD. D/B/A—
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
07/14/2025Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
02/27/2025Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
07/25/2024Pass-Final CND-Occupancy InspectionPassView ↗
04/22/2024Pass-Final CND-Occupancy InspectionPassView ↗
04/15/2024Fail-Final CND-Occupancy InspectionFailView ↗
03/26/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/31/2022Pass-Final CND-Occupancy InspectionPassView ↗
08/01/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/08/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/29/2022Pass-Final CND-Occupancy InspectionPassView ↗
05/17/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/17/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
08/17/2026Structural Stability – Alterations of existing buildingsBAKHTIAR SHAMLOOspecial
08/17/2026Energy Code Compliance InspectionsBAKHTIAR SHAMLOOprogress
08/17/2026Interior lighting powerBAKHTIAR SHAMLOOenergy_progress
08/17/2026Lighting in dwelling unitsBAKHTIAR SHAMLOOenergy_progress
08/17/2026MeteringBAKHTIAR SHAMLOOenergy_progress
07/06/2026MeteringBAKHTIAR SHAMLOOenergy_progress
07/06/2026Structural Stability – Alterations of existing buildingsBAKHTIAR SHAMLOOspecial
07/06/2026Energy Code Compliance InspectionsBAKHTIAR SHAMLOOprogress
07/06/2026Lighting in dwelling unitsBAKHTIAR SHAMLOOenergy_progress
07/06/2026Interior lighting powerBAKHTIAR SHAMLOOenergy_progress
01/16/2025Sprinkler SystemsBAKHTIAR SHAMLOOspecial
05/31/2024Energy Code Compliance InspectionsBAKHTIAR SHAMLOOprogress
05/31/2024Structural Stability – Alterations of existing buildingsBAKHTIAR SHAMLOOspecial
05/31/2024Lighting in dwelling unitsBAKHTIAR SHAMLOOenergy_progress
05/31/2024Interior lighting powerBAKHTIAR SHAMLOOenergy_progress
05/31/2024MeteringBAKHTIAR SHAMLOOenergy_progress
02/09/2021Structural Stability – Alterations of existing buildingsBAKHTIAR SHAMLOOspecial
01/22/2021Fenestration air leakageBAKHTIAR SHAMLOOenergy_progress
01/22/2021Fenestration areasBAKHTIAR SHAMLOOenergy_progress
01/15/2021Fenestration and door U-factor and product ratingsBAKHTIAR SHAMLOOenergy_progress
01/14/2021FinalHARI SONIprogress
01/14/2021Concrete - Cast-In-PlaceBAKHTIAR SHAMLOOspecial
01/14/2021MasonryBAKHTIAR SHAMLOOspecial
01/14/2021Energy Code ComplianceBAKHTIAR SHAMLOOprogress
▾Documents — 45 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch6
08/26/2026Q00696786-I1Request digital key ↗
08/21/2026Q01168049-I1Request digital key ↗
08/18/2026Q00644880-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - General Construction1
08/14/2026Q00454442-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00644880-I1Open ↗
▸Seals & Professional Certifications24
▸DOB NOWProgress Inspector Seal & Signature11
08/31/2026Q00644880-P4Open ↗
08/31/2026Q00644880-P4Open ↗
08/29/2026Q00644880-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/27/2026Q00454442-I1Open ↗
08/21/2026Q01168049-I1Open ↗
08/18/2026Q00644880-P4Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/31/2026Q00644880-P4Open ↗
08/30/2026Q01168049-I1Open ↗
08/29/2026Q00644880-I1Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist4
08/18/2026Q00644880-P4Open ↗
08/13/2026Q00644880-I1Open ↗
08/13/2026Q00644880-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00644880-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/14/2026Q00454442-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00454442-I1Open ↗
08/13/2026Q00644880-I1Open ↗
▸Other Documents5
▸DOB NOWProperty Ownership Certification4
08/18/2026Q00644880-P4Open ↗
08/13/2026Q00644880-P2Open ↗
08/13/2026Q00644880-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFinal Survey1
08/13/2026Q00644880-I1Open ↗