← Back
Elevator apt, semi-fireproof without stores
89-38 164 STREET
QUEENS · BIN 4209583
💬 Discuss this project
1928Year Built
6Stories
D1Building Class
C4-4DZoning
135,643 sfGross Floor Area
200Units
LL97 CoveredRent Stabilized124 Open Violations 123 unresolved · 1 paperwork only ▸FDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: SM REALTY LLC · 38,200 sf lot · 3.55 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JASCO209/03/2026
SM REALTY2203/22/2026
US MANAGEMENT CO.303/22/2026
MARKLAND ESTATES INC.603/22/2026
MARRLAND ESTATES103/22/2026
MARALDA PROPERTIES INC303/22/2026
MANALDA PROPERTIES INC103/22/2026
MOROLALA PROPERTIES103/22/2026
NYC AMERICAN MANAGEMENT,I203/22/2026
BAYSWATER GARDENS203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NODE ARCHITECTURE,ENGINEERING, CONS208/13/2026
MCHENERY TESTING LAB106/02/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NODE ENGINEERING CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NELSON, RElectrical103/21/2026
NIZAMOODEEN, AZAMOODEENElectrical103/21/2026
AKALA CONSTRUCTIONGeneral Contractor109/03/2026
ELITE QUALITY CONSTRUCTIOGeneral Contractor109/25/2026
JASCO, INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NODE ARCHITECTURE,ENGINEE6799208/13/2026
RI CONSULTING SERVICES IN8904106/02/2026
Building Lifecycle
All (79)Filed (4)Permit Issued (3)Violation (60)Objection (4)Special Inspection (8)
09/24/2026
Permit issued — Suspended Scaffold
Q01406840-I1-SC
09/02/2026
Permit issued — Sidewalk Shed
Q01410582-I1-SH
08/14/2026
Special inspection requirement — Masonry
Radomir Delic
08/14/2026
Special inspection requirement — Tenant Protection Plan Compliance
Radomir Delic
08/14/2026
Special inspection requirement — Final
Radomir Delic
08/13/2026
Filed — Alteration
Filing Application for Facade Repairs
Q01095937-P1
08/04/2026
Special inspection requirement — Masonry
Radomir Delic
08/04/2026
Special inspection requirement — Tenant Protection Plan Compliance
Radomir Delic
08/04/2026
Special inspection requirement — Final
Radomir Delic
07/15/2026
Violation issued (HPD, open)
C
06/17/2026
Violation issued (HPD, open)
B
06/17/2026
Violation issued (HPD, open)
B
06/15/2026
Objection raised — Other
06/15/2026
Objection resolved — Addressed
06/11/2026
Objection raised — Other
06/11/2026
Objection resolved — Addressed
06/10/2026
Violation issued (HPD, open)
B
06/02/2026
Filed — Alteration
SUSPENDED SCAFFOLD OUTRIGGER SYSTEM INSTALLATION FOR FACADE REPAIRS AND INSPECTIONS.
Q01406840-I1
06/02/2026
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q01410582-I1
06/02/2026
Permit issued — Sidewalk Shed
Q01410582-I1-SH
05/24/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Md Istiaque Hasan
05/24/2026
Special inspection requirement — Post-installed Anchors
Md Istiaque Hasan
05/16/2026
Violation issued (HPD, closed)
B
05/16/2026
Violation issued (HPD, closed)
B
05/16/2026
Violation issued (HPD, closed)
B
04/24/2026
Violation issued (HPD, closed)
C
04/24/2026
Violation issued (HPD, closed)
B
04/24/2026
Violation issued (HPD, closed)
C
04/24/2026
Violation issued (HPD, closed)
B
04/24/2026
Violation issued (HPD, closed)
C
02/18/2026
Violation issued (HPD, closed)
C
01/28/2026
Violation issued (HPD, closed)
C
01/28/2026
Violation issued (HPD, closed)
C
08/15/2025
Violation issued (HPD, closed)
C
08/15/2025
Violation issued (HPD, closed)
B
08/15/2025
Violation issued (HPD, closed)
C
08/15/2025
Violation issued (HPD, closed)
B
08/15/2025
Violation issued (HPD, closed)
C
08/15/2025
Violation issued (HPD, closed)
B
03/19/2025
Violation issued (HPD, closed)
C
11/03/2024
Violation issued (HPD, closed)
B
11/03/2024
Violation issued (HPD, closed)
B
11/03/2024
Violation issued (HPD, closed)
B
11/03/2024
Violation issued (HPD, closed)
C
11/03/2024
Violation issued (HPD, closed)
B
11/03/2024
Violation issued (HPD, closed)
C
08/29/2024
Filed — Alteration
Filing Application for Facade Repairs
Q01095937-I1
06/14/2024
Violation issued (HPD, closed)
C
06/14/2024
Violation issued (HPD, closed)
B
06/14/2024
Violation issued (HPD, closed)
B
06/04/2024
Violation issued (HPD, closed)
B
06/04/2024
Violation issued (HPD, closed)
A
06/04/2024
Violation issued (HPD, closed)
A
06/04/2024
Violation issued (HPD, closed)
C
06/04/2024
Violation issued (HPD, closed)
B
06/04/2024
Violation issued (HPD, closed)
C
04/25/2024
Violation issued (HPD, closed)
A
04/25/2024
Violation issued (HPD, closed)
C
04/25/2024
Violation issued (HPD, closed)
C
04/23/2024
Violation issued (HPD, closed)
B
Latest 60 of 79 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedELITE QUALITY CONSTRUCTIO09/24/2026
DOB NOWSidewalk ShedPermit IssuedAKALA CONSTRUCTION INC09/02/2026
DOB NOWSidewalk ShedPermit IssuedJASCO, INC06/02/2026
BISPLISSUEDA & C HTG SERVICES, INC06/08/2007
BISPLISSUEDPOSITIVE PLG AND HEATING CORP07/02/2001
BISFBISSUEDPOSITIVE PLG AND HEATING06/27/2001
BISPLISSUEDDUAL FUEL PLG AND HEATING01/28/1998
2 projects · most recent 06/02/2026
General Wiring
FiledStatusContractorScope
06/02/2026Permit IssuedRICHARD NEU—
09/26/2025CompleteKENNETH ELECTRIC INCGeneral Wiring
1 project · most recent 06/02/2026
Sidewalk Shed
FiledStatusContractorScope
06/02/2026Permit IssuedAKALA CONSTRUCTION INCSidewalk Shed
1 project · most recent 06/02/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
06/02/2026Permit IssuedELITE QUALITY CONSTRUCTIOSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
08/14/2026MasonryRadomir Delicspecial
08/14/2026Tenant Protection Plan ComplianceRadomir Delicspecial
08/14/2026FinalRadomir Delicprogress
08/04/2026MasonryRadomir Delicspecial
08/04/2026Tenant Protection Plan ComplianceRadomir Delicspecial
08/04/2026FinalRadomir Delicprogress
05/24/2026Alternative Materials - OTCR Buildings Bulletin NumberMd Istiaque Hasanspecial
05/24/2026Post-installed AnchorsMd Istiaque Hasanspecial
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/21/2026Q01095937-P1Request digital key ↗
08/21/2026Q01095937-I1Request digital key ↗
08/16/2026Q01410582-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/21/2026Q01095937-P1Open ↗
08/21/2026Q01095937-I1Open ↗
08/16/2026Q01410582-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026Q01406840-I1Open ↗
08/28/2026Q01406840-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/21/2026Q01095937-P1Open ↗
08/21/2026Q01095937-I1Open ↗
▸Other Documents2
▸DOB NOWManufacturer's Specifications1
08/15/2026Q01406840-I1Open ↗
▸DOB NOWCalculations1
08/15/2026Q01406840-I1Open ↗