Three families
85-52 168 PLACE
QUEENS · BIN 4210741
💬 Discuss this project
1970Year Built
3Stories
C0Building Class
R4AZoning
2,560 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Three families · Owner of record: ZOHENAS LLC · 3,400 sf lot · 0.75 FAR built · Flood zone X
Locations of Work
Architecture
Cellar1p · 1 filing · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ZOHENAS LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/19/2017$1.1M—— → —$443/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
QUAMAR ZAMAN302/24/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CHANDA ENGINEERING CONSULTANT603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPLEN CONSTRUCTION INCGeneral Contractor303/21/2026
WATSON'S PLBG, HTG, & BDGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CHANDA ENG. CONSULTANT PC6842302/24/2023
Building Lifecycle
All (31)Filed (3)Permit Issued (2)Signed Off (1)Violation (9)Inspection (5)Objection (4)Special Inspection (7)
11/27/2023
Violation issued (HPD, closed)
I
04/20/2023
Signed off — Alteration
PROPOSED HOME OCCUPATION (DOCTOR OFFICE, AS PER ZR 12-10) AT THE 1ST FLOOR TO BE USED AS'ACCESSORY USE' IN CONNECTION WITH 1ST FLOOR DWELLING UNIT
Q00674371-I1
04/06/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/28/2023
Violation issued (HPD, closed)
A
03/06/2023
Special inspection requirement — Interior lighting power
QUAMAR ZAMAN
03/06/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
KARTIK CHANDA
03/06/2023
Special inspection requirement — Lighting controls
QUAMAR ZAMAN
02/28/2023
Objection resolved — Addressed
02/27/2023
Objection raised — Scope
02/24/2023
Filed — Alteration
PROPOSED HOME OCCUPATION (DOCTOR OFFICE, AS PER ZR 12-10) AT THE 1ST FLOOR TO BE USED AS'ACCESSORY USE' IN CONNECTION WITH 1ST FLOOR DWELLING UNIT
Q00674371-P1
02/24/2023
Special inspection requirement — Interior lighting power
QUAMAR ZAMAN
02/24/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
KARTIK CHANDA
02/24/2023
Special inspection requirement — Lighting controls
QUAMAR ZAMAN
12/21/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/21/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/14/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/16/2022
Violation issued (HPD, closed)
I
10/18/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/10/2022
Permit issued — Plumbing
Q00681636-I1-PL
04/04/2022
Permit issued — General Construction
Q00674371-I1-GC
03/04/2022
Violation issued (HPD, closed)
A
02/22/2022
Objection raised — Scope
02/22/2022
Objection resolved — Addressed
02/17/2022
Filed — Alteration
Installation two fixture bathroom and two hand wash sink for home occupation area. Relocate existing kitchen oven & sink rear side of 1st floor dwelling unit.
Q00681636-I1
02/17/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
KARTIK CHANDA
02/06/2022
Filed — Alteration
PROPOSED HOME OCCUPATION (DOCTOR OFFICE, AS PER ZR 12-10) AT THE 1ST FLOOR TO BE USED AS'ACCESSORY USE' IN CONNECTION WITH 1ST FLOOR DWELLING UNIT
Q00674371-I1
04/15/2021
Violation issued (HPD, closed)
A
12/05/2017
Violation issued (HPD, closed)
I
11/21/2016
Violation issued (HPD, closed)
I
10/16/2015
Violation issued (HPD, closed)
I
02/27/2015
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offWATSON'S PLBG, HTG, & BDG06/10/2022
DOB NOWGeneral ConstructionSigned-offSPLEN CONSTRUCTION INC04/04/2022
BISPLRE-ISSUEDMANILAND PLG HEATING INC11/12/1996
1 project · most recent 02/17/2022
Gas Water/Sanitary
FiledStatusContractorScope
02/17/2022Signed-offWATSON'S PLBG, HTG, & BDGGas, Water/Sanitary
1 project · most recent 04/22/2022
General Wiring
FiledStatusContractorScope
04/22/2022CompleteA.C. MORGAN ELECTRICGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
04/06/2023Pass-Final General Construction Non-Directive 14PassView ↗
12/21/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/21/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/14/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/18/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
03/06/2023Interior lighting powerQUAMAR ZAMANenergy_progress
03/06/2023Fire-Resistant Penetrations and JointsKARTIK CHANDAspecial
03/06/2023Lighting controlsQUAMAR ZAMANenergy_progress
02/24/2023Interior lighting powerQUAMAR ZAMANenergy_progress
02/24/2023Fire-Resistant Penetrations and JointsKARTIK CHANDAspecial
02/24/2023Lighting controlsQUAMAR ZAMANenergy_progress
02/17/2022Fire-Resistant Penetrations and JointsKARTIK CHANDAspecial
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/25/2026Q00674371-I1Request digital key ↗
08/15/2026Q00681636-I1Request digital key ↗
08/14/2026Q00674371-P1Request digital key ↗
▸Seals & Professional Certifications10
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026Q00674371-I1Open ↗
09/01/2026Q00674371-I1Open ↗
08/22/2026Q00674371-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/26/2026Q00681636-I1Open ↗
08/25/2026Q00674371-I1Open ↗
08/25/2026Q00674371-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026Q00681636-I1Open ↗
09/01/2026Q00674371-I1Open ↗
08/22/2026Q00674371-P1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/25/2026Q00674371-I1Open ↗
08/15/2026Q00681636-I1Open ↗
08/14/2026Q00674371-P1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00674371-I1Open ↗