← Back
Two family converted from one family
171-08 107 AVENUE
QUEENS · BIN 4218347
💬 Discuss this project
1920Year Built
2.5Stories
B3Building Class
R4-1Zoning
2,174 sfGross Floor Area
2Units
6 Open Violations ▸FDNY Report ↗
Two family converted from one family · 2,500 sf lot · 0.87 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingGeneralOther
Roof2p · 2 filings · 20 docs
Floor 24p · 2 filings · 20 docs
Floor 12p · 2 filings · 20 docs
Cellar1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
YAFEMEAD CORP103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/26/2021$630K—Private party → Private party$290/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NY State Solar LLC403/21/2026
BUILDING ENGINEERING SYSTEM403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
YAFE MEOD CORPGeneral Contractor1007/08/2026
NYSS LLCGeneral Contractor303/21/2026
BT'S PLUMBING AND HEATINGPlumbing107/08/2026
PLBG P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GREEN RIVER ENVIRONMENTAL7841201/28/2025
ALL STATE PROPERTY INSPEC4288609/25/2024
Building Lifecycle
All (61)Filed (9)Permit Issued (7)Signed Off (4)Violation (3)Inspection (8)Special Inspection (30)
04/01/2025
Signed off — Alteration
APPLICATION BEING FILED TO REMOVE 17 EXISTING FIXTURES AND INSTALL 21 NEW FIXTURES, REPLACE HWH AND BOLIER WITH DIRECT VENT CONDENSING GAS COMBINATION BOILERS AT EXISTING 2 FAMILY HOUSE.
Q00575604-I1
03/19/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
02/27/2025
Signed off — Alteration
APPLICATION BEING FILED TO BUILD A 2 STORY REAR EXTENSION ON AN EXISTING 2 FAMILY HOUSE AND TO DO COMPLETE INTERIOR RENOVATION OF EXISTING BUILDING.
Q00575550-I1
02/21/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/08/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
01/30/2025
Signed off — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS
Q01080155-I1
01/29/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
ROBERT MASONE
01/29/2025
Special inspection requirement — Air barrier - visual inspection
ROBERT MASONE
01/29/2025
Special inspection requirement — Final
ROBERT MASONE
01/29/2025
Special inspection requirement — Energy Code Compliance Inspections
ROBERT MASONE
01/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBERT MASONE
01/28/2025
Filed — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS
Q01080155-P1
01/09/2025
Special inspection requirement — Air barrier - visual inspection
ROBERT MASONE
01/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBERT MASONE
01/09/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
ROBERT MASONE
01/09/2025
Special inspection requirement — Energy Code Compliance Inspections
ROBERT MASONE
01/09/2025
Special inspection requirement — Final
ROBERT MASONE
11/25/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/24/2024
Signed off — Alteration
Q00648938-I1
09/27/2024
Special inspection requirement — Energy Code Compliance Inspections
SEBERT DYER
09/27/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
SEBERT DYER
09/27/2024
Special inspection requirement — Maintenance information
SEBERT DYER
09/27/2024
Special inspection requirement — HVAC-R and service water heating equipment
SEBERT DYER
09/27/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBERT DYER
09/25/2024
Filed — Alteration
APPLICATION BEING FILED TO REMOVE 17 EXISTING FIXTURES AND INSTALL 21 NEW FIXTURES, REPLACE HWH AND BOLIER WITH DIRECT VENT CONDENSING GAS COMBINATION BOILERS AT EXISTING 2 FAMILY HOUSE.
Q00575604-P3
09/04/2024
Filed — Alteration
APPLICATION BEING FILED TO REMOVE 17 EXISTING FIXTURES AND INSTALL 21 NEW FIXTURES, REPLACE HWH AND BOLIER WITH DIRECT VENT CONDENSING GAS COMBINATION BOILERS AT EXISTING 2 FAMILY HOUSE.
Q00575604-P2
08/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBERT DYER
08/29/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
SEBERT DYER
08/29/2024
Special inspection requirement — HVAC-R and service water heating equipment
SEBERT DYER
08/29/2024
Special inspection requirement — Maintenance information
SEBERT DYER
08/29/2024
Special inspection requirement — Energy Code Compliance Inspections
SEBERT DYER
07/16/2024
Permit issued — Solar
Q01080155-I1-SL
07/12/2024
Filed — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS
Q01080155-I1
05/17/2024
Filed — Alteration
APPLICATION BEING FILED TO REMOVE 17 EXISTING FIXTURES AND INSTALL 21 NEW FIXTURES, REPLACE HWH AND BOLIER WITH DIRECT VENT CONDENSING GAS COMBINATION BOILERS AT EXISTING 2 FAMILY HOUSE.
Q00575604-P1
05/17/2024
Special inspection requirement — HVAC-R and service water heating equipment
SEBERT DYER
05/17/2024
Special inspection requirement — Maintenance information
SEBERT DYER
05/17/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
SEBERT DYER
05/17/2024
Special inspection requirement — Energy Code Compliance Inspections
SEBERT DYER
05/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBERT DYER
05/16/2024
Filed — Alteration
APPLICATION BEING FILED TO BUILD A 2 STORY REAR EXTENSION ON AN EXISTING 2 FAMILY HOUSE AND TO DO COMPLETE INTERIOR RENOVATION OF EXISTING BUILDING.
Q00575550-P1
05/16/2024
Special inspection requirement — Final
SEBERT DYER
05/16/2024
Special inspection requirement — Footing and Foundation
SEBERT DYER
05/16/2024
Special inspection requirement — Structural Wood Frame
SEBERT DYER
05/16/2024
Special inspection requirement — Air barrier - visual inspection
SEBERT DYER
05/16/2024
Special inspection requirement — Fenestration areas
SEBERT DYER
04/15/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/22/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/22/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/22/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/13/2024
Permit issued — Plumbing
Q75730394-I1-PL
03/16/2023
Violation issued (ECB, closed)
Construction
12/27/2022
Permit issued — Foundation
Q00575550-I1-GC-CX
12/21/2022
Permit issued — Construction Fence
Q00648938-I1-FN
12/01/2022
Violation issued (ECB, closed)
Construction
01/26/2022
Permit issued — Plumbing
Q00575604-I1-PL
01/17/2022
Violation issued (ECB, closed)
Construction
12/29/2021
Filed — Alteration
APPLICATION BEING FILED TO REMOVE 17 EXISTING FIXTURES AND INSTALL 21 NEW FIXTURES, REPLACE HWH AND BOLIER WITH DIRECT VENT CONDENSING GAS COMBINATION BOILERS AT EXISTING 2 FAMILY HOUSE.
Q00575604-I1
12/27/2021
Permit issued — General Construction
Q00575550-I1-GC-CX
12/21/2021
Permit issued — Construction Fence
Q00648938-I1-FN
12/16/2021
Filed — Alteration
Q00648938-I1
Latest 60 of 61 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offNYSS LLC07/16/2024
DOB NOWPlumbingSigned-offPLBG P & H INC03/13/2024
DOB NOWFoundationSigned-offYAFE MEOD CORP12/27/2022
DOB NOWConstruction FenceSigned-offYAFE MEOD CORP12/21/2022
DOB NOWPlumbingSigned-offBT'S PLUMBING AND HEATING01/26/2022
DOB NOWGeneral ConstructionSigned-offYAFE MEOD CORP12/27/2021
DOB NOWConstruction FenceSigned-offYAFE MEOD CORP12/21/2021
2 projects · most recent 06/24/2024
General Wiring
FiledStatusContractorScope
06/24/2024CompleteNY SOLAR ELECTRICAL LLC—
12/28/2021CompleteINFINITI ELECTRIC CORPGeneral Wiring
1 project · most recent 05/16/2024
Concrete Wood
FiledStatusContractorScope
05/16/2024Signed-offYAFE MEOD CORPConcrete, Wood
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
03/19/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/21/2025Pass-Final General Construction Non-Directive 14PassView ↗
02/08/2025Fail-Final General Construction Non-Directive 14FailView ↗
11/25/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/15/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/22/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/22/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/22/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 39
DateRequirementInspectorRole
01/29/2025Structural Stability – Alterations of existing buildingsROBERT MASONEspecial
01/29/2025Air barrier - visual inspectionROBERT MASONEenergy_progress
01/29/2025FinalROBERT MASONEprogress
01/29/2025Energy Code Compliance InspectionsROBERT MASONEprogress
01/29/2025Fire-Resistant Penetrations and JointsROBERT MASONEspecial
01/09/2025Air barrier - visual inspectionROBERT MASONEenergy_progress
01/09/2025Fire-Resistant Penetrations and JointsROBERT MASONEspecial
01/09/2025Structural Stability – Alterations of existing buildingsROBERT MASONEspecial
01/09/2025Energy Code Compliance InspectionsROBERT MASONEprogress
01/09/2025FinalROBERT MASONEprogress
09/27/2024Energy Code Compliance InspectionsSEBERT DYERprogress
09/27/2024HVAC-R and service water piping design and insulationSEBERT DYERenergy_progress
09/27/2024Maintenance informationSEBERT DYERenergy_progress
09/27/2024HVAC-R and service water heating equipmentSEBERT DYERenergy_progress
09/27/2024Fire-Resistant Penetrations and JointsSEBERT DYERspecial
08/29/2024Fire-Resistant Penetrations and JointsSEBERT DYERspecial
08/29/2024HVAC-R and service water piping design and insulationSEBERT DYERenergy_progress
08/29/2024HVAC-R and service water heating equipmentSEBERT DYERenergy_progress
08/29/2024Maintenance informationSEBERT DYERenergy_progress
08/29/2024Energy Code Compliance InspectionsSEBERT DYERprogress
05/17/2024HVAC-R and service water heating equipmentSEBERT DYERenergy_progress
05/17/2024Maintenance informationSEBERT DYERenergy_progress
05/17/2024HVAC-R and service water piping design and insulationSEBERT DYERenergy_progress
05/17/2024Energy Code Compliance InspectionsSEBERT DYERprogress
05/17/2024Fire-Resistant Penetrations and JointsSEBERT DYERspecial
Latest 25 of 39.
▾Documents — 74 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/26/2026Q00648938-I1Request digital key ↗
08/26/2026Q00575604-P3Request digital key ↗
08/26/2026Q00575604-P2Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records8
▸DOB NOWRestrictive Declaration/Easement 16
08/13/2026Q00575604-P2Open ↗
08/13/2026Q00575604-P1Open ↗
08/13/2026Q00575604-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q00575550-I1Open ↗
08/13/2026Q00575550-P1Open ↗
▸Seals & Professional Certifications44
▸DOB NOWProgress Inspector Seal & Signature27
09/28/2026Q01080155-I1Open ↗
09/28/2026Q01080155-I1Open ↗
08/30/2026Q01080155-P1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/26/2026Q00575604-P1Open ↗
08/26/2026Q00575604-P3Open ↗
08/26/2026Q00575604-P2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/28/2026Q01080155-I1Open ↗
08/30/2026Q01080155-P1Open ↗
08/28/2026Q00575604-I1Open ↗
Showing 3 of 8 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/26/2026Q00575604-P3Open ↗
08/26/2026Q00575604-P2Open ↗
08/26/2026Q00575604-P1Open ↗
Showing 3 of 8 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00575550-I1Open ↗
08/13/2026Q00575604-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01080155-I1Open ↗
▸Other Documents4
▸DOB NOWSite Survey: Initial2
08/13/2026Q00575550-I1Open ↗
08/13/2026Q00575550-P1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026Q00575550-I1Open ↗
08/13/2026Q00575550-P1Open ↗