← Back
One story - permanent living quarter
86-55 SANTIAGO STREET
QUEENS · BIN 4223790
💬 Discuss this project
1965Year Built
1Stories
A2Building Class
R1-2Zoning
2,893 sfGross Floor Area
1Units
1 Open Violation ▸FDNY Report ↗
One story - permanent living quarter · 10,854 sf lot · 0.27 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof4p · 2 filings · 20 docs
Floor 21p · 1 filing · 12 docs
Floor 12p · 2 filings · 20 docs
1 job · most recent 01/30/2026
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/30/2026Signed-offEMPIRE HOME SERVICES CORPVentilation Systems
Cooling
Mitsubishi Electric M4H36W06060615-B 40,000 BTU ×3
Heating
Mitsubishi Electric M4H36W06060615-B 40,000 BTU ×3
Ventilation
Mitsubishi Electric M4H36W06060615-B 40,000 BTU ×3
2 jobs · most recent 02/04/2026
General Wiring
FiledStatusContractorScope
02/04/2026Permit IssuedBRANDL ELECTRIC INC.General Wiring
12/04/2025CompleteBRANDL ELECTRIC INC.1 meters, 1 new_meters
1 job · most recent 01/30/2026
Wood
FiledStatusContractorScope
01/30/2026Signed-offFOUR POINTS P & H CORPWood
Building Lifecycle
All (76)Filed (6)Permit Issued (5)Signed Off (4)Violation (10)Inspection (4)Objection (18)Special Inspection (29)
08/19/2026
Signed off — Alteration
HERWITH FILE ALTERATION IN ORDER TO DO A PARTIAL INTERIOIR RENOVATION TO AN EXISTING TWO STORY ONE FAMILY DWELLING, TO INSTALL AN IN GROUND POOL IN THE REAR AND TO ADRESS VIOLATIONS NUMBER 39174298P, 39174299R, 39174300P, 39174304M AND TO OBTAIN A LOC.
Q01350248-S1
08/04/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/10/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/26/2026
Signed off — Alteration
HERWITH FILE ALTERATION IN ORDER TO DO A PARTIAL INTERIOIR RENOVATION TO AN EXISTING TWO STORY ONE FAMILY DWELLING, TO INSTALL AN IN GROUND POOL IN THE REAR AND TO ADRESS VIOLATIONS NUMBER 39174298P, 39174299R, 39174300P, 39174304M AND TO OBTAIN A LOC.
Q01350248-I1
04/28/2026
Violation issued (ECB, closed)
Construction
04/28/2026
Violation issued (ECB, closed)
Construction
04/23/2026
Permit issued — Plumbing
Q01350248-S1-PL
04/22/2026
Permit issued — General Construction
Q01350248-I1-GC-CX
04/13/2026
Signed off — Alteration
Q01328171-I1
03/18/2026
Objection resolved — Addressed
03/18/2026
Objection resolved — Addressed
03/18/2026
Objection resolved — Addressed
03/18/2026
Objection resolved — Addressed
03/18/2026
Objection resolved — Addressed
03/18/2026
Objection resolved — Addressed
03/18/2026
Objection resolved — Addressed
03/18/2026
Objection resolved — Addressed
03/18/2026
Objection resolved — Addressed
03/17/2026
Objection raised — Admin
03/17/2026
Objection raised — Zoning
03/17/2026
Objection raised — Zoning
03/17/2026
Objection raised — Energy
03/17/2026
Objection raised — Zoning
03/17/2026
Objection raised — Scope
03/17/2026
Objection raised — Structural
03/17/2026
Objection raised — Structural
03/17/2026
Objection raised — Inspections
03/10/2026
Filed — Alteration
Q01328171-P1
03/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
BORIS BALKHIYEV
03/04/2026
Special inspection requirement — Final
BORIS BALKHIYEV
03/04/2026
Special inspection requirement — Energy Code Compliance Inspections
BORIS BALKHIYEV
01/30/2026
Filed — Alteration
HERWITH FILE ALTERATION IN ORDER TO DO A PARTIAL INTERIOIR RENOVATION TO AN EXISTING TWO STORY ONE FAMILY DWELLING, TO INSTALL AN IN GROUND POOL IN THE REAR AND TO ADRESS VIOLATIONS NUMBER 39174298P, 39174299R, 39174300P, 39174304M AND TO OBTAIN A LOC.
Q01350248-S1
01/30/2026
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
01/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
01/30/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
01/22/2026
Filed — Alteration
HERWITH FILE ALTERATION IN ORDER TO DO A PARTIAL INTERIOIR RENOVATION TO AN EXISTING TWO STORY ONE FAMILY DWELLING, TO INSTALL AN IN GROUND POOL IN THE REAR AND TO ADRESS VIOLATIONS NUMBER 39174298P, 39174299R, 39174300P, 39174304M AND TO OBTAIN A LOC.
Q01350248-I1
01/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
01/22/2026
Special inspection requirement — Final
NAVEEN KUMAR
01/22/2026
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
01/22/2026
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
01/22/2026
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
01/22/2026
Special inspection requirement — Interior lighting power
Younes Abouyaala
01/22/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
01/22/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
01/22/2026
Special inspection requirement — Mechanical Systems
Younes Abouyaala
01/22/2026
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
01/21/2026
Permit issued — Solar
Q01328171-I1-SL
01/16/2026
Violation issued (ECB, closed)
Construction
01/16/2026
Violation issued (ECB, closed)
Construction
01/16/2026
Violation issued (ECB, closed)
Unknown
01/16/2026
Violation issued (ECB, closed)
Construction
01/16/2026
Violation issued (ECB, closed)
Construction
01/16/2026
Violation issued (ECB, open)
Unknown
01/16/2026
Violation issued (ECB, closed)
Construction
12/15/2025
Filed — Alteration
Q01328171-I1
03/01/2024
Signed off — Alteration
PROPOSED FIRE REPAIRS TO THE EXISTING ONE FAMILY DWELLING
Q00846743-I1
02/28/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/15/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
02/06/2024
Special inspection requirement — Structural Wood Frame
Nat Costanza
02/06/2024
Special inspection requirement — Final
Nat Costanza
Latest 60 of 76 events.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/10/2025$1.6M—— → —$553/sf building
04/19/2024$1.3M—Private party → Private party$444/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BORIS BALKHIYEV, PE203/10/2026
GERALD CALIENDO ARCHITECTS201/30/2026
CD ARCHITECT STUDIO, LLP201/30/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DMCONSULTING6860403/21/2026
Advanced Solar Solutions203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRINCHESE CONSTRUCTION INGeneral Contractor403/21/2026
BERGER CARLOSElectrical103/21/2026
BRANDL ELECTRIC INC.Electrical103/22/2026
ADVANCED SOLAR SOLUTIONSGeneral Contractor104/09/2026
EMPIRE HOME SERVICES CORPGeneral Contractor107/08/2026
FOUR POINTS P & H CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MB INSPECTIONS, CORP.8703203/10/2026
AA BUILDING & INSPECTION1519201/30/2026
CD ARCHITECT STUDIO, LLP2573201/30/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offFOUR POINTS P & H CORP04/23/2026
DOB NOWGeneral ConstructionSigned-offEMPIRE HOME SERVICES CORP04/22/2026
DOB NOWSolarSigned-offADVANCED SOLAR SOLUTIONS01/21/2026
DOB NOWGeneral ConstructionSigned-offTRINCHESE CONSTRUCTION IN07/28/2023
DOB NOWStructuralSigned-offTRINCHESE CONSTRUCTION IN04/27/2023
BISOTISSUEDVOLTAIC SOLAIRE LLC05/24/2017
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
08/04/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/10/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/28/2024Pass-Final General Construction Non-Directive 14PassView ↗
02/15/2024Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
03/04/2026Fire-Resistant Penetrations and JointsBORIS BALKHIYEVspecial
03/04/2026FinalBORIS BALKHIYEVprogress
03/04/2026Energy Code Compliance InspectionsBORIS BALKHIYEVprogress
01/30/2026Energy Code Compliance InspectionsYounes Abouyaalaprogress
01/30/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
01/30/2026HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
01/22/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
01/22/2026FinalNAVEEN KUMARprogress
01/22/2026Energy Code Compliance InspectionsYounes Abouyaalaprogress
01/22/2026HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
01/22/2026HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
01/22/2026Interior lighting powerYounes Abouyaalaenergy_progress
01/22/2026HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
01/22/2026Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
01/22/2026Mechanical SystemsYounes Abouyaalaspecial
01/22/2026Concrete - Cast-In-PlaceYounes Abouyaalaspecial
02/06/2024Structural Wood FrameNat Costanzaprogress
02/06/2024FinalNat Costanzaprogress
02/06/2024Fenestration and door U-factor and product ratingsNat Costanzaenergy_progress
02/06/2024Fire-Resistance Rated ConstructionNat Costanzaprogress
02/06/2024Lighting in dwelling unitsNat Costanzaenergy_progress
02/06/2024Insulation placement and R valuesNat Costanzaenergy_progress
02/06/2024Fenestration areasNat Costanzaenergy_progress
02/06/2024Fenestration air leakageNat Costanzaenergy_progress
02/06/2024Air barrier - visual inspectionNat Costanzaenergy_progress
Latest 25 of 29.
▾Documents — 53 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/24/2026Q00846743-I1Request digital key ↗
08/24/2026Q00846743-P1Request digital key ↗
08/17/2026Q01350248-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION5
04/04/2024440408051Open ↗
03/12/2024440408051Open ↗
03/07/2024440408051Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION1
05/23/2017440408051Open ↗
▸Seals & Professional Certifications22
▸DOB NOWProgress Inspector Seal & Signature8
09/06/2026Q01350248-I1Open ↗
09/06/2026Q01350248-I1Open ↗
09/06/2026Q01350248-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/24/2026Q00846743-P1Open ↗
08/24/2026Q00846743-I1Open ↗
08/17/2026Q01328171-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/06/2026Q01350248-I1Open ↗
09/02/2026Q00846743-I1Open ↗
09/02/2026Q00846743-I1Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
05/23/2017440408051Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
05/23/2017440408051Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/23/2017440408051Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
05/23/2017440408051Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/24/2026Q00846743-P1Open ↗
08/24/2026Q00846743-I1Open ↗
08/17/2026Q01328171-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
05/23/2017440408051Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
05/23/2017440408051Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
05/23/2017440408051Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
05/23/2017440408051Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
05/23/2017440408051Open ↗
▸Approvals, Objections & Sign-offs3
▸BISIntent to Rescind Letter1
08/14/2018440408051Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
08/14/2018440408051Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01328171-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
05/23/2017440408051Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
05/23/2017440408051Open ↗
▸Other Documents2
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q00846743-I1Open ↗
08/13/2026Q00846743-P1Open ↗