← Back
Two stories - detached, small or mid-size
193-24 FOOTHILL AVENUE
QUEENS · BIN 4223869
💬 Discuss this project
1925Year Built
2Stories
A1Building Class
R1-2Zoning
2,400 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 11,250 sf lot · 0.21 FAR built · Flood zone X
Locations of Work
Floor 21p · 1 filing · 9 docs
Floor 1
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AMINOV DESIGN ENGINEER, PC201/16/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A D BUILDING SOLUTIONS403/21/2026
Building Lifecycle
All (11)Filed (2)Objection (4)Special Inspection (5)
01/16/2026
Filed — Alteration CO
PLUMBING WORK TYPE IN CONJUNCTION WITH ALT-CO APPLICATION Q01258521-i1 AND WITH NB APPLICATION Q01265071-i1
Q01258521-S1
01/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
01/09/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
01/09/2026
Special inspection requirement — Energy Code Compliance Inspections
01/09/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
01/09/2026
Special inspection requirement — Maintenance information
11/18/2025
Objection resolved — Addressed
09/15/2025
Objection resolved — Addressed
09/05/2025
Objection raised — Energy
09/05/2025
Objection raised — Zoning
08/05/2025
Filed — Alteration CO
PLUMBING WORK TYPE IN CONJUNCTION WITH ALT-CO APPLICATION Q01258521-i1 AND WITH NB APPLICATION Q01265071-i1
Q01258521-I1
Nothing on file for this building.
1 project · most recent 01/16/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
01/16/2026——Gas, Storm, Water/Sanitary
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
01/09/2026Fire-Resistant Penetrations and Joints—special
01/09/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
01/09/2026Energy Code Compliance Inspections—progress
01/09/2026HVAC-R and service water piping design and insulation—energy_progress
01/09/2026Maintenance information—energy_progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/17/2026Q01258521-I1Request digital key ↗
08/17/2026Q01258521-S1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01258521-I1Open ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/17/2026Q01258521-I1Open ↗
08/17/2026Q01258521-S1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026Q01258521-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/17/2026Q01258521-I1Open ↗
08/17/2026Q01258521-S1Open ↗
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/17/2026Q01258521-I1Open ↗