← Back
Two stories - detached, small or mid-size
86-24 PALERMO STREET
QUEENS · BIN 4224003
💬 Discuss this project
1940Year Built
2.5Stories
A1Building Class
R1-2Zoning
1,644 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 7,493 sf lot · 0.22 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof1p · 1 filing · 20 docs
Cellar5p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PINTO ENGINEERING CONSULTANT, DPC902/01/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PINTO STUDIO803/21/2026
JESSIE BONAPARTE503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CARLOS HUMBERTO AVILA VILGeneral Contractor407/08/2026
ARANDA PLBG & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PINTO STUDIO INC6366802/01/2023
INTERNATIONAL GEOTEHCNICA1795412/15/2022
Building Lifecycle
All (68)Filed (9)Permit Issued (5)Signed Off (3)Violation (2)Inspection (3)Objection (16)Special Inspection (30)
02/17/2023
Signed off — Alteration
Plumbing work for a kitchen extension, half bathroom on the first floor, and renovation of the cellar space (boiler and laundry), filed in conjunction with JOB#Q00574428-I1
Q00574428-S1
02/01/2023
Filed — Alteration
Plumbing work for a kitchen extension, half bathroom on the first floor, and renovation of the cellar space (boiler and laundry), filed in conjunction with JOB#Q00574428-I1
Q00574428-A1
01/27/2023
Signed off — Alteration
Plumbing work for a kitchen extension, half bathroom on the first floor, and renovation of the cellar space (boiler and laundry), filed in conjunction with JOB#Q00574428-I1
Q00574428-I1
01/20/2023
Objection resolved — Addressed
01/11/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
RENE NAVARRETE
01/10/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/23/2022
Objection raised — Scope
12/15/2022
Filed — Alteration
Plumbing work for a kitchen extension, half bathroom on the first floor, and renovation of the cellar space (boiler and laundry), filed in conjunction with JOB#Q00574428-I1
Q00574428-P9
12/15/2022
Special inspection requirement — Concrete - Cast-In-Place
RENE NAVARRETE
12/15/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
RENE NAVARRETE
12/15/2022
Special inspection requirement — Masonry
RENE NAVARRETE
12/15/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
RENE NAVARRETE
12/15/2022
Special inspection requirement — Subgrade Inspections
MICHAEL KARANTINIDIS, P.E.
12/15/2022
Special inspection requirement — Energy Code Compliance Inspections
RENE NAVARRETE
12/15/2022
Special inspection requirement — Final
RENE NAVARRETE
12/15/2022
Special inspection requirement — Fire-Resistance Rated Construction
RENE NAVARRETE
12/15/2022
Special inspection requirement — Air barrier - visual inspection
RENE NAVARRETE
12/15/2022
Special inspection requirement — Insulation placement and R values
RENE NAVARRETE
12/15/2022
Special inspection requirement — Lighting controls
RENE NAVARRETE
12/15/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
RENE NAVARRETE
12/15/2022
Special inspection requirement — Fenestration air leakage
RENE NAVARRETE
12/15/2022
Special inspection requirement — Interior lighting power
RENE NAVARRETE
12/15/2022
Special inspection requirement — Lighting in dwelling units
RENE NAVARRETE
12/15/2022
Special inspection requirement — Fenestration areas
RENE NAVARRETE
12/15/2022
Special inspection requirement — Footing and Foundation
RENE NAVARRETE
11/04/2022
Signed off — Alteration
Plumbing work for a kitchen extension, half bathroom on the first floor, and renovation of the cellar space (boiler and laundry), filed in conjunction with JOB#Q00574428-I1
Q00574428-S2
09/23/2022
Objection raised — Inspections
09/23/2022
Objection resolved — Addressed
09/21/2022
Filed — Alteration
Plumbing work for a kitchen extension, half bathroom on the first floor, and renovation of the cellar space (boiler and laundry), filed in conjunction with JOB#Q00574428-I1
Q00574428-P5
09/20/2022
Filed — Alteration
Plumbing work for a kitchen extension, half bathroom on the first floor, and renovation of the cellar space (boiler and laundry), filed in conjunction with JOB#Q00574428-I1
Q00574428-P3
09/20/2022
Special inspection requirement — Lighting controls
RENE NAVARRETE
09/20/2022
Special inspection requirement — Concrete - Cast-In-Place
RENE NAVARRETE
09/20/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
RENE NAVARRETE
09/20/2022
Special inspection requirement — Masonry
RENE NAVARRETE
09/20/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
RENE NAVARRETE
09/20/2022
Special inspection requirement — Subgrade Inspections
MICHAEL KARANTINIDIS, P.E.
09/20/2022
Special inspection requirement — Energy Code Compliance Inspections
RENE NAVARRETE
09/20/2022
Special inspection requirement — Final
RENE NAVARRETE
09/20/2022
Special inspection requirement — Fire-Resistance Rated Construction
RENE NAVARRETE
09/20/2022
Special inspection requirement — Footing and Foundation
RENE NAVARRETE
09/20/2022
Special inspection requirement — Fenestration areas
RENE NAVARRETE
09/20/2022
Special inspection requirement — Lighting in dwelling units
RENE NAVARRETE
09/19/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/19/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/29/2022
Permit issued — General Construction
Q00574428-I1-GC-CX
08/25/2022
Objection resolved — Addressed
08/25/2022
Objection resolved — Addressed
08/24/2022
Objection resolved — Addressed
08/08/2022
Objection resolved — Addressed
08/05/2022
Objection raised — Structural
08/05/2022
Objection raised — Energy
08/05/2022
Objection raised — Inspections
08/05/2022
Objection resolved — Addressed
08/05/2022
Objection resolved — Addressed
08/04/2022
Objection raised — Scope
08/04/2022
Objection raised — Structural
08/04/2022
Objection raised — Other
07/28/2022
Filed — Alteration
Plumbing work for a kitchen extension, half bathroom on the first floor, and renovation of the cellar space (boiler and laundry), filed in conjunction with JOB#Q00574428-I1
Q00574428-P2
07/27/2022
Filed — Alteration
Plumbing work for a kitchen extension, half bathroom on the first floor, and renovation of the cellar space (boiler and laundry), filed in conjunction with JOB#Q00574428-I1
Q00574428-P1
07/12/2022
Permit issued — Plumbing
Q00574428-S1-PL
Latest 60 of 68 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offCARLOS HUMBERTO AVILA VIL08/29/2022
DOB NOWPlumbingSigned-offARANDA PLBG & HTG CORP07/12/2022
DOB NOWConstruction FenceSigned-offCARLOS HUMBERTO AVILA VIL06/15/2022
DOB NOWConstruction FenceSigned-offCARLOS HUMBERTO AVILA VIL04/27/2022
DOB NOWFoundationSigned-offCARLOS HUMBERTO AVILA VIL03/22/2022
1 project · most recent 12/01/2022
General Wiring
FiledStatusContractorScope
12/01/2022CompleteEOS ELECTRICAL CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
01/10/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/19/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/19/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
01/11/2023Fire-Resistant Penetrations and JointsRENE NAVARRETEspecial
12/15/2022Concrete - Cast-In-PlaceRENE NAVARRETEspecial
12/15/2022Fire-Resistant Penetrations and JointsRENE NAVARRETEspecial
12/15/2022MasonryRENE NAVARRETEspecial
12/15/2022Structural Stability – Alterations of existing buildingsRENE NAVARRETEspecial
12/15/2022Subgrade InspectionsMICHAEL KARANTINIDIS, P.E.special
12/15/2022Energy Code Compliance InspectionsRENE NAVARRETEprogress
12/15/2022FinalRENE NAVARRETEprogress
12/15/2022Fire-Resistance Rated ConstructionRENE NAVARRETEprogress
12/15/2022Air barrier - visual inspectionRENE NAVARRETEenergy_progress
12/15/2022Insulation placement and R valuesRENE NAVARRETEenergy_progress
12/15/2022Lighting controlsRENE NAVARRETEenergy_progress
12/15/2022Fenestration and door U-factor and product ratingsRENE NAVARRETEenergy_progress
12/15/2022Fenestration air leakageRENE NAVARRETEenergy_progress
12/15/2022Interior lighting powerRENE NAVARRETEenergy_progress
12/15/2022Lighting in dwelling unitsRENE NAVARRETEenergy_progress
12/15/2022Fenestration areasRENE NAVARRETEenergy_progress
12/15/2022Footing and FoundationRENE NAVARRETEprogress
09/20/2022Lighting controlsRENE NAVARRETEenergy_progress
09/20/2022Concrete - Cast-In-PlaceRENE NAVARRETEspecial
09/20/2022Fire-Resistant Penetrations and JointsRENE NAVARRETEspecial
09/20/2022MasonryRENE NAVARRETEspecial
09/20/2022Structural Stability – Alterations of existing buildingsRENE NAVARRETEspecial
09/20/2022Subgrade InspectionsMICHAEL KARANTINIDIS, P.E.special
09/20/2022Energy Code Compliance InspectionsRENE NAVARRETEprogress
Latest 25 of 37.
▾Documents — 60 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/26/2026Q00574428-I1Request digital key ↗
08/26/2026Q00574428-S1Request digital key ↗
08/26/2026Q00574428-S2Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026Q00574428-P9Open ↗
08/13/2026Q00574428-I1Open ↗
08/13/2026Q00574428-P2Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications26
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/26/2026Q00574428-P9Open ↗
08/26/2026Q00574428-A1Open ↗
08/26/2026Q00574428-S1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
08/31/2026Q00574428-A1Open ↗
08/30/2026Q00574428-P9Open ↗
08/30/2026Q00574428-P9Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
08/30/2026Q00574428-P9Open ↗
08/30/2026Q00574428-P9Open ↗
08/30/2026Q00574428-P9Open ↗
Showing 3 of 8 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/26/2026Q00574428-S1Open ↗
08/26/2026Q00574428-I1Open ↗
08/26/2026Q00574428-P3Open ↗
Showing 3 of 8 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00574428-I1Open ↗
▸Other Documents12
▸DOB NOWPlot Diagram4
08/13/2026Q00574428-P2Open ↗
08/13/2026Q00574428-P9Open ↗
08/13/2026Q00574428-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026Q00574428-P9Open ↗
08/13/2026Q00574428-P5Open ↗
08/13/2026Q00574428-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial3
08/13/2026Q00574428-P9Open ↗
08/13/2026Q00574428-I1Open ↗
08/13/2026Q00574428-P2Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00574428-I1Open ↗