← Back
Two stories - detached, small or mid-size
89-80 HOLLIS COURT BLVD
QUEENS · BIN 4225680
💬 Discuss this project
1925Year Built
2Stories
A1Building Class
R2Zoning
1,324 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 7,280 sf lot · 0.18 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Floor 217p · 2 filings · 20 docs
Floor 118p · 2 filings · 20 docs
Cellar16p · 2 filings · 20 docs
1 job · most recent 06/18/2026
Gas Water/Sanitary
FiledStatusContractorScope
06/18/2026Permit IssuedW.R. PLBG AND HTG CORPGas, Water/Sanitary
2 jobs · most recent 03/19/2025
General Wiring
FiledStatusContractorScope
03/19/2025CompleteHAZRAT RAMATALLIGeneral Wiring
03/06/2025CancelledTRINCITY ELECTRIC, INCGeneral Wiring
1 job · most recent 04/09/2021
Fence
FiledStatusContractorScope
04/09/2021Permit IssuedYAFE MEOD CORPFence
Building Lifecycle
All (49)Filed (7)Permit Issued (5)Inspection (7)Special Inspection (30)
06/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/18/2026
Filed — Alteration
New plumbing works for one family dwelling unit.
Q00497159-P3
06/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/05/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/01/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/28/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/21/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GLEN LANGER
11/15/2025
Special inspection requirement — Protection of exposed foundation insulation
GLEN LANGER
11/15/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
GLEN LANGER
11/15/2025
Special inspection requirement — Subgrade Inspections
GLEN LANGER
11/15/2025
Special inspection requirement — Maintenance information
GLEN LANGER
11/15/2025
Special inspection requirement — Fire-Resistance Rated Construction
GLEN LANGER
11/15/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
GLEN LANGER
11/15/2025
Special inspection requirement — Fenestration areas
GLEN LANGER
11/15/2025
Special inspection requirement — Concrete - Cast-In-Place
GLEN LANGER
11/15/2025
Special inspection requirement — Energy Code Compliance Inspections
GLEN LANGER
11/15/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
GLEN LANGER
11/15/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
GLEN LANGER
11/15/2025
Special inspection requirement — Fenestration air leakage
GLEN LANGER
11/15/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
GLEN LANGER
11/15/2025
Special inspection requirement — Air barrier — testing
GLEN LANGER
11/15/2025
Special inspection requirement — Electric vehicle service equipment requirements
GLEN LANGER
11/15/2025
Special inspection requirement — Interior lighting power
GLEN LANGER
11/15/2025
Special inspection requirement — Permanent certificate
GLEN LANGER
11/15/2025
Special inspection requirement — Insulation placement and R values
GLEN LANGER
11/15/2025
Special inspection requirement — Air barrier continuity plan testing
GLEN LANGER
11/15/2025
Special inspection requirement — Air barrier - visual inspection
GLEN LANGER
10/24/2025
Filed — Alteration CO
Q00791907-P2
10/24/2025
Filed — Alteration
New plumbing works for one family dwelling unit.
Q00497159-P2
10/06/2025
Special inspection requirement — Air barrier continuity plan testing
GLEN LANGER
10/06/2025
Special inspection requirement — Permanent certificate
GLEN LANGER
10/06/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
GLEN LANGER
10/06/2025
Special inspection requirement — Air barrier — testing
GLEN LANGER
10/06/2025
Special inspection requirement — Protection of exposed foundation insulation
GLEN LANGER
10/06/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
GLEN LANGER
10/06/2025
Special inspection requirement — Concrete - Cast-In-Place
GLEN LANGER
05/22/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/22/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/22/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/29/2025
Permit issued — Plumbing
Q00497159-I1-PL
03/26/2025
Permit issued — General Construction
Q00791907-I1-GC
03/18/2025
Permit issued — Construction Fence
Q00497157-I1-FN
04/01/2024
Permit issued — Construction Fence
Q00497157-I1-FN
03/28/2024
Permit issued — General Construction
Q00791907-I1-GC
03/15/2023
Filed — Alteration CO
Q00791907-P1
08/15/2022
Filed — Alteration CO
Q00791907-I1
04/12/2021
Filed — Alteration
New plumbing works for one family dwelling unit.
Q00497159-I1
04/09/2021
Filed — Alteration
ERECTION OF TEMPORARY CONSTRUCTION FENCE.
Q00497157-I1
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/10/2021$685K—Private party → Private party$517/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SOUTHERN CONSULTING ENGINEERING PC706/18/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JARED ASSOCIATE CONSULTING1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
YAFE MEOD CORPGeneral Contractor804/09/2026
W.R. PLBG AND HTG CORPPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
S&S CONCRETE & SOIL TESTI1008310/24/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedW.R. PLBG AND HTG CORP04/29/2025
DOB NOWGeneral ConstructionPermit IssuedYAFE MEOD CORP03/26/2025
DOB NOWConstruction FencePermit IssuedYAFE MEOD CORP03/18/2025
DOB NOWConstruction FencePermit IssuedYAFE MEOD CORP04/01/2024
DOB NOWGeneral ConstructionPermit IssuedYAFE MEOD CORP03/28/2024
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
06/05/2026Pass-Final CND-Occupancy InspectionPassView ↗
05/01/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/28/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/21/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/22/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/22/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/22/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 66
DateRequirementInspectorRole
06/22/2026Fire-Resistant Penetrations and Joints—special
06/18/2026Fire-Resistant Penetrations and Joints—special
11/15/2025Subgrade InspectionsGLEN LANGERspecial
11/15/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationGLEN LANGERspecial
11/15/2025Structural Stability – Alterations of existing buildingsGLEN LANGERspecial
11/15/2025Excavations - Sheeting, Shoring, and BracingGLEN LANGERspecial
11/15/2025Energy Code Compliance InspectionsGLEN LANGERprogress
11/15/2025Fire-Resistance Rated ConstructionGLEN LANGERprogress
11/15/2025Fenestration air leakageGLEN LANGERenergy_progress
11/15/2025Air barrier — testing GLEN LANGERenergy_progress
11/15/2025Electric vehicle service equipment requirementsGLEN LANGERenergy_progress
11/15/2025Concrete - Cast-In-PlaceGLEN LANGERspecial
11/15/2025HVAC-R and service water piping design and insulationGLEN LANGERenergy_progress
11/15/2025Interior lighting powerGLEN LANGERenergy_progress
11/15/2025Permanent certificateGLEN LANGERenergy_progress
11/15/2025Fenestration and door U-factor and product ratingsGLEN LANGERenergy_progress
11/15/2025Insulation placement and R valuesGLEN LANGERenergy_progress
11/15/2025Air barrier continuity plan testingGLEN LANGERenergy_progress
11/15/2025Fenestration areasGLEN LANGERenergy_progress
11/15/2025Protection of exposed foundation insulationGLEN LANGERenergy_progress
11/15/2025Air barrier - visual inspectionGLEN LANGERenergy_progress
11/15/2025Maintenance informationGLEN LANGERenergy_progress
11/15/2025Fire-Resistant Penetrations and JointsGLEN LANGERspecial
10/06/2025Fenestration areasGLEN LANGERenergy_progress
10/06/2025Concrete - Cast-In-PlaceGLEN LANGERspecial
Latest 25 of 66.
▾Documents — 52 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/27/2026Q00497157-I1Request digital key ↗
08/27/2026Q00497159-P3Request digital key ↗
08/27/2026Q00497159-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q00791907-I1Open ↗
08/13/2026Q00791907-P1Open ↗
08/13/2026Q00791907-P2Open ↗
▸Seals & Professional Certifications17
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/27/2026Q00497157-I1Open ↗
08/27/2026Q00497159-I1Open ↗
08/27/2026Q00497159-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/01/2026Q00791907-I1Open ↗
09/01/2026Q00791907-I1Open ↗
09/01/2026Q00791907-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026Q00791907-I1Open ↗
09/01/2026Q00791907-P2Open ↗
08/29/2026Q00791907-P1Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026Q00791907-P1Open ↗
08/13/2026Q00791907-P2Open ↗
08/13/2026Q00791907-I1Open ↗
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist3
08/13/2026Q00791907-P2Open ↗
08/13/2026Q00791907-P1Open ↗
08/13/2026Q00791907-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00791907-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/27/2026Q00497159-P3Open ↗
08/27/2026Q00497159-I1Open ↗
08/27/2026Q00497159-P2Open ↗
Showing 3 of 6 on file for this type
▸Other Documents12
▸DOB NOWPlot Diagram3
08/13/2026Q00791907-I1Open ↗
08/13/2026Q00791907-P1Open ↗
08/13/2026Q00791907-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q00791907-P1Open ↗
08/13/2026Q00791907-I1Open ↗
08/13/2026Q00791907-P2Open ↗
▸DOB NOWSite Survey: Initial3
08/13/2026Q00791907-I1Open ↗
08/13/2026Q00791907-P1Open ↗
08/13/2026Q00791907-P2Open ↗
▸DOB NOWProperty Ownership Certification3
08/18/2026Q00791907-P1Open ↗
08/18/2026Q00791907-P2Open ↗
08/18/2026Q00791907-I1Open ↗