← Back
Single or multiple dwelling with stores or offices
212-61 JAMAICA AVENUE
QUEENS · BIN 4226127
💬 Discuss this project
1931Year Built
2Stories
S9Building Class
R3-2Zoning
3,200 sfGross Floor Area
5Units
Rent Stabilized1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Single or multiple dwelling with stores or offices · Owner of record: 212-59 JAMAICA AVENUE CORP. · 1,924 sf lot · 1.66 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
212-59 JAMAICA AVENUE COR103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
INGA CONSULTING ENGINEERS308/13/2025
CL ENGINEERING P.C.601/26/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LAVB DESIGN CONSULTANTS903/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MIDTOWN PLBG & HTNG CORPPlumbing507/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.6781908/13/2025
Building Lifecycle
All (63)Filed (9)Permit Issued (5)Violation (15)Inspection (4)Special Inspection (30)
08/15/2025
Special inspection requirement — Tenant Protection Plan Compliance
08/15/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
08/15/2025
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
08/15/2025
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
08/15/2025
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
08/15/2025
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
08/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
08/13/2025
Filed — Alteration
REPLACEMENT OF EXISTING BOILER WITH A NEW ONE FOR RESIDENTIAL USE AS PER PLANS. NO CHANG IN USE EGRESS OR OCCUPANCY.
Q00845138-P4
05/20/2025
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
05/20/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
05/20/2025
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
05/20/2025
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
05/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
05/20/2025
Special inspection requirement — Tenant Protection Plan Compliance
05/20/2025
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
04/02/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/18/2025
Filed — Alteration
REPLACEMENT OF EXISTING BOILER WITH A NEW ONE FOR RESIDENTIAL USE AS PER PLANS. NO CHANG IN USE EGRESS OR OCCUPANCY.
Q00845138-P3
03/14/2025
Special inspection requirement — Tenant Protection Plan Compliance
03/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
03/14/2025
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
03/14/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
03/14/2025
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
03/14/2025
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
03/14/2025
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
12/27/2024
Permit issued — Plumbing
Q00845138-I1-PL
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/05/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/25/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/29/2024
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
01/29/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
01/29/2024
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
01/29/2024
Special inspection requirement — Heating Systems
CHRISTIAN LOZADA
01/29/2024
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
01/26/2024
Filed — Alteration
REPLACEMENT OF EXISTING BOILER WITH A NEW ONE FOR COMMERCIAL USE AS PER PLANS. RESIDENTIAL BOILERS TO BE FILED IN CONJUNCTION UNDER A SEPARATE SUBSEQUENT APPLICATIONS. NO CHANG IN USE EGRESS OR OCCUPANCY.
Q00845166-P1
01/26/2024
Filed — Alteration
REPLACEMENT OF EXISTING BOILER WITH A NEW ONE FOR RESIDENTIAL USE AS PER PLANS. NO CHANG IN USE EGRESS OR OCCUPANCY.
Q00845138-P1
01/26/2024
Filed — Alteration
REPLACEMENT OF EXISTING BOILER WITH A NEW ONE FOR RESIDENTIAL USE AS PER PLANS. NO CHANG IN USE EGRESS OR OCCUPANCY.
Q00845138-P2
01/26/2024
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
01/26/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
01/26/2024
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
01/26/2024
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
12/08/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
11/30/2023
Permit issued — Boiler Equipment
Q00845138-S2-BE
11/29/2023
Violation issued (HPD, closed)
I
11/15/2023
Permit issued — Boiler Equipment
Q00845166-I1-BE
11/14/2023
Filed — Alteration
REPLACEMENT OF EXISTING BOILER WITH A NEW ONE FOR RESIDENTIAL USE AS PER PLANS. NO CHANG IN USE EGRESS OR OCCUPANCY.
Q00845138-S2
11/14/2023
Permit issued — Plumbing
Q00845138-I1-PL
11/08/2023
Permit issued — Boiler Equipment
Q00845138-S1-BE
11/03/2023
Filed — Alteration
REPLACEMENT OF EXISTING BOILER WITH A NEW ONE FOR RESIDENTIAL USE AS PER PLANS. NO CHANG IN USE EGRESS OR OCCUPANCY.
Q00845138-S1
10/30/2023
Filed — Alteration
REPLACEMENT OF EXISTING BOILER WITH A NEW ONE FOR COMMERCIAL USE AS PER PLANS. RESIDENTIAL BOILERS TO BE FILED IN CONJUNCTION UNDER A SEPARATE SUBSEQUENT APPLICATIONS. NO CHANG IN USE EGRESS OR OCCUPANCY.
Q00845166-I1
10/27/2023
Filed — Alteration
REPLACEMENT OF EXISTING BOILER WITH A NEW ONE FOR RESIDENTIAL USE AS PER PLANS. NO CHANG IN USE EGRESS OR OCCUPANCY.
Q00845138-I1
04/22/2021
Violation issued (HPD, closed)
I
04/21/2021
Violation issued (ECB, open)
Construction
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/10/2018
Violation issued (HPD, closed)
I
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/22/2011
Violation issued (ECB, closed)
Signs
03/22/2011
Violation issued (ECB, closed)
Signs
03/22/2011
Violation issued (ECB, closed)
Signs
12/31/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/08/2007
Violation issued (ECB, closed)
Boilers
Latest 60 of 63 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offMIDTOWN PLBG & HTNG CORP12/27/2024
DOB NOWBoiler EquipmentSigned-offMIDTOWN PLBG & HTNG CORP11/30/2023
DOB NOWBoiler EquipmentSigned-offMIDTOWN PLBG & HTNG CORP11/15/2023
DOB NOWPlumbingSigned-offMIDTOWN PLBG & HTNG CORP11/14/2023
DOB NOWBoiler EquipmentSigned-offMIDTOWN PLBG & HTNG CORP11/08/2023
BISPLISSUEDQBK PLUMBING & HTNG INC07/23/2015
BISFPISSUEDMEGA FIRE PROTECTION INC05/09/2008
1 job · most recent 08/13/2025
Gas
FiledStatusContractorScope
08/13/2025Signed-offMIDTOWN PLBG & HTNG CORPGas
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
04/02/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/05/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/25/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/08/2023Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 53
DateRequirementInspectorRole
08/15/2025Tenant Protection Plan Compliance—special
08/15/2025HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
08/15/2025Maintenance informationCHRISTIAN LOZADAenergy_progress
08/15/2025HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
08/15/2025HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
08/15/2025Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
08/15/2025Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
05/20/2025HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
05/20/2025HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
05/20/2025Maintenance informationCHRISTIAN LOZADAenergy_progress
05/20/2025HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
05/20/2025Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
05/20/2025Tenant Protection Plan Compliance—special
05/20/2025Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
03/14/2025Tenant Protection Plan Compliance—special
03/14/2025Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
03/14/2025Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
03/14/2025HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
03/14/2025HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
03/14/2025Maintenance informationCHRISTIAN LOZADAenergy_progress
03/14/2025HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
01/29/2024Maintenance informationCHRISTIAN LOZADAenergy_progress
01/29/2024HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
01/29/2024HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
01/29/2024Heating SystemsCHRISTIAN LOZADAspecial
Latest 25 of 53.
▾Documents — 64 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/23/2026Q00845138-P3Request digital key ↗
08/23/2026Q00845138-P2Request digital key ↗
08/23/2026Q00845138-P1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits3
▸BISWORK PERMIT APPLICATION2
07/31/2015410105924Open ↗
05/09/2008410105924Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
04/28/2008410105924Open ↗
▸Seals & Professional Certifications33
▸DOB NOWProgress Inspector Seal & Signature14
09/23/2026Q00845138-S1Open ↗
09/23/2026Q00845138-S2Open ↗
09/01/2026Q00845138-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/23/2026Q00845138-P3Open ↗
08/23/2026Q00845138-P2Open ↗
08/23/2026Q00845138-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/23/2026Q00845138-S2Open ↗
09/23/2026Q00845138-S1Open ↗
09/01/2026Q00845138-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
04/28/2008410105924Open ↗
▸Trade Schedules & Equipment3
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
09/03/2015410105924Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
09/03/2015410105924Open ↗
▸BISSCHEDULE B - PLUMBING1
04/28/2008410105924Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/23/2026Q00845138-I1Open ↗
08/23/2026Q00845138-P3Open ↗
08/23/2026Q00845138-P2Open ↗
Showing 3 of 9 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
04/28/2008410105924Open ↗
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
08/26/2021410105924Open ↗
▸BISFIRE SUPPRESSION SYSTEM (FP) SIGNOFF1
08/26/2021410105924Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
04/28/2008410105924Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
08/19/2021410105924Open ↗
05/09/2008410105924Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
04/28/2008410105924Open ↗