| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 08/20/2026 | — | — | Air Conditioning Systems, Heating Systems, Ventilation Systems | Cooling Carrier 27VPA960A*030* 60,000 BTU · Condensing Unit ×1 Heating Carrier 59MN7C120C24--22 120,000 BTU · Furnace ×1 Ventilation Hampton Bay 7114-01 50 CFM · Exhaust Fan ×3 Delta Breeze SMT150 150 CFM · Exhaust Fan ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/20/2026 | — | — | Gas, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/20/2026 | — | — | Fence |
| Firm | Filings | Most Recent |
|---|---|---|
| NKM ENGINEERING PLLC | 1 | 08/20/2026 |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/28/2026 | Air barrier — testing | — | energy_progress |
| 06/30/2026 | Concrete - Cast-In-Place | — | special |
| 06/30/2026 | Excavations - Sheeting, Shoring, and Bracing | — | special |
| 06/30/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 06/30/2026 | Masonry | — | special |
| 06/30/2026 | Structural Steel - Details | — | special |
| 06/30/2026 | Structural Steel - High Strength Bolting | — | special |
| 06/30/2026 | Subgrade Inspections | — | special |
| 06/30/2026 | Subsurface Investigations (Borings/Test Pits) | — | special |
| 06/30/2026 | Final | — | progress |
| 06/30/2026 | Footing and Foundation | — | progress |
| 06/30/2026 | Energy Code Compliance Inspections | — | progress |
| 06/30/2026 | Structural Stability – Alterations of existing buildings | — | special |
| 06/30/2026 | Structural Wood Frame | — | progress |
| 06/30/2026 | Electric vehicle service equipment requirements | — | energy_progress |
| 06/30/2026 | Fenestration air leakage | — | energy_progress |
| 06/30/2026 | Maintenance information | — | energy_progress |
| 06/30/2026 | Metering | — | energy_progress |
| 06/30/2026 | Permanent certificate | — | energy_progress |
| 06/30/2026 | Interior lighting power | — | energy_progress |
| 06/30/2026 | Insulation placement and R values | — | energy_progress |
| 06/30/2026 | Fenestration and door U-factor and product ratings | — | energy_progress |
| 06/30/2026 | Air barrier - visual inspection | — | energy_progress |
| 06/30/2026 | Fenestration areas | — | energy_progress |
| 06/30/2026 | Fire-Resistance Rated Construction | — | progress |