ECB08/07/2026RESPONDENT HAS FAILED TO PROVIDE A PE REPORT AS REQUESTED BY THE DEPARTMENT IN DOBVIO 24-02209 FOR THE STRUCTURAL STABILITY OF THE BUILDING., COMPLY WITH COMMISSIONER'S ORDER; HIRE NYSPE TO SUBMIT REPORT TO EXE$2K due
ECB02/05/2026FAILURE TO OBEY A VACATE ORDER FROM THE COMMISSIONER. OBSERVED PREMISES IS ILLEGALLY OCCUPIED WITH THREE (3) MALE OCCUPANTS AND VEHICLES WHILE ON AN ACTIVE FULL VACATE ORDER VAC Q297/2024, WHICH WAS ISSUED ON 0$10K due
ECB02/05/2026FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH DEPARTMENT OF BUILDING FOR SUMMONS 39119369L., FILE A CERTIFICATE OF CORRECTION$1K due
ECB02/05/2026FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH DEPARTMENT OF BUILDING FOR SUMMONS 39124257N., FILE A CERTIFICATE OF CORRECTION$1K due
ECB02/05/2026FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH DEPARTMENT OF BUILDING FOR SUMMONS 39084128N., FILE A CERTIFICATE OF CORRECTION$1K due
ECB02/05/2026UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. PREMISES WERE ISSUED WITH A FULL STOP WORK ORDER ON 06/16/2022. OBSERVED 100% COMPLETED BUILDING WITH NEW FACADE, WINDOWS, PLUMBING WORKS, AND INT$10K due
ECB02/03/2026UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER FOR SUMMONS 39064274N., COMPLY WITH COMMISSIONER'S ORDER$2K due
ECB02/03/2026UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER FOR SUMMONS 39120854N. OBSERVED 100% COMPLETED OCCUPIED BUILDING WITH NO ENGINEERS REPORT NOR ALL NECESSARY PERMITS ON FILE. NON-COMPLIANT WITH FULL ST$6K due
ECB09/08/2024FAILURE TO COMPLY WITH A COMMISSIONERS ORDER: WORKERS WERE DOING ELECTRICAL AND PLUMBING WORK CONTRARY TO A STOP WORK ORDER AT TIME OF INSPECTION, COMPLY WITH STOP WORK ORDER; COMPLY WITH ORDER$12K due
ECB09/08/2024FAILURE TO COMPLY WITH A COMMISSIONERS ORDER: OCCUPYING A PREMISE CONTRARY TO A VACATE ORDER ISSUED ON 08/05/2024 #VACQ296/2024, COMPLY WITH COMMISSIONER'S ORDER; COMPLY WITH VACATE ORDER$2K due
DOB08/06/2024STRUCTURE STABILITY REPORT. ILLEGAL STEEL FRAME STRUCTURE CREATING 2ND STORY VERTICAL AND HORIZONTAL ENLARGEMENT WITH NO PERMITS ON TOP OF AN EXISTING 1-STORY COMMERCIAL BUILDING WITHOUT AN ENGINEER'S REPORT FOR STRUCTURAL STABILITY. PROPERTY HAS ACTIVE SWO AND HAS UNLAWFULLY CONTINUED WORK AND IS OCCUPIED.
ECB08/05/2024UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. NOTED; AN ILLEGAL STEEL FRAME STRUCTURE CREATING 2ND STORY VERTICAL AND HORIZONTAL ENLARGEMENT WITH NO PERMITS ON TOP OF AN EXISTING 1-STORY COMMERCIA$2K due
ECB07/17/2024UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER NOTED: VIOLATION #390642274 ISSUED ON 06/16/22 FOR FSWO AT TIME OF INSPECTION OBSERVED WORKERS INSTALLING SHEETROCK, CUTTING METAL FRAMES AND DOING$5K due
ECB05/25/2023AT TIME OF INSPECTION, OBSERVATION WAS MADE INSIDE OF COMMERCIAL GROUND FLOOR BUILDING SPACE, A AUTO BODY REPAIR SHOP WITH A NEW MECHANICAL CAR SPRAY BOOTH ATTACHED EXHAUST CONNECTIONS, AND MECHANICAL CONTROL D$1K due
ECB04/19/2023UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. PREMISES WAS ISSUED A FULL SWO ON 6/16/2022, AT TIME OF INSPECTION BUILDING NOW FULLY ENCLOSED WITH NEW FACADE AND COMMERCIAL WINDOWS. MORE THAN 5$5K due
ECB06/16/2022WORK WITHOUT PERMIT. NOTED; NEW STEEL FRAME ERECTED CREATING A NEW 2ND STORY EXTENSION WITH ROOF ONTO EXISTING 1 STORY COMMERCIAL PROPERTY. APPROX. 50% COMPLETED. STOP ALL WORK IMMEDIATELY., OBTAIN PERMIT; STOP$2K due
ECB05/31/2023INSTALLED BUSINESS ACCESSORY SIGN APPROXIMATELY 3-FOOT X 120 FOOT MADE OF METAL. ERECTED ON THE TOP OF ROLL DOWN SHUTTERS. THE SIGN READS" ROYAL AUTO MOTORS LLC". NO PERMIT FOR THIS SIGN AT THE TIME OF INSPECTINothing owed — awaiting certificate of correction