ECB08/07/2026RESPONDENT HAS FAILED TO PROVIDE A PE REPORT AS REQUESTED BY THE DEPARTMENT IN DOBVIO24-02208 FOR THE STRUCTURAL STABILITY OF THE BUILDING., COMPLY WITH COMMISSIONER'S ORDER; PROVIDE PE REPORT TO EXECUTIVE INSP$2K due
ECB02/05/2026FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH DEPARTMENT OF BUILDING FOR SUMMONS 39107656X., FILE A CERTIFICATE OF CORRECTION$1K due
ECB02/05/2026FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH DEPARTMENT OF BUILDING FOR SUMMONS 39106627M., FILE A CERTIFICATE OF CORRECTION$1K due
ECB02/05/2026UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. PREMISES WERE ISSUED WITH A FULL STOP WORK ORDER ON 06/16/2022. OBSERVED 100% COMPLETED BUILDING WITH NEW FACADE, WINDOWS, PLUMBING WORKS, AND INT$10K due
ECB02/05/2026FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH DEPARTMENT OF BUILDING FOR SUMMONS 39084132X., FILE A CERTIFICATE OF CORRECTION$1K due
ECB02/05/2026FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH DEPARTMENT OF BUILDING FOR SUMMONS 39104547N., FILE A CERTIFICATE OF CORRECTION$1K due
ECB02/05/2026FAILURE TO OBEY A VACATE ORDER FROM THE COMMISSIONER. OBSERVED PREMISES IS ILLEGALLY OCCUPIED WITH THREE (3) MALE OCCUPANTS AND VEHICLES WHILE ON AN ACTIVE FULL VACATE ORDER VAC Q297/2024, WHICH WAS ISSUED ON 0$10K due
ECB02/03/2026FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH DEPARTMENT OF BUILDING FOR SUMMONS 39106886R., FILE A CERTIFICATE OF CORRECTION$1K due
ECB02/03/2026UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER FOR SUMMONS 39120853L. OBSERVED 100% COMPLETED OCCUPIED BUILDING WITH NO ENGINEERS REPORT NOR ALL NECESSARY PERMITS ON FILE. NON-COMPLIANT WITH FULL ST$6K due
ECB02/03/2026FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH DEPARTMENT OF BUILDING FOR SUMMONS 39106604J., FILE A CERTIFICATE OF CORRECTION$1K due
ECB02/03/2026UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER FOR SUMMONS 39095431J., COMPLY WITH COMMISSIONER'S ORDER$2K due
ECB01/30/2025WORK WITHOUT A PERMIT, ILLEGAL CURB CUT CREATED. NOTED AT FRONT LEFT SIDE OF PREMISES. CREATED CURB CUT MEASURING APPROXIMATELY 9FT WIDE. NO PERMITS ON FILE OR IN DOB RECORDS FOR WORK COMPLETED., OBTAIN PERMIT$250 due
DOB08/06/2024STRUCTURE STABILITY REPORT. ILLEGAL STEEL FRAME STRUCTURE CREATING 2ND STORY VERTICAL AND HORIZONTAL ENLARGEMENT WITH NO PERMITS ON TOP OF AN EXISTING 1-STORY COMMERCIAL BUILDING WITHOUT AN ENGINEER'S REPORT FOR STRUCTURAL STABILITY. PROPERTY HAS ACTIVE SWO AND HAS UNLAWFULLY CONTINUED WORK AND IS OCCUPIED.
ECB08/05/2024UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. NOTED; AN ILLEGAL STEEL FRAME STRUCTURE CREATING 2ND STORY VERTICAL AND HORIZONTAL ENLARGEMENT WITH NO PERMITS ON TOP OF AN EXISTING 1-STORY COMMERCIA$2K due
ECB03/04/2024UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER,NOTED: ON 03/04/2024 I OBSERVED 3 WORKERS INSTALLING PIPE FOR AN AIR COOLING SYSTEM, 1ST STORY., COMPLY WITH STOP WORK ORDER$5K due
ECB02/26/2024TAMPERED WITH, REMOVED OR DEFACED A WRITTEN POSTED STOP WORK ORDER. NOTED; STOP WORK ORDER THAT WAS POSTED ON 2/22/2024 HAS BEEN REMOVED FROM FRONT., COMPLY WITH CODE$12K due
ECB02/22/2024UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF STOP WORK ORDER. NOTED; FULL STOP WORK ORDER WAS ISSUED ON 6/16/2022 FOR NEW STEEL FRAME VERTICAL EXTENSION CREATING 2ND STORY, ON 2/22/2024 OBSERVED 4 WORKERS ON SI$5K due
ECB02/22/2024TAMPERED WITH, REMOVED OR DEFACED A WRITTEN POSTED STOP WORK ORDER. NOTED; STOP WORK ORDER THAT WAS POSTED HAS BEEN REMOVED FROM FRONT., COMPLY WITH CODE$2K due
ECB01/29/2024UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF STOP WORK ORDER. NOTED; FULL STOP WORK ORDER WAS ISSUED ON 6/16/2022 FOR NEW STEEL FRAME VERTICAL EXTENSION CREATING 2ND STORY, ON 1/29/2024 OBSERVED 4 WORKERS ON SI$5K due
ECB09/20/2023WORK WITHOUT A PERMIT, OBSERVED AT REAR OF PREMISES. ERECTED HORIZONTAL EXTENSION MEASURING APPROXIMATELY 13'X15.' EXTENSION SPANS ENTIRE WIDTH OF BUILDING. WORK IS 100% DONE WITH CINDERBLOCK EXTERIOR, FLASHING$2K due
ECB04/19/2023UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. PREMISES WAS ISSUED A FULL SWO ON 6/16/2022, AT TIME OF INSPECTION BUILDING NOW FULLY ENCLOSED WITH NEW FACADE AND COMMERCIAL WINDOWS. MORE THAN 5$5K due