← Back
Miscellaneous religious facility
218-38 98 AVENUE
QUEENS · BIN 4230859
💬 Discuss this project
1952Year Built
2Stories
M9Building Class
M1-1Zoning
15,868 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Miscellaneous religious facility · Owner of record: BETHLEHEM MSSNRY/CH/INC · 33,505 sf lot · 0.47 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
Nothing on file for this building.
Building Lifecycle
All (57)Filed (6)Permit Issued (3)Signed Off (2)Violation (12)Inspection (4)Special Inspection (30)
12/19/2024
Signed off — Alteration
APPLICATION BEING FILED TO INSTALL NEW PACKAGE HVAC GAS FIRED SYSTEM TO REPLACE EXISTING HOT WATER SYSTEM. BOTH EXISTING BOILER AND AIR HANDLER WILL BE REPLACED. THE NEW SYSTEM WILL BE CONNECTED TO THE EXISTING DUCT WORK AND GAS LINE IN THE BUILDING.
Q08051472-I1
12/13/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/12/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/07/2024
Filed — Alteration
APPLICATION BEING FILED TO INSTALL NEW PACKAGE HVAC GAS FIRED SYSTEM TO REPLACE EXISTING HOT WATER SYSTEM. BOTH EXISTING BOILER AND AIR HANDLER WILL BE REPLACED. THE NEW SYSTEM WILL BE CONNECTED TO THE EXISTING DUCT WORK AND GAS LINE IN THE BUILDING.
Q08051472-P3
12/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBERT DYER
11/29/2024
Signed off — Alteration
APPLICATION BEING FILED TO INSTALL NEW PACKAGE HVAC GAS FIRED SYSTEM TO REPLACE EXISTING HOT WATER SYSTEM. BOTH EXISTING BOILER AND AIR HANDLER WILL BE REPLACED. THE NEW SYSTEM WILL BE CONNECTED TO THE EXISTING DUCT WORK AND GAS LINE IN THE BUILDING.
Q08051467-I1
11/07/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/30/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/21/2024
Permit issued — Plumbing
Q08051472-I1-PL
12/18/2023
Filed — Alteration
APPLICATION BEING FILED TO INSTALL NEW PACKAGE HVAC GAS FIRED SYSTEM TO REPLACE EXISTING HOT WATER SYSTEM. BOTH EXISTING BOILER AND AIR HANDLER WILL BE REPLACED. THE NEW SYSTEM WILL BE CONNECTED TO THE EXISTING DUCT WORK AND GAS LINE IN THE BUILDING.
Q08051472-P2
12/15/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBERT DYER
09/13/2023
Permit issued — Plumbing
Q08051472-I1-PL
06/29/2023
Special inspection requirement — Duct leakage testing, insulation and design
SEBERT DYER
06/29/2023
Special inspection requirement — Structural Steel - Details
Warren Gordon
06/29/2023
Special inspection requirement — Structural Cold-Formed Steel
Warren Gordon
06/29/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBERT DYER
06/29/2023
Special inspection requirement — Mechanical Systems
SEBERT DYER
06/29/2023
Special inspection requirement — Footing and Foundation
SEBERT DYER
06/29/2023
Special inspection requirement — Energy Code Compliance Inspections
SEBERT DYER
06/29/2023
Special inspection requirement — Final
SEBERT DYER
06/29/2023
Special inspection requirement — Fire-Resistance Rated Construction
SEBERT DYER
06/29/2023
Special inspection requirement — Ventilation and air distribution system
SEBERT DYER
06/29/2023
Special inspection requirement — Shutoff dampers
SEBERT DYER
06/29/2023
Special inspection requirement — Maintenance information
SEBERT DYER
06/27/2023
Filed — Alteration
APPLICATION BEING FILED TO INSTALL NEW PACKAGE HVAC GAS FIRED SYSTEM TO REPLACE EXISTING HOT WATER SYSTEM. BOTH EXISTING BOILER AND AIR HANDLER WILL BE REPLACED. THE NEW SYSTEM WILL BE CONNECTED TO THE EXISTING DUCT WORK AND GAS LINE IN THE BUILDING.
Q08051467-P1
06/27/2023
Filed — Alteration
APPLICATION BEING FILED TO INSTALL NEW PACKAGE HVAC GAS FIRED SYSTEM TO REPLACE EXISTING HOT WATER SYSTEM. BOTH EXISTING BOILER AND AIR HANDLER WILL BE REPLACED. THE NEW SYSTEM WILL BE CONNECTED TO THE EXISTING DUCT WORK AND GAS LINE IN THE BUILDING.
Q08051472-P1
06/24/2023
Special inspection requirement — Shutoff dampers
SEBERT DYER
06/24/2023
Special inspection requirement — Duct leakage testing, insulation and design
SEBERT DYER
06/24/2023
Special inspection requirement — Ventilation and air distribution system
SEBERT DYER
06/24/2023
Special inspection requirement — Maintenance information
SEBERT DYER
06/24/2023
Special inspection requirement — Ventilation and air distribution system
SEBERT DYER
06/24/2023
Special inspection requirement — Duct leakage testing, insulation and design
SEBERT DYER
06/24/2023
Special inspection requirement — Shutoff dampers
SEBERT DYER
06/24/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBERT DYER
06/24/2023
Special inspection requirement — Mechanical Systems
SEBERT DYER
06/24/2023
Special inspection requirement — Structural Cold-Formed Steel
Warren Gordon
06/24/2023
Special inspection requirement — Structural Steel - Details
Warren Gordon
06/24/2023
Special inspection requirement — Energy Code Compliance Inspections
SEBERT DYER
06/24/2023
Special inspection requirement — Final
SEBERT DYER
06/24/2023
Special inspection requirement — Fire-Resistance Rated Construction
SEBERT DYER
06/24/2023
Special inspection requirement — Footing and Foundation
SEBERT DYER
06/24/2023
Special inspection requirement — Maintenance information
SEBERT DYER
12/15/2022
Permit issued — General Construction
Q08051467-I1-GC-CX
12/13/2022
Filed — Alteration
APPLICATION BEING FILED TO INSTALL NEW PACKAGE HVAC GAS FIRED SYSTEM TO REPLACE EXISTING HOT WATER SYSTEM. BOTH EXISTING BOILER AND AIR HANDLER WILL BE REPLACED. THE NEW SYSTEM WILL BE CONNECTED TO THE EXISTING DUCT WORK AND GAS LINE IN THE BUILDING.
Q08051472-I1
12/13/2022
Filed — Alteration
APPLICATION BEING FILED TO INSTALL NEW PACKAGE HVAC GAS FIRED SYSTEM TO REPLACE EXISTING HOT WATER SYSTEM. BOTH EXISTING BOILER AND AIR HANDLER WILL BE REPLACED. THE NEW SYSTEM WILL BE CONNECTED TO THE EXISTING DUCT WORK AND GAS LINE IN THE BUILDING.
Q08051467-I1
09/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/01/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/12/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/12/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/08/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/16/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/15/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/01/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/05/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/30/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/22/2002
Violation issued (ECB, closed)
Public Assembly
12/04/1989
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BETHLEHEM MISSIONARY CHURCH1707/08/2026
BETHLEM MISSIONARTY CHURCH103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BUILDING ENGINEERING SYSTEMS PLLC612/07/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DONOVAN PETGRAVEGeneral Contractor303/21/2026
SAMUEL & SONS P & H INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALL STATE PROPERTY INSPEC4288612/07/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offSAMUEL & SONS P & H INC10/21/2024
DOB NOWPlumbingSigned-offSAMUEL & SONS P & H INC09/13/2023
DOB NOWGeneral ConstructionSigned-offDONOVAN PETGRAVE12/15/2022
BIS—ISSUEDHANCOCK INDUSTRIES LTD10/03/2006
BISOTISSUEDBETHLEHAM NISSIONARY CHURCH09/29/2005
BIS—ISSUEDHANCOCK INDUSTRIES LTD08/30/2005
BISEQISSUEDHANCOCK INDUSTRIES LTD08/30/2005
BISEQISSUEDHANCOCK INDURSTRIES LTD01/12/2005
BISEQISSUEDHANCOCK INDURSTRIES LTD08/25/2004
BISEQISSUEDHANCOCK INDURSTRIES LTD03/18/2003
BIS—ISSUEDHANCOCK INDURSTRIES LTD09/11/2002
BISEQISSUEDHANCOCK INDURSTRIES LTD09/11/2002
BIS—ISSUEDHANCOCK INDURSTRIES LTD03/12/2002
BISEQISSUEDHANCOCK INDURSTRIES LTD03/07/2002
BISPLISSUEDTHOMAS HANCOK, LICENSE PLUMBER11/28/2001
BISEQISSUEDHANCOCK INDURSTRIES LTD06/20/2001
BISPLISSUEDTHOMAS HANCOK, LICENSE PLUMBER10/31/2000
BISEQISSUEDHANCOCK INDURSTRIES LTD08/17/2000
BIS—ISSUEDHANCOCK INDURSTRIES LTD08/17/2000
BISEQISSUEDHANCOCK INDUSTRIES01/27/2000
BIS—ISSUEDHANCOCK INDUSTRIES01/27/2000
BISPLISSUEDSPI PLG INDUSTRIES12/30/1999
BIS—ISSUEDHANCOCK INDURSTRIES LTD11/30/1999
BISEQISSUEDHANCOCK INDURSTRIES LTD11/30/1999
BISCCISSUEDBETHLEHEM MISSIONARY CHURCH INC06/17/1999
BISPLISSUEDAAA SIX-G PLMG & HTG CONTR CORP11/27/1991
BIS—ISSUEDARWINTON CONST. CORP.11/27/1991
BIS—ISSUEDACE HIGH CRANE INC01/04/1990
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
12/13/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/12/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/07/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/30/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
12/06/2024Fire-Resistant Penetrations and JointsSEBERT DYERspecial
12/15/2023Fire-Resistant Penetrations and JointsSEBERT DYERspecial
06/29/2023Duct leakage testing, insulation and designSEBERT DYERenergy_progress
06/29/2023Structural Steel - DetailsWarren Gordonspecial
06/29/2023Structural Cold-Formed SteelWarren Gordonspecial
06/29/2023Fire-Resistant Penetrations and JointsSEBERT DYERspecial
06/29/2023Mechanical SystemsSEBERT DYERspecial
06/29/2023Footing and FoundationSEBERT DYERprogress
06/29/2023Energy Code Compliance InspectionsSEBERT DYERprogress
06/29/2023FinalSEBERT DYERprogress
06/29/2023Fire-Resistance Rated ConstructionSEBERT DYERprogress
06/29/2023Ventilation and air distribution systemSEBERT DYERenergy_progress
06/29/2023Shutoff dampersSEBERT DYERenergy_progress
06/29/2023Maintenance informationSEBERT DYERenergy_progress
06/24/2023Shutoff dampersSEBERT DYERenergy_progress
06/24/2023Duct leakage testing, insulation and designSEBERT DYERenergy_progress
06/24/2023Ventilation and air distribution systemSEBERT DYERenergy_progress
06/24/2023Maintenance informationSEBERT DYERenergy_progress
06/24/2023Ventilation and air distribution systemSEBERT DYERenergy_progress
06/24/2023Duct leakage testing, insulation and designSEBERT DYERenergy_progress
06/24/2023Shutoff dampersSEBERT DYERenergy_progress
06/24/2023Fire-Resistant Penetrations and JointsSEBERT DYERspecial
06/24/2023Mechanical SystemsSEBERT DYERspecial
06/24/2023Structural Cold-Formed SteelWarren Gordonspecial
06/24/2023Structural Steel - DetailsWarren Gordonspecial
Latest 25 of 30.
▾Documents — 90 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/24/2026Q08051467-I1Request digital key ↗
08/24/2026Q08051467-P1Request digital key ↗
08/21/2026Q08051472-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits11
▸BISPLACE OF ASSEMBLY7
03/27/2017401270502Open ↗
10/03/2016421079683Open ↗
10/03/2016421079683Open ↗
Showing 3 of 7 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION2
03/27/2017401270502Open ↗
10/07/2013420902027Open ↗
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
01/25/2016421079683Open ↗
▸BISWORK PERMIT APPLICATION1
10/08/2013420902027Open ↗
▸Seals & Professional Certifications44
▸DOB NOWProgress Inspector Seal & Signature16
09/02/2026Q08051467-P1Open ↗
09/02/2026Q08051467-P1Open ↗
09/02/2026Q08051467-P1Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
10/03/2016421079683Open ↗
10/03/2016421079683Open ↗
10/03/2016421079674Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/02/2026Q08051467-P1Open ↗
09/02/2026Q08051467-P1Open ↗
09/02/2026Q08051467-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/21/2026Q08051472-I1Open ↗
08/21/2026Q08051472-P3Open ↗
08/21/2026Q08051472-P1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/07/2013420902027Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
10/07/2013420902027Open ↗
▸Trade Schedules & Equipment1
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
10/03/2016421079683Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/21/2026Q08051472-I1Open ↗
08/21/2026Q08051472-P3Open ↗
08/21/2026Q08051472-P1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
02/24/2015421079674Open ↗
02/23/2015421079683Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/07/2013420902027Open ↗
▸Approvals, Objections & Sign-offs14
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter6
08/13/2026Q08051472-P2Open ↗
08/13/2026Q08051472-P3Open ↗
08/13/2026Q08051472-P1Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
10/03/2016421079674Open ↗
10/03/2016421079674Open ↗
10/03/2016421079683Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
02/24/2015421079674Open ↗
10/07/2013420902027Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
05/11/2016420902027Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
05/11/2016420902027Open ↗
10/07/2013420902027Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION2
03/27/2017401270502Open ↗
03/27/2017401270502Open ↗
▸BISEFILING COVER SHEET1
10/07/2013420902027Open ↗