Church, synagogue, chapel
206-14 100 AVENUE
QUEENS · BIN 4232560
💬 Discuss this project
1931Year Built
1Stories
M1Building Class
R3-2Zoning
—Gross Floor Area
0Units
4 Open Violations ▸FDNY Report ↗
Church, synagogue, chapel · Owner of record: THE NEW COVENANT CHURCH OF CHRIST BAPTIS T · 0.27 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalGeneral
Roof1p · 3 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW CONVENANT CHURCH OF CHRIST1307/08/2026
THE NEW COVENANT CHURCH OF CHRIST BAPTIS T103/22/2026
NEW COVENANT CHURCH103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW YORK ENGINEERING ASSOC., P.C.107/08/2022
TEP ENGINEERING, PLLC107/01/2021
TECTONIC ENGINEERING104/16/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING ASSOCIATES P C203/21/2026
CONSTRUCTION PERMIT SERVICES103/21/2026
CCM CONSULTING GROUP, INC.103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KMM TELECOMMUNICATIONSGeneral Contractor603/21/2026
LEVEST ELECTRIC CORPGeneral Contractor107/08/2026
ODYSSIA GLOBAL COMM. CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERING ASSO851107/08/2022
Building Lifecycle
All (29)Filed (3)Permit Issued (5)Signed Off (1)Violation (4)Inspection (1)Objection (10)Special Inspection (5)
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/01/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
07/12/2022
Permit issued — Boiler Equipment
Q00749513-I1-BE
07/08/2022
Filed — Alteration
REPLACE BOILER AND OIL BURNER.
Q00749513-I1
06/10/2022
Special inspection requirement — Heating Systems
LOUIS ARENA
06/10/2022
Special inspection requirement — Maintenance information
LOUIS ARENA
06/10/2022
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
06/10/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
06/10/2022
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
01/11/2022
Permit issued — Antenna
Q00251902-I1-AN
07/13/2021
Permit issued — Antenna
Q00516413-I1-AN
07/01/2021
Filed — Alteration
Modification to AT&T site. Replace (6) antennas along with (3)RRH units, install (3) RRH units and Retrofit (1)cabinet and Relocate(3) antennas. All in-conformance with TPPN5/98, NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00516413-I1
07/01/2021
Objection raised — 2014-AN FC 504.4 TPPN 5/98-Fi
07/01/2021
Objection resolved — Addressed
07/01/2021
Objection raised — 2014-AN AC 28-104.7.1-Administ
07/01/2021
Objection resolved — Addressed
02/24/2020
Permit issued — Antenna
Q00251902-I1-AN
11/06/2019
Signed off — Alteration
AT&T WIRELESS. Replacement of existing telecommunications antennas with installation/replacement of RRH units on roof. Removal and installation of cabinets in existing interior equipment room. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.
Q00021155-I1
06/15/2018
Permit issued — Antenna
Q00021155-I1-AN
04/16/2018
Filed — Alteration
AT&T WIRELESS. Replacement of existing telecommunications antennas with installation/replacement of RRH units on roof. Removal and installation of cabinets in existing interior equipment room. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.
Q00021155-I1
04/16/2018
Objection raised — 2014-AN AC 28-104.7.1-Administ
04/16/2018
Objection resolved — Addressed
04/16/2018
Objection raised — 1998-AN BC 501.3-Building Code
04/16/2018
Objection resolved — Addressed
04/16/2018
Objection raised — 1998-AN AC 28-103.14.1-Adminis
04/16/2018
Objection resolved — Addressed
12/01/2016
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/31/2005
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offMVC HEATING CORP07/12/2022
DOB NOWAntennaPermit IssuedKMM TELECOMMUNICATIONS01/11/2022
DOB NOWAntennaPermit IssuedODYSSIA GLOBAL COMM. CORP07/13/2021
DOB NOWAntennaPermit IssuedKMM TELECOMMUNICATIONS02/24/2020
DOB NOWAntennaSigned-offLEVEST ELECTRIC CORP06/15/2018
BISOTISSUEDCOSTROTTA CONSTRUCTION MA05/26/2016
BISOTISSUEDBECHTEL INFRASTRUCTURE AN04/27/2015
BISOTISSUEDBECHTEL INFRASTRUCTURE AN07/28/2014
BISOTISSUEDPREFERRED BUILDERS INC09/03/2010
BISOTISSUEDALLIED CONTRACTING II CORP12/26/2006
BISOTISSUEDODYSSIA GLOBAL COMM. CORP02/04/2005
BISOTISSUEDODYSSIA GLOBAL COMM. CORP02/02/2005
BISOTISSUEDODYSSIA GLOBAL COMM. CORP10/04/2004
BISOTISSUEDODYSSIA GLOBAL COMM. CORP10/04/2004
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
09/01/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
06/10/2022Heating SystemsLOUIS ARENAspecial
06/10/2022Maintenance informationLOUIS ARENAenergy_progress
06/10/2022HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
06/10/2022HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
06/10/2022HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
▾Documents — 53 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/27/2026Q00516413-I1Request digital key ↗
08/26/2026Q00749513-I1Request digital key ↗
08/14/2026Q00021155-I1Request digital key ↗
▸Applications & Permits9
▸BISPLAN / WORK APPROVAL APPLICATION5
03/09/2016421298465Open ↗
09/21/2015420956932Open ↗
09/02/2014420956932Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION4
05/27/2016421298465Open ↗
05/06/2015420956932Open ↗
08/04/2014420956932Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications12
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
01/11/2018421298465Open ↗
01/10/2018421298465Open ↗
05/27/2016421298465Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/27/2026Q00516413-I1Open ↗
08/13/2026Q00749513-I1Open ↗
08/13/2026Q00021155-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/23/2026Q00749513-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/23/2026Q00749513-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/27/2026Q00516413-I1Open ↗
08/13/2026Q00749513-I1Open ↗
08/13/2026Q00021155-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
03/09/2016421298465Open ↗
04/30/2014420956932Open ↗
▸BISTHIS IS NOT AN ASBESTOS PROJECT1
06/22/2010420203719Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
01/16/2018421298465Open ↗
05/27/2016421298465Open ↗
04/30/2014420956932Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
01/16/2018421298465Open ↗
12/30/2015420956932Open ↗
▸Approvals, Objections & Sign-offs11
▸BISLETTERS - SUPPORTING DOCUMENTATION4
12/30/2015420956932Open ↗
10/01/2015420956932Open ↗
08/25/2015420956932Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
03/09/2016421298465Open ↗
04/30/2014420956932Open ↗
06/22/2010420203719Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
01/16/2018421298465Open ↗
12/30/2015420956932Open ↗
▸BISSUPERSEDING LETTER1
05/06/2015420956932Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/13/2026Q00749513-I1Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
03/09/2016421298465Open ↗
04/30/2014420956932Open ↗
06/22/2010420203719Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION2
09/21/2015420956932Open ↗
09/02/2014420956932Open ↗
▸BISEFILING COVER SHEET2
03/09/2016421298465Open ↗
04/30/2014420956932Open ↗