← Back
Two stories - detached, small or mid-size
99-33 211 STREET
QUEENS · BIN 4232752
💬 Discuss this project
1915Year Built
2.5Stories
A1Building Class
R2Zoning
1,881 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,800 sf lot · 0.39 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ETRECTE LLC104/11/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GREEN POWER SOLUTIONS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SOLENERGY NY LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ETRECTE LLC8116104/11/2025
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
08/19/2025
Signed off — Alteration
Installation of Solar Photovoltaic system.
Q01198731-I1
04/16/2025
Permit issued — Solar
Q01198731-I1-SL
04/11/2025
Filed — Alteration
Installation of Solar Photovoltaic system.
Q01198731-I1
03/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
VYACHESLAV NECHAYEV
03/20/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
VYACHESLAV NECHAYEV
03/20/2025
Special inspection requirement — Energy Code Compliance Inspections
VYACHESLAV NECHAYEV
03/20/2025
Special inspection requirement — Final
VYACHESLAV NECHAYEV
03/20/2025
Special inspection requirement — Air barrier - visual inspection
VYACHESLAV NECHAYEV
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSOLENERGY NY LLC04/16/2025
1 project · most recent 05/12/2025
FiledStatusContractorScope
05/12/2025CompleteBERNARDI ELECTRIC INC.—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
03/20/2025Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
03/20/2025Structural Stability – Alterations of existing buildingsVYACHESLAV NECHAYEVspecial
03/20/2025Energy Code Compliance InspectionsVYACHESLAV NECHAYEVprogress
03/20/2025FinalVYACHESLAV NECHAYEVprogress
03/20/2025Air barrier - visual inspectionVYACHESLAV NECHAYEVenergy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/20/2026Q01198731-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWProgress Inspector Seal & Signature2
08/28/2026Q01198731-I1Open ↗
08/28/2026Q01198731-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026Q01198731-I1Open ↗
08/28/2026Q01198731-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/20/2026Q01198731-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/20/2026Q01198731-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01198731-I1Open ↗