← Back
Single or multiple dwelling with stores or offices
114-53 FARMERS BOULEVARD
QUEENS · BIN 4236286
💬 Discuss this project
1920Year Built
2Stories
S9Building Class
R5BZoning
2,360 sfGross Floor Area
4Units
Rent Stabilized2 Open Violations ▸FDNY Report ↗
Single or multiple dwelling with stores or offices · Owner of record: CREATIVE SOLUTIONS CAPITAL LLC · 1,580 sf lot · 1.49 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 8 docs
Floor 1Under Construction2p · 2 filings · 20 docs
CellarUnder Construction1p · 1 filing · 20 docs
1 job · most recent 07/02/2026
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/02/2026Permit IssuedURBAN CONSTR & DESIGN LLCVentilation Systems
Ventilation
Captiveaire # DU85HFA 115v 22,000 CFM ×1
1 job · most recent 06/17/2026
Gas Water/Sanitary
FiledStatusContractorScope
06/17/2026Permit IssuedNEW YORK PARK PLBG&HTG COGas, Water/Sanitary
1 job · most recent 12/14/2021
FiledStatusContractorScope
12/14/2021CompleteBLZ ELECTRIC INC.6 meters, 6 new_meters
Building Lifecycle
All (89)Filed (8)Permit Issued (3)Violation (46)Inspection (10)Objection (12)Special Inspection (10)
08/26/2026
Objection resolved — Resolved
08/26/2026
Objection resolved — Resolved
08/18/2026
Objection raised — Structural
08/18/2026
Objection raised — Scope
07/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
He Gin Lee
07/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
He Gin Lee
07/09/2026
Special inspection requirement — Fire-Resistance Rated Construction
He Gin Lee
07/02/2026
Filed — Alteration
PROPOSED EATING & DRINKING ESTABLISHMENT-FIRST FLOOR"MECHANICAL WORK ONLY" 1. INSTALL EXHAUST SYSTEM & REPLACE DUCTWORKS THRU ROOF - KITCHEN AREA . NO CHANGE IN USE, EGRESS & OCCUPANCY.
Q01198343-P1
06/17/2026
Filed — Alteration
PLUMBING WORK ONLY, INSTALL (1) NEW SINK, (1) NEW GAS RANGE, (1) NEW GAS GRILL,(1) NEW STEAM TABLE, AND (1) GAS FRYER
Q01121798-P4
06/17/2026
Filed — Alteration
PLUMBING WORK ONLY, INSTALL (1) NEW SINK, (1) NEW GAS RANGE, (1) NEW GAS GRILL,(1) NEW STEAM TABLE, AND (1) GAS FRYER
Q01121798-P3
04/23/2026
Permit issued — Mechanical Systems
Q01198343-I1-MS
04/23/2026
Special inspection requirement — Final
joseph oreste
04/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
He Gin Lee
04/23/2026
Special inspection requirement — Mechanical Systems
joseph oreste
04/23/2026
Special inspection requirement — Tenant Protection Plan Compliance
03/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
He Gin Lee
03/23/2026
Special inspection requirement — Fire-Resistance Rated Construction
He Gin Lee
03/03/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/02/2026
Filed — Alteration
PLUMBING WORK ONLY, INSTALL (1) NEW SINK, (1) NEW GAS RANGE, (1) NEW GAS GRILL,(1) NEW STEAM TABLE, AND (1) GAS FRYER
Q01121798-P1
02/02/2026
Filed — Alteration
PLUMBING WORK ONLY, INSTALL (1) NEW SINK, (1) NEW GAS RANGE, (1) NEW GAS GRILL,(1) NEW STEAM TABLE, AND (1) GAS FRYER
Q01121798-P2
01/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
He Gin Lee
01/22/2026
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
01/20/2026
Permit issued — General Construction
Q01121798-I1-GC
01/15/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/15/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
01/15/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
01/15/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/15/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/12/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/12/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/12/2026
Objection resolved — Addressed
12/17/2025
Permit issued — Plumbing
Q01121798-S1-PL
12/14/2025
Objection resolved — Addressed
12/11/2025
Objection resolved — Addressed
12/10/2025
Objection raised — Fire_Protection
12/03/2025
Objection resolved — Addressed
11/25/2025
Violation issued (HPD, closed)
I
09/02/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/17/2025
Objection raised — Cost
06/17/2025
Objection raised — Structural
06/17/2025
Objection raised — Scope
05/29/2025
Filed — Alteration
PROPOSED EATING & DRINKING ESTABLISHMENT-FIRST FLOOR"MECHANICAL WORK ONLY" 1. INSTALL EXHAUST SYSTEM & REPLACE DUCTWORKS THRU ROOF - KITCHEN AREA . NO CHANGE IN USE, EGRESS & OCCUPANCY.
Q01198343-I1
12/04/2024
Violation issued (HPD, closed)
I
11/12/2024
Filed — Alteration
PLUMBING WORK ONLY, INSTALL (1) NEW SINK, (1) NEW GAS RANGE, (1) NEW GAS GRILL,(1) NEW STEAM TABLE, AND (1) GAS FRYER
Q01121798-I1
11/12/2024
Filed — Alteration
PLUMBING WORK ONLY, INSTALL (1) NEW SINK, (1) NEW GAS RANGE, (1) NEW GAS GRILL,(1) NEW STEAM TABLE, AND (1) GAS FRYER
Q01121798-S1
11/29/2023
Violation issued (HPD, closed)
I
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/19/2020
Violation issued (ECB, closed)
Construction
08/11/2020
Violation issued (ECB, closed)
Construction
08/11/2020
Violation issued (ECB, closed)
Construction
01/10/2020
Violation issued (ECB, closed)
Construction
12/26/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/26/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/11/2019
Violation issued (ECB, closed)
Construction
06/11/2019
Violation issued (ECB, closed)
Construction
04/08/2019
Violation issued (HPD, closed)
C
03/29/2019
Violation issued (HPD, closed)
I
03/29/2019
Violation issued (HPD, closed)
I
Latest 60 of 89 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CREATIVE SOLUTIONS CAPITAL LLC803/22/2026
OWNER OF PREMISES 114-53103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
URBAN ARCHITECTURAL DESIGN, PC807/02/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KJDS HOME IMPROVEMENT LLCGeneral Contractor104/09/2026
URBAN CONSTR & DESIGN LLCGeneral Contractor107/04/2026
NEW YORK PARK PLBG&HTG COPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HG LEE ARCHITECT PC2554707/02/2026
JCO CONSULTING INC.8447207/02/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedURBAN CONSTR & DESIGN LLC04/23/2026
DOB NOWGeneral ConstructionSigned-offKJDS HOME IMPROVEMENT LLC01/20/2026
DOB NOWPlumbingPermit IssuedNEW YORK PARK PLBG&HTG CO12/17/2025
BISOTISSUEDKINGSBRIDGE CONSTRUCTION08/12/2020
BISFPISSUEDFIRE FOE CORP05/30/1990
BISPLISSUEDBO-RICH MECH. PLBG. & HTNG. CORP03/16/1990
BISOTISSUEDACE FOOD SERVICE EQUIPMENT INC.03/14/1990
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
03/03/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/22/2026No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
01/15/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/15/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
01/15/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/15/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/15/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/12/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/12/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/02/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
07/09/2026Fire-Resistant Penetrations and JointsHe Gin Leespecial
07/09/2026Fire-Resistant Penetrations and JointsHe Gin Leespecial
07/09/2026Fire-Resistance Rated ConstructionHe Gin Leeprogress
04/23/2026Finaljoseph oresteprogress
04/23/2026Fire-Resistant Penetrations and JointsHe Gin Leespecial
04/23/2026Mechanical Systemsjoseph orestespecial
04/23/2026Tenant Protection Plan Compliance—special
03/23/2026Fire-Resistant Penetrations and JointsHe Gin Leespecial
03/23/2026Fire-Resistance Rated ConstructionHe Gin Leeprogress
01/23/2026Fire-Resistant Penetrations and JointsHe Gin Leespecial
▾Documents — 49 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/20/2026Q01198343-P1Request digital key ↗
08/20/2026Q01198343-I1Request digital key ↗
08/17/2026Q01121798-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION3
10/23/2019421913380Open ↗
10/09/2019421913380Open ↗
09/17/2019421913380Open ↗
▸BISWORK PERMIT APPLICATION1
08/12/2020421913380Open ↗
▸Seals & Professional Certifications21
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/20/2026Q01198343-I1Open ↗
08/20/2026Q01198343-P1Open ↗
08/17/2026Q01121798-S1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/28/2026Q01198343-P1Open ↗
09/28/2026Q01198343-P1Open ↗
08/27/2026Q01121798-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/28/2026Q01198343-P1Open ↗
08/27/2026Q01121798-I1Open ↗
08/25/2026Q01121798-P3Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
09/17/2019421913380Open ↗
▸Trade Schedules & Equipment1
▸BISPLUMBING FILING1
02/24/2021421913380Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
12/11/2019421913380Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
12/11/2019421913380Open ↗
09/17/2019421913380Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
02/22/2021421913380Open ↗
07/21/2020421913380Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
02/18/2021421913380Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
09/17/2019421913380Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
02/18/2021421913380Open ↗
07/21/2020421913380Open ↗
07/21/2020421913380Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
02/24/2021421913380Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
02/18/2021421913380Open ↗
10/10/2019421913380Open ↗
09/17/2019421913380Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
09/17/2019421913380Open ↗