← Back
One story - permanent living quarter
115-55 208 STREET
QUEENS · BIN 4238008
💬 Discuss this project
1940Year Built
1Stories
A2Building Class
R3AZoning
900 sfGross Floor Area
1Units
1 Open Violation ▸
One story - permanent living quarter · 4,000 sf lot · 0.23 FAR built · Flood zone X
Locations of Work
Architecture
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 14 docs
CellarUnder Construction1p · 1 filing · 14 docs
Nothing on file for this building.
Building Lifecycle
All (35)Filed (3)Permit Issued (1)Violation (1)Special Inspection (30)
09/22/2026
Permit issued — Construction Fence
Q01432388-S1-FN
08/21/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
FILED HEREWITH PLUMBING WORK TYPE IN CONJUNCTION WITH ALT-CO-NB APPLICATION #Q01432388-I1.
Q01432388-S1
08/20/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
FILED HEREWITH PLUMBING WORK TYPE IN CONJUNCTION WITH ALT-CO-NB APPLICATION #Q01432388-I1.
Q01432388-S2
08/18/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
FILED HEREWITH PLUMBING WORK TYPE IN CONJUNCTION WITH ALT-CO-NB APPLICATION #Q01432388-I1.
Q01432388-I1
08/17/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
08/17/2026
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
08/17/2026
Special inspection requirement — Energy Code Compliance Inspections
08/17/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
08/17/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
08/17/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
08/17/2026
Special inspection requirement — HVAC-R and service water heating equipment
08/17/2026
Special inspection requirement — Fenestration areas
08/17/2026
Special inspection requirement — Maintenance information
08/17/2026
Special inspection requirement — Insulation placement and R values
08/17/2026
Special inspection requirement — HVAC-R and service water heating system controls
08/17/2026
Special inspection requirement — Permanent certificate
08/17/2026
Special inspection requirement — HVAC-R and service water heating equipment
08/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/17/2026
Special inspection requirement — Air barrier — testing
08/17/2026
Special inspection requirement — Ventilation and air distribution system
08/17/2026
Special inspection requirement — HVAC-R and service water heating system controls
08/17/2026
Special inspection requirement — Fenestration air leakage
08/17/2026
Special inspection requirement — Air barrier - visual inspection
07/16/2026
Special inspection requirement — Electric vehicle service equipment requirements
07/16/2026
Special inspection requirement — Metering
07/16/2026
Special inspection requirement — Maintenance information
07/16/2026
Special inspection requirement — Duct leakage testing, insulation and design
07/16/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
07/16/2026
Special inspection requirement — Mechanical Systems
07/16/2026
Special inspection requirement — Concrete - Cast-In-Place
07/16/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
07/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/16/2026
Special inspection requirement — Heating Systems
07/16/2026
Special inspection requirement — Masonry
08/24/2002
Violation issued (HPD, open)
B
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PETER CHO ARCHITECTS, PLLC108/21/2026
NKM ENGINEERING PLLC208/20/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FTIC HOME IMPROVEMENT INCGeneral Contractor109/23/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedFTIC HOME IMPROVEMENT INC09/22/2026
▾Special Inspection Requirements (DOB NOW) — 41
DateRequirementInspectorRole
08/17/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
08/17/2026Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities—special
08/17/2026Energy Code Compliance Inspections—progress
08/17/2026HVAC-R and service water piping design and insulation—energy_progress
08/17/2026Fenestration and door U-factor and product ratings—energy_progress
08/17/2026HVAC-R and service water piping design and insulation—energy_progress
08/17/2026HVAC-R and service water heating equipment—energy_progress
08/17/2026Fenestration areas—energy_progress
08/17/2026Maintenance information—energy_progress
08/17/2026Insulation placement and R values—energy_progress
08/17/2026HVAC-R and service water heating system controls—energy_progress
08/17/2026Permanent certificate—energy_progress
08/17/2026HVAC-R and service water heating equipment—energy_progress
08/17/2026Fire-Resistant Penetrations and Joints—special
08/17/2026Air barrier — testing —energy_progress
08/17/2026Ventilation and air distribution system—energy_progress
08/17/2026HVAC-R and service water heating system controls—energy_progress
08/17/2026Fenestration air leakage—energy_progress
08/17/2026Air barrier - visual inspection—energy_progress
07/16/2026Electric vehicle service equipment requirements—energy_progress
07/16/2026Metering—energy_progress
07/16/2026Maintenance information—energy_progress
07/16/2026Duct leakage testing, insulation and design—energy_progress
07/16/2026Structural Stability – Alterations of existing buildings—special
07/16/2026Mechanical Systems—special
Latest 25 of 41.
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/19/2026Q01432388-I1Request digital key ↗
08/19/2026Q01432388-S1Request digital key ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/19/2026Q01432388-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/19/2026Q01432388-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/19/2026Q01432388-I1Open ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/25/2026Q01432388-S2Open ↗
09/25/2026Q01432388-S1Open ↗
08/19/2026Q01432388-I1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/19/2026Q01432388-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/25/2026Q01432388-S2Open ↗
08/19/2026Q01432388-I1Open ↗
08/19/2026Q01432388-S2Open ↗
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
08/19/2026Q01432388-I1Open ↗
▸Other Documents3
▸DOB NOWProperty Ownership Certification1
08/19/2026Q01432388-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/19/2026Q01432388-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/19/2026Q01432388-I1Open ↗