ECB07/14/2025OBSERVED ACTIVE CONSTRUCTION OPERATIONS WITH CONSTRUCTION MATERIALS STORED ON SWS DECK AS WELL AS MAKE-SHIFT PIPE SCAFFOLD @ EXPO 4 ON TOP DECK OF SWS. UPON ARRIVAL TO JOBSITE, WORKERS BECAME HOSTILE AND ARGUME$2K due
ECB07/14/20253307.1 SCOPE. OBSERVED SWS INSTALLED @ EXPO 1&4 WITH MATERIALS AND EQUIPMENT STORED ON TOP DECK. UPON REVIEW OF DEPARTMENT OF TRANSPORTATION PERMIT WEB BASED SYSTEM, NO PERMIT FOR THE PLACEMENT/INSTALLATION OF$2K due
DOB05/02/2025FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER.HAZARDOUS DETERIORAT CONDITION OF PARAPET WALL @ EXP#1, SOUTH & EXP#2 EAST ELEV @ BOTH EXP OBSERVED MORTAR JOINT MISSING LEANING PARAPET WALLS CRACKING COPING STONES STEP CRACK IN BRICK WORK AND CRACKS IN STONE. REMEDY: REPAIR AND/OR REPLACE
DOB11/07/2024FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. HAZARDOUS DETERIORATING CONDITION OF OF VIEW EXPOSURES 1,2 & EXPOSURE 4. DAMAGED COPING STONE, CRACKS/STEP CRACKS DAMAGED AND OPEN JOINTS. SPALLING & THE TRANSOM PORTION OF GATE LOOSE. REMEDY: MAINTAIN BUILDING REPAIR AND/OR REPLACE
DOB06/26/2024OBSERVED DAMAGED MORTAR JOINTS ON EXPOSURE 1 & 4 IN MULTIPLE LOCATIONS ALSO OBSERVED LEANING PARAPET AND MULTIPLE STEP CRACKSON EXPOSURE 4 REMEDY: REPAIR AND/OR REPLACE
DOB02/07/2000V-DOB VIOLATION - ACTIVE
DOB02/10/1997V-DOB VIOLATION - ACTIVE
DOB04/13/1996VP-VIOLATION UNSERVED ECB-ACTIVE
DOB08/29/1995V-DOB VIOLATION - ACTIVE
DOB06/07/1994V-DOB VIOLATION - ACTIVE
DOB06/28/1993V-DOB VIOLATION - ACTIVE
ECB03/07/2023FAILURE TO MAINTAIN BUILDING WALL(S)OR APPURTENANCES.NOTE:AT TIME OF INSPECTION OF A 2 STORY BUILDING.I OBSERVED AT EXP#1 HAD MISSING MORTARSPALLING AND VERTICAL CRACK,IT WAS ALSO NOTED AT EXP#4 THERE WAS MISSINothing owed — awaiting certificate of correction
ECB08/10/2020EXPOSURE FOUR OF BUILDING HAS MULTIPLE STEPS CRACKS, MISSING MORTAR JOINTS, AND A MISSING WINDOW, THE DEPARTMENT HAS PREVIOUSLY SITED THE OWNER FOR THIS CONDITION, ALSO A FAILURE TO CERTIFY CORRECTION WAS ISSUENothing owed — awaiting certificate of correction
ECB04/30/2018FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT EXPOSURE #4, SIDE ELEVATION OF BUILDING ALONG 198TH STREET 1 BRICK DISLODGING FROM LINTEL BEAM OVER STORE METAL AWNING. BRICK WALL HAS STEP CRACKNothing owed — awaiting certificate of correction
Predominantly retail with other uses · 2,025 sf lot · 1.52 FAR built · Flood zone X