← Back
Two stories - detached, small or mid-size
218-26 103 AVENUE
QUEENS · BIN 4239352
💬 Discuss this project
1955Year Built
2Stories
A1Building Class
R3-2Zoning
1,830 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · Owner of record: HASINA INC. · 5,000 sf lot · 0.37 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
Nothing on file for this building.
Building Lifecycle
All (12)Filed (1)Permit Issued (1)Objection (8)Special Inspection (2)
04/08/2026
Permit issued — General Construction
Q01222524-I1-GC
01/21/2026
Objection resolved — Addressed
01/21/2026
Objection resolved — Addressed
11/20/2025
Objection resolved — Addressed
11/20/2025
Objection resolved — Addressed
09/05/2025
Objection raised — Zoning
09/05/2025
Objection raised — Zoning
09/05/2025
Objection raised — Zoning
09/05/2025
Objection raised — Scope
06/04/2025
Filed — Alteration
Existing Porch at the first floor and Terrace at the second to Be Legalized
Q01222524-I1
06/04/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jitendra Hirani
05/07/2025
Special inspection requirement — Final
Jitendra Hirani
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HASINA204/10/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/08/2024$800K—Private party → HASINA INC.$437/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HIRANI ENGINEERING AND LAND SURVEYI106/04/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WESTCHESTER RENO GRP LLCGeneral Contractor104/10/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HIRANI ENGINEERING & LAND679106/04/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedWESTCHESTER RENO GRP LLC04/08/2026
BISOTISSUEDSNEE CONSTRUCTION INC01/17/2006
BISOTISSUEDN.A11/20/2002
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
06/04/2025Structural Stability – Alterations of existing buildingsJitendra Hiranispecial
05/07/2025FinalJitendra Hiraniprogress
▾Documents — 5 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/20/2026Q01222524-I1Contact architect ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026Q01222524-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/28/2026Q01222524-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/28/2026Q01222524-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q01222524-I1Open ↗