← Back
Two stories - detached, small or mid-size
109-40 213 STREET
QUEENS · BIN 4239530
💬 Discuss this project
1935Year Built
2Stories
A1Building Class
R2Zoning
1,230 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 4,000 sf lot · 0.31 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TRINITY SOLAR LLC202/28/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ACA ASSOCIATES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
REDLINE ELECTRIC INCElectrical103/22/2026
TRINITY SOLAR LLCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IKRA CONSULTING LLC7032202/28/2026
Building Lifecycle
All (9)Filed (2)Permit Issued (1)Signed Off (1)Violation (1)Special Inspection (4)
03/06/2026
Signed off — Alteration
Q01254382-I1
03/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MD MOSTAFA
03/02/2026
Special inspection requirement — Final
Ayracon Almaraz
03/02/2026
Special inspection requirement — Energy Code Compliance Inspections
Ayracon Almaraz
03/02/2026
Special inspection requirement — Air barrier - visual inspection
Ayracon Almaraz
02/28/2026
Filed — Alteration
Q01254382-P1
07/16/2025
Permit issued — Solar
Q01254382-I1-SL
07/11/2025
Filed — Alteration
Q01254382-I1
03/28/2025
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offTRINITY SOLAR LLC07/16/2025
2 projects · most recent 01/05/2026
General Wiring
FiledStatusContractorScope
01/05/2026Permit IssuedSWITCH ELECT OF THE FIVEGeneral Wiring
07/08/2025CompleteREDLINE ELECTRIC INC—
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
03/02/2026Fire-Resistant Penetrations and JointsMD MOSTAFAspecial
03/02/2026FinalAyracon Almarazprogress
03/02/2026Energy Code Compliance InspectionsAyracon Almarazprogress
03/02/2026Air barrier - visual inspectionAyracon Almarazenergy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/17/2026Q01254382-P1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026Q01254382-I1Open ↗
09/01/2026Q01254382-I1Open ↗
09/01/2026Q01254382-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/17/2026Q01254382-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026Q01254382-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026Q01254382-P1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01254382-I1Open ↗