← Back
Two stories - detached, small or mid-size
209-31 111 ROAD
QUEENS · BIN 4239763
💬 Discuss this project
1925Year Built
2.5Stories
A1Building Class
R3-2Zoning
1,368 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 3,000 sf lot · 0.46 FAR built · Flood zone X
Locations of Work
Architecture
Cellar1p · 1 filing · 15 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SUNG HO SHIN ARCHITECT, PC307/01/2025
Building Lifecycle
All (51)Filed (3)Objection (20)Special Inspection (28)
01/28/2026
Objection resolved — Addressed
01/06/2026
Objection resolved — Addressed
01/02/2026
Objection raised — Zoning
12/15/2025
Objection resolved — Addressed
09/11/2025
Objection resolved — Addressed
09/05/2025
Objection resolved — Addressed
08/29/2025
Objection raised — Cost
08/28/2025
Objection resolved — Addressed
08/13/2025
Objection resolved — Addressed
08/05/2025
Objection resolved — Addressed
08/05/2025
Objection resolved — Addressed
08/05/2025
Special inspection requirement — Structural Wood Frame
08/05/2025
Special inspection requirement — Fire-Resistance Rated Construction
08/05/2025
Special inspection requirement — Energy Code Compliance Inspections
07/16/2025
Objection raised — Plumbing
07/16/2025
Objection raised — Plumbing
07/16/2025
Objection raised — Fire_Protection
07/16/2025
Objection raised — Scope
07/16/2025
Objection raised — Admin
07/16/2025
Objection raised — Zoning
07/16/2025
Objection raised — Inspections
07/16/2025
Objection raised — Inspections
07/16/2025
Objection resolved — Addressed
07/01/2025
Filed — Alteration
PLYWOOD CONSTRUCTION FENCE ON PROPERTY LINE
Q01237672-S1
07/01/2025
Filed — Alteration
PLYWOOD CONSTRUCTION FENCE ON PROPERTY LINE
Q01237672-I1
07/01/2025
Filed — Alteration
PLYWOOD CONSTRUCTION FENCE ON PROPERTY LINE
Q01237672-S2
06/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/06/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
06/06/2025
Special inspection requirement — Subgrade Inspections
06/06/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
06/06/2025
Special inspection requirement — Chimneys and vents
06/06/2025
Special inspection requirement — Final
06/06/2025
Special inspection requirement — Footing and Foundation
06/06/2025
Special inspection requirement — Air barrier - visual inspection
06/06/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
06/06/2025
Special inspection requirement — Fenestration areas
06/06/2025
Special inspection requirement — Lighting controls
06/06/2025
Special inspection requirement — Fenestration air leakage
06/06/2025
Special inspection requirement — HVAC-R and service water heating equipment
06/06/2025
Special inspection requirement — Insulation placement and R values
06/06/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
06/06/2025
Special inspection requirement — Maintenance information
06/06/2025
Special inspection requirement — HVAC-R and service water heating system controls
06/06/2025
Special inspection requirement — Protection of exposed foundation insulation
06/06/2025
Special inspection requirement — Interior lighting power
06/06/2025
Special inspection requirement — Permanent certificate
06/06/2025
Special inspection requirement — Ventilation and air distribution system
06/06/2025
Special inspection requirement — Mechanical Systems
06/06/2025
Special inspection requirement — Concrete - Cast-In-Place
06/06/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Nothing on file for this building.
1 project · most recent 07/01/2025
Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/01/2025——Heating Systems, Ventilation Systems
Heating
Kenmore N96MSN0801716A 60,000 BTU ×1
Ventilation
Panasonic FV-0510VSL1 100 kW · Exhaust Fan ×4
1 project · most recent 07/01/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/01/2025——Gas, Storm, Water/Sanitary
1 project · most recent 07/01/2025
Concrete Wood
FiledStatusContractorScope
07/01/2025——Concrete, Wood
1 project · most recent 07/01/2025
Fence
FiledStatusContractorScope
07/01/2025——Fence
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
08/05/2025Structural Wood Frame—progress
08/05/2025Fire-Resistance Rated Construction—progress
08/05/2025Energy Code Compliance Inspections—progress
06/10/2025Fire-Resistant Penetrations and Joints—special
06/06/2025Fire-Resistant Penetrations and Joints—special
06/06/2025Structural Stability – Alterations of existing buildings—special
06/06/2025Subgrade Inspections—special
06/06/2025Subsurface Investigations (Borings/Test Pits)—special
06/06/2025Chimneys and vents—special
06/06/2025Final—progress
06/06/2025Footing and Foundation—progress
06/06/2025Air barrier - visual inspection—energy_progress
06/06/2025HVAC-R and service water piping design and insulation—energy_progress
06/06/2025Fenestration areas—energy_progress
06/06/2025Lighting controls—energy_progress
06/06/2025Fenestration air leakage—energy_progress
06/06/2025HVAC-R and service water heating equipment—energy_progress
06/06/2025Insulation placement and R values—energy_progress
06/06/2025Fenestration and door U-factor and product ratings—energy_progress
06/06/2025Maintenance information—energy_progress
06/06/2025HVAC-R and service water heating system controls—energy_progress
06/06/2025Protection of exposed foundation insulation—energy_progress
06/06/2025Interior lighting power—energy_progress
06/06/2025Permanent certificate—energy_progress
06/06/2025Ventilation and air distribution system—energy_progress
Latest 25 of 28.
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/19/2026Q01237672-I1Request digital key ↗
08/19/2026Q01237672-S2Request digital key ↗
08/19/2026Q01237672-S1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q01237672-I1Open ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/19/2026Q01237672-S2Open ↗
08/19/2026Q01237672-S1Open ↗
08/19/2026Q01237672-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/19/2026Q01237672-S1Open ↗
08/19/2026Q01237672-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q01237672-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026Q01237672-I1Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026Q01237672-I1Open ↗
▸Other Documents3
▸DOB NOWSite Survey: Initial1
08/13/2026Q01237672-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q01237672-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026Q01237672-I1Open ↗