← Back
Two stories - detached, small or mid-size
110-15 216 STREET
QUEENS · BIN 4239961
💬 Discuss this project
1930Year Built
2Stories
A1Building Class
R2Zoning
1,280 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 3,000 sf lot · 0.43 FAR built · Flood zone X
Locations of Work
Electrical
Roof3p · 1 filing · 9 docs
1 job · most recent 08/04/2026
FiledStatusContractorScope
08/04/2026Permit IssuedSUNRUN SOLAR ELECTL CORP—
1 job · most recent 08/04/2026
FiledStatusContractorScope
08/04/2026Permit IssuedSUNRUN INSTALLATION SVC16 panels, 7.2 kw, 168.18 roof_area_sqft
Building Lifecycle
All (10)Filed (1)Permit Issued (1)Inspection (3)Special Inspection (5)
08/12/2026
Permit issued — Solar
Q01439958-I1-SL
08/04/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01439958-I1
08/04/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
08/04/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
08/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
08/03/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
08/03/2026
Special inspection requirement — Final
Walid Abdulla
09/16/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
09/16/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/16/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC108/04/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor108/13/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272108/04/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedSUNRUN INSTALLATION SVC08/12/2026
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
09/16/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
09/16/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/16/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
08/04/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
08/04/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
08/03/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
08/03/2026Energy Code Compliance InspectionsWalid Abdullaprogress
08/03/2026FinalWalid Abdullaprogress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/16/2026Q01439958-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/25/2026Q01439958-I1Open ↗
08/25/2026Q01439958-I1Open ↗
08/25/2026Q01439958-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026Q01439958-I1Open ↗
08/25/2026Q01439958-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026Q01439958-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/16/2026Q01439958-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/16/2026Q01439958-I1Open ↗