← Back
Two stories - detached, small or mid-size
21215 113 AVENUE
QUEENS · BIN 4240158
💬 Discuss this project
1925Year Built
2.5Stories
A1Building Class
R3-2Zoning
1,706 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 3,000 sf lot · 0.57 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/08/2016$455K—PROFESSIONAL DEVELOPERS, LLC → Private party$267/sf building
10/26/2015$185K—ALL NATIONS REALTY, INC. → PROFESSIONAL DEVELOPERS, LLC$108/sf building
07/23/2015$185K—Private party → ALL NATIONS REALTY, INC.$108/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KENNY LEE ARCHITECT506/30/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KORMAN DESIGN & BUILD603/21/2026
Building Lifecycle
All (79)Filed (5)Objection (44)Special Inspection (30)
07/22/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
07/06/2026
Objection raised — Other
07/06/2026
Objection raised — Inspections
07/06/2026
Objection raised — Other
07/06/2026
Objection raised — Other
07/06/2026
Objection raised — Other
07/06/2026
Objection raised — Other
07/06/2026
Objection raised — Other
07/06/2026
Objection raised — Other
07/06/2026
Objection raised — Admin
07/06/2026
Objection raised — Structural
07/06/2026
Objection raised — Other
06/30/2026
Filed — Alteration CO
INSTALLATION OF TEMPORARY FENCE
Q01301355-S4
06/26/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
05/22/2026
Objection resolved — Addressed
05/04/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
05/03/2026
Objection raised — Energy
05/03/2026
Objection raised — Scope
05/03/2026
Objection raised — Admin
04/06/2026
Objection resolved — Addressed
04/06/2026
Objection resolved — Addressed
04/06/2026
Objection resolved — Addressed
04/06/2026
Objection resolved — Addressed
04/02/2026
Filed — Alteration CO
INSTALLATION OF TEMPORARY FENCE
Q01301355-S3
04/02/2026
Objection resolved — Resolved
04/02/2026
Objection resolved — Resolved
04/02/2026
Objection resolved — Addressed
04/02/2026
Objection resolved — Open
04/02/2026
Objection resolved — Addressed
04/02/2026
Objection resolved — Resolved
04/02/2026
Objection resolved — Resolved
04/02/2026
Objection resolved — Addressed
04/02/2026
Objection resolved — Resolved
04/02/2026
Objection resolved — Addressed
03/27/2026
Special inspection requirement — Metering
03/27/2026
Special inspection requirement — Protection of exposed foundation insulation
03/27/2026
Special inspection requirement — Maintenance information
03/27/2026
Special inspection requirement — Mechanical Systems
03/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/27/2026
Special inspection requirement — Final
03/27/2026
Special inspection requirement — Energy Code Compliance Inspections
03/27/2026
Special inspection requirement — HVAC-R and service water heating system controls
03/27/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
03/27/2026
Special inspection requirement — HVAC-R and service water heating equipment
02/05/2026
Objection raised — Plumbing
02/05/2026
Objection raised — Plumbing
02/05/2026
Objection raised — Plumbing
02/05/2026
Objection raised — Plumbing
02/05/2026
Objection raised — Plumbing
02/03/2026
Objection raised — Zoning
02/03/2026
Objection raised — Structural
02/03/2026
Objection raised — Plumbing
02/03/2026
Objection raised — Scope
02/03/2026
Objection raised — Zoning
02/03/2026
Objection raised — Energy
02/03/2026
Objection raised — Scope
02/03/2026
Objection raised — Zoning
02/03/2026
Objection raised — Zoning
02/03/2026
Objection raised — Zoning
12/29/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Latest 60 of 79 events.
Nothing on file for this building.
1 project · most recent 06/30/2026
Ventilation Systems
FiledStatusContractorScope
06/30/2026——Ventilation Systems
1 project · most recent 06/30/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
06/30/2026——Gas, Storm, Water/Sanitary
1 project · most recent 06/30/2026
Wood
FiledStatusContractorScope
06/30/2026——Wood
1 project · most recent 06/30/2026
Fence
FiledStatusContractorScope
06/30/2026——Fence
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
07/22/2026Structural Stability – Alterations of existing buildings—special
06/26/2026Excavations - Sheeting, Shoring, and Bracing—special
05/04/2026Structural Stability – Alterations of existing buildings—special
03/27/2026Metering—energy_progress
03/27/2026Protection of exposed foundation insulation—energy_progress
03/27/2026Maintenance information—energy_progress
03/27/2026Mechanical Systems—special
03/27/2026Fire-Resistant Penetrations and Joints—special
03/27/2026Final—progress
03/27/2026Energy Code Compliance Inspections—progress
03/27/2026HVAC-R and service water heating system controls—energy_progress
03/27/2026HVAC-R and service water piping design and insulation—energy_progress
03/27/2026HVAC-R and service water heating equipment—energy_progress
12/29/2025Subsurface Investigations (Borings/Test Pits)—special
11/18/2025Electric vehicle service equipment requirements—energy_progress
11/18/2025Fenestration and door U-factor and product ratings—energy_progress
11/18/2025Permanent certificate—energy_progress
11/18/2025Fire-Resistant Penetrations and Joints—special
11/18/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
11/18/2025Insulation placement and R values—energy_progress
11/18/2025Fenestration air leakage—energy_progress
11/18/2025Fenestration areas—energy_progress
11/18/2025Concrete - Cast-In-Place—special
11/18/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities—special
11/18/2025Energy Code Compliance Inspections—progress
Latest 25 of 35.
▾Documents — 23 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/18/2026Q01301355-I1Request digital key ↗
08/18/2026Q01301355-S3Request digital key ↗
08/18/2026Q01301355-S2Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q01301355-I1Open ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/18/2026Q01301355-S3Open ↗
08/18/2026Q01301355-I1Open ↗
08/18/2026Q01301355-S4Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026Q01301355-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/18/2026Q01301355-S3Open ↗
08/18/2026Q01301355-I1Open ↗
08/18/2026Q01301355-S2Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports1
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q01301355-I1Open ↗
▸Other Documents5
▸DOB NOWPlot Diagram2
08/14/2026Q01301355-S4Open ↗
08/13/2026Q01301355-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q01301355-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q01301355-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/18/2026Q01301355-I1Open ↗