← Back
Two stories - detached, small or mid-size
215-20 111 ROAD
QUEENS · BIN 4240320
💬 Discuss this project
1930Year Built
2.5Stories
A1Building Class
R3-2Zoning
1,672 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 3,000 sf lot · 0.56 FAR built · Flood zone X
Locations of Work
Architecture
Basement1p · 1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
UNISOLAR107/21/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CENTURION SOLAR ENERGYGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CENTURION SOLAR ENERGY LL9475107/21/2025
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
01/06/2026
Signed off — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONICGENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.*NO CHANGE TO USE, EGRESS OR OCCUPANCY.*
Q01258901-I1
08/05/2025
Permit issued — Solar
Q01258901-I1-SL
07/21/2025
Filed — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONICGENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.*NO CHANGE TO USE, EGRESS OR OCCUPANCY.*
Q01258901-I1
07/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Andres Arias Londono
07/21/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Andres Arias Londono
07/21/2025
Special inspection requirement — Energy Code Compliance Inspections
Andres Arias Londono
07/21/2025
Special inspection requirement — Final
Andres Arias Londono
07/21/2025
Special inspection requirement — Air barrier - visual inspection
Andres Arias Londono
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offCENTURION SOLAR ENERGY08/05/2025
1 project · most recent 07/18/2025
FiledStatusContractorScope
07/18/2025CompleteBERGER QUALITY ELEC'L CON—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
07/21/2025Fire-Resistant Penetrations and JointsAndres Arias Londonospecial
07/21/2025Structural Stability – Alterations of existing buildingsAndres Arias Londonospecial
07/21/2025Energy Code Compliance InspectionsAndres Arias Londonoprogress
07/21/2025FinalAndres Arias Londonoprogress
07/21/2025Air barrier - visual inspectionAndres Arias Londonoenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/19/2026Q01258901-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026Q01258901-I1Open ↗
08/25/2026Q01258901-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/19/2026Q01258901-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026Q01258901-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/19/2026Q01258901-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01258901-I1Open ↗