← Back
One story - permanent living quarter
227-06 113 DRIVE
QUEENS · BIN 4242624
💬 Discuss this project
1940Year Built
1Stories
A2Building Class
R2AZoning
672 sfGross Floor Area
1Units
One story - permanent living quarter · 4,000 sf lot · 0.17 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Roof1p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
1 job · most recent 05/31/2022
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/31/2022Signed-offRAE MGMT INCAir Conditioning Systems
Cooling
Cooper & Hunter CH-HYP24SPH230V0 24,000 BTU · Controls ×3
1 job · most recent 06/13/2018
FiledStatusContractorScope
06/13/2018CompleteVENTURE HOME SOLAR LLC—
Building Lifecycle
All (43)Filed (4)Permit Issued (1)Signed Off (1)Inspection (1)Objection (6)Special Inspection (30)
12/11/2023
Signed off — Alteration
PROPOSED DEMOLITION OF AN EXISTING ENCLOSED SCREENED PORCH, TO BE REPLACED WITH A NEW STRUCTURAL EXTENSION ON EXISTING FOOTPRINT. WORK INCLUDES STRUCTURAL, FOUNDATION, AND MECHANICAL SYSTEMS (HVAC).
Q00566751-I1
06/06/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/02/2022
Special inspection requirement — Masonry
Naeem Anwar
06/02/2022
Special inspection requirement — Concrete - Cast-In-Place
Naeem Anwar
06/02/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Naeem Anwar
06/02/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Naeem Anwar
06/02/2022
Special inspection requirement — Subgrade Inspections
Naeem Anwar
06/02/2022
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Naeem Anwar
06/02/2022
Special inspection requirement — Mechanical Systems
Naeem Anwar
06/02/2022
Special inspection requirement — Energy Code Compliance Inspections
Naeem Anwar
06/02/2022
Special inspection requirement — Final
Naeem Anwar
06/02/2022
Special inspection requirement — Fenestration air leakage
Naeem Anwar
06/02/2022
Special inspection requirement — HVAC-R and service water heating equipment
Naeem Anwar
06/02/2022
Special inspection requirement — Lighting in dwelling units
Naeem Anwar
06/02/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Naeem Anwar
06/02/2022
Special inspection requirement — HVAC-R and service water heating system controls
Naeem Anwar
06/02/2022
Special inspection requirement — Air barrier - visual inspection
Naeem Anwar
06/02/2022
Special inspection requirement — Shutoff dampers
Naeem Anwar
06/02/2022
Special inspection requirement — Protection of exposed foundation insulation
Naeem Anwar
06/02/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Naeem Anwar
06/02/2022
Special inspection requirement — Insulation placement and R values
Naeem Anwar
06/02/2022
Special inspection requirement — Fenestration areas
Naeem Anwar
05/31/2022
Filed — Alteration
PROPOSED DEMOLITION OF AN EXISTING ENCLOSED SCREENED PORCH, TO BE REPLACED WITH A NEW STRUCTURAL EXTENSION ON EXISTING FOOTPRINT. WORK INCLUDES STRUCTURAL, FOUNDATION, AND MECHANICAL SYSTEMS (HVAC).
Q00566751-P3
05/26/2022
Special inspection requirement — Concrete - Cast-In-Place
Naeem Anwar
05/26/2022
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Naeem Anwar
05/26/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Naeem Anwar
05/26/2022
Special inspection requirement — Masonry
Naeem Anwar
05/26/2022
Special inspection requirement — Mechanical Systems
Naeem Anwar
05/26/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Naeem Anwar
05/26/2022
Special inspection requirement — Subgrade Inspections
Naeem Anwar
05/26/2022
Special inspection requirement — Energy Code Compliance Inspections
Naeem Anwar
05/26/2022
Special inspection requirement — Final
Naeem Anwar
05/26/2022
Special inspection requirement — Protection of exposed foundation insulation
Naeem Anwar
12/23/2021
Filed — Alteration
PROPOSED DEMOLITION OF AN EXISTING ENCLOSED SCREENED PORCH, TO BE REPLACED WITH A NEW STRUCTURAL EXTENSION ON EXISTING FOOTPRINT. WORK INCLUDES STRUCTURAL, FOUNDATION, AND MECHANICAL SYSTEMS (HVAC).
Q00566751-P1
12/22/2021
Permit issued — Mechanical Systems
Q00566751-I1-GC-CX
09/12/2021
Filed — Alteration
PROPOSED DEMOLITION OF AN EXISTING ENCLOSED SCREENED PORCH, TO BE REPLACED WITH A NEW STRUCTURAL EXTENSION ON EXISTING FOOTPRINT. WORK INCLUDES STRUCTURAL, FOUNDATION, AND MECHANICAL SYSTEMS (HVAC).
Q00566751-S1
08/19/2021
Objection raised — Admin
08/19/2021
Objection resolved — Addressed
08/19/2021
Objection raised — Zoning
08/19/2021
Objection resolved — Addressed
08/19/2021
Objection raised — Inspections
08/19/2021
Objection resolved — Addressed
07/30/2021
Filed — Alteration
PROPOSED DEMOLITION OF AN EXISTING ENCLOSED SCREENED PORCH, TO BE REPLACED WITH A NEW STRUCTURAL EXTENSION ON EXISTING FOOTPRINT. WORK INCLUDES STRUCTURAL, FOUNDATION, AND MECHANICAL SYSTEMS (HVAC).
Q00566751-I1
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHARLES DIEHL ARCHITECT LLC405/31/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LYNCH CONSTRUCTION403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RAE MGMT INCGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PRUDIGM ENGINEERING LLCU4304205/31/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offRAE MGMT INC12/22/2021
BISOTISSUEDVENTURE HOME SOLAR LLC04/26/2018
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
06/06/2022Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
06/02/2022MasonryNaeem Anwarspecial
06/02/2022Concrete - Cast-In-PlaceNaeem Anwarspecial
06/02/2022Structural Stability – Alterations of existing buildingsNaeem Anwarspecial
06/02/2022Fire-Resistant Penetrations and JointsNaeem Anwarspecial
06/02/2022Subgrade InspectionsNaeem Anwarspecial
06/02/2022Excavations - Sheeting, Shoring, and BracingNaeem Anwarspecial
06/02/2022Mechanical SystemsNaeem Anwarspecial
06/02/2022Energy Code Compliance InspectionsNaeem Anwarprogress
06/02/2022FinalNaeem Anwarprogress
06/02/2022Fenestration air leakageNaeem Anwarenergy_progress
06/02/2022HVAC-R and service water heating equipmentNaeem Anwarenergy_progress
06/02/2022Lighting in dwelling unitsNaeem Anwarenergy_progress
06/02/2022Fenestration and door U-factor and product ratingsNaeem Anwarenergy_progress
06/02/2022HVAC-R and service water heating system controlsNaeem Anwarenergy_progress
06/02/2022Air barrier - visual inspectionNaeem Anwarenergy_progress
06/02/2022Shutoff dampersNaeem Anwarenergy_progress
06/02/2022Protection of exposed foundation insulationNaeem Anwarenergy_progress
06/02/2022HVAC-R and service water piping design and insulationNaeem Anwarenergy_progress
06/02/2022Insulation placement and R valuesNaeem Anwarenergy_progress
06/02/2022Fenestration areasNaeem Anwarenergy_progress
05/26/2022Concrete - Cast-In-PlaceNaeem Anwarspecial
05/26/2022Excavations - Sheeting, Shoring, and BracingNaeem Anwarspecial
05/26/2022Fire-Resistant Penetrations and JointsNaeem Anwarspecial
05/26/2022MasonryNaeem Anwarspecial
05/26/2022Mechanical SystemsNaeem Anwarspecial
Latest 25 of 43.
▾Documents — 97 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/26/2026Q00566751-P1Contact architect ↗
08/26/2026Q00566751-S1Contact architect ↗
08/26/2026Q00566751-P3Contact architect ↗
Showing 3 of 4 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
04/20/2018440478038Open ↗
▸BISWORK PERMIT APPLICATION1
04/20/2018440478038Open ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q00566751-I1Open ↗
08/13/2026Q00566751-P3Open ↗
▸Seals & Professional Certifications50
▸DOB NOWProgress Inspector Seal & Signature28
09/22/2026Q00566751-P3Open ↗
09/22/2026Q00566751-P3Open ↗
09/22/2026Q00566751-P3Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/22/2026Q00566751-P3Open ↗
09/22/2026Q00566751-P3Open ↗
09/22/2026Q00566751-P3Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/26/2026Q00566751-P3Open ↗
08/26/2026Q00566751-P1Open ↗
08/26/2026Q00566751-S1Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
04/20/2018440478038Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
04/20/2018440478038Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/20/2018440478038Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
04/20/2018440478038Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/26/2026Q00566751-P3Open ↗
08/26/2026Q00566751-S1Open ↗
08/26/2026Q00566751-P1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
04/20/2018440478038Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
01/17/2019440478038Open ↗
04/20/2018440478038Open ↗
04/20/2018440478038Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
04/20/2018440478038Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
01/17/2019440478038Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION1
01/17/2019440478038Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
04/20/2018440478038Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00566751-I1Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY4
01/17/2019440478038Open ↗
01/17/2019440478038Open ↗
04/20/2018440478038Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSOIL REPORT2
08/13/2026Q00566751-S1Open ↗
08/13/2026Q00566751-P1Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
04/20/2018440478038Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026Q00566751-S1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00566751-S1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISUtility Company PV System Interconnection Acknowledgement Letter1
01/17/2019440478038Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/17/2019440478038Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
01/18/2019440478038Open ↗
04/20/2018440478038Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
01/11/2019440478038Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
04/20/2018440478038Open ↗
▸Other Documents10
▸DOB NOWPlot Diagram4
08/13/2026Q00566751-P1Open ↗
08/13/2026Q00566751-S1Open ↗
08/13/2026Q00566751-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q00566751-P3Open ↗
08/13/2026Q00566751-I1Open ↗
▸DOB NOWSURVEY: INITIAL2
08/13/2026Q00566751-P3Open ↗
08/13/2026Q00566751-I1Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
04/20/2018440478038Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00566751-S1Open ↗