← Back
Two stories - detached, small or mid-size
142-21 122 AVENUE
QUEENS · BIN 4261293
💬 Discuss this project
1925Year Built
2Stories
A1Building Class
R3AZoning
1,364 sfGross Floor Area
1Units
0 Open Violations
Two stories - detached, small or mid-size · 3,827 sf lot · 0.36 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC107/29/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor108/01/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272107/29/2026
Building Lifecycle
All (9)Filed (1)Permit Issued (1)Violation (1)Inspection (1)Special Inspection (5)
08/12/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/31/2026
Permit issued — Solar
Q01437312-I1-SL
07/29/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01437312-I1
07/29/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
07/29/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
07/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
07/28/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
07/28/2026
Special inspection requirement — Final
Walid Abdulla
04/09/2012
Violation issued (ECB, closed)
Unknown
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC07/31/2026
2 projects · most recent 08/06/2026
HVAC Wiring
FiledStatusContractorScope
08/06/2026Permit IssuedJKL ELECTRIC LLCHVAC Wiring
07/29/2026CompleteSUNRUN SOLAR ELECTL CORP—
1 project · most recent 07/29/2026
FiledStatusContractorScope
07/29/2026Signed-offSUNRUN INSTALLATION SVC15 panels, 6.75 kw, 315.34 roof_area_sqft
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
08/12/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
07/29/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
07/29/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
07/28/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
07/28/2026Energy Code Compliance InspectionsWalid Abdullaprogress
07/28/2026FinalWalid Abdullaprogress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/16/2026Q01437312-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/29/2026Q01437312-I1Open ↗
08/29/2026Q01437312-I1Open ↗
08/29/2026Q01437312-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/29/2026Q01437312-I1Open ↗
08/29/2026Q01437312-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026Q01437312-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/16/2026Q01437312-I1Open ↗