← Back
Community center
Alpha Kappa Alpha Sorority Child Care Center
144-06 ROCKAWAY BOULEVARD · BIN 4261925
💬 Discuss this project
1971Year Built
2Stories
P5Building Class
R5DZoning
12,700 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Community center · Owner of record: RD ROCKAWAY LLC · 12,617 sf lot · 1.01 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof10p · 4 filings · 20 docs
Bulkhead1p · 1 filing · 16 docs
Floor 213p · 4 filings · 20 docs
Floor 114p · 4 filings · 20 docs
Cellar17p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
144-06 ROCKAWAY BLVD203/22/2026
144 ROCKAWAY1103/22/2026
144 ROCKAWAY ASSSOC IN103/22/2026
144 ROCKAWAY ASSOC. IN103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/21/2021$7.5M—144 ROCKAWAY ASSOCIATES LLC → RD ROCKAWAY LLC$591/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
COMMERCIAL CAPITAL USA403/21/2026
N N CONSULTANT803/21/2026
CITY EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GLOBAL HOME IMPROVEMENTSGeneral Contractor1007/08/2026
FRANCIS RICHARDSElectrical103/21/2026
TRUE POWER ELECL CONT LLCElectrical103/22/2026
DESIGN PROCURE BUILD LLCGeneral Contractor104/09/2026
P.H. WORKS INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MSM ENGINEERING SERVICES,8449203/12/2026
REGIONAL TESTING CORP.394502/14/2023
Building Lifecycle
All (92)Filed (7)Permit Issued (6)Signed Off (4)Violation (38)Inspection (3)Objection (4)Special Inspection (30)
03/13/2026
Special inspection requirement — Mechanical Systems
MOHAMED MAHMOUD
03/13/2026
Special inspection requirement — HVAC-R and service water heating equipment
MOHAMED MAHMOUD
03/13/2026
Special inspection requirement — Maintenance information
MOHAMED MAHMOUD
03/13/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MOHAMED MAHMOUD
03/13/2026
Special inspection requirement — HVAC-R and service water heating system controls
MOHAMED MAHMOUD
03/13/2026
Special inspection requirement — Final
MOHAMED MAHMOUD
03/13/2026
Special inspection requirement — Energy Code Compliance Inspections
MOHAMED MAHMOUD
03/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
03/13/2026
Special inspection requirement — Post-installed Anchors
MOHAMED MAHMOUD
03/12/2026
Filed — Alteration
FILING THIS APPLICATION FOR (3) SPLIT HVAC SYSTEMS; WORK INCLUDES THE INSTALLATION OF 3 NEW CONDENSERS LOCATED IN THE OSP AND 3 AIR HANDLERS LOCATED AT THE CELLAR, 1ST., AND 2ND. FLOORS.
Q01264233-P2
12/12/2025
Special inspection requirement — HVAC-R and service water heating system controls
MOHAMED MAHMOUD
12/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
12/12/2025
Special inspection requirement — Mechanical Systems
MOHAMED MAHMOUD
12/12/2025
Special inspection requirement — Post-installed Anchors
MOHAMED MAHMOUD
12/12/2025
Special inspection requirement — Energy Code Compliance Inspections
MOHAMED MAHMOUD
12/12/2025
Special inspection requirement — Final
MOHAMED MAHMOUD
12/12/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MOHAMED MAHMOUD
12/12/2025
Special inspection requirement — Maintenance information
MOHAMED MAHMOUD
12/12/2025
Special inspection requirement — HVAC-R and service water heating equipment
MOHAMED MAHMOUD
08/11/2025
Permit issued — Mechanical Systems
Q01264233-I1-MS
08/05/2025
Filed — Alteration
FILING THIS APPLICATION FOR (3) SPLIT HVAC SYSTEMS; WORK INCLUDES THE INSTALLATION OF 3 NEW CONDENSERS LOCATED IN THE OSP AND 3 AIR HANDLERS LOCATED AT THE CELLAR, 1ST., AND 2ND. FLOORS.
Q01264233-I1
02/02/2024
Signed off — Alteration
REPAIRING EXISTING PIERS AT SEVERAL LOCATION BY PATCHING AND GROUTING. NO OTHER WORKTO BE DONE ON STRUCTURE. STRUCTURE TO REMAIN
Q00725275-S1
11/20/2023
Violation issued (FDNY_NOV, closed)
09/11/2023
Violation issued (FDNY_NOV, closed)
03/23/2023
Signed off — Alteration
FILING HEREWITH APPLICATION TO REPLACE EXISTING DRAIN LINES, VALVES AND EXISTING PLUMBING FIXTURES THROUGHOUT. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00726310-I1
03/20/2023
Signed off — Alteration
Q00726316-I1
03/20/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/17/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/16/2023
Signed off — Alteration
REPAIRING EXISTING PIERS AT SEVERAL LOCATION BY PATCHING AND GROUTING. NO OTHER WORKTO BE DONE ON STRUCTURE. STRUCTURE TO REMAIN
Q00725275-I1
03/09/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/15/2023
Permit issued — Structural
Q00725275-S1-ST
02/14/2023
Filed — Alteration
REPAIRING EXISTING PIERS AT SEVERAL LOCATION BY PATCHING AND GROUTING. NO OTHER WORKTO BE DONE ON STRUCTURE. STRUCTURE TO REMAIN
Q00725275-S1
02/13/2023
Special inspection requirement — Final
Paul Raymond
02/13/2023
Special inspection requirement — Masonry
Paul Raymond
11/20/2022
Permit issued — Plumbing
Q00726310-I1-PL
10/20/2022
Permit issued — Mechanical Systems
Q00726316-I1-MS
10/20/2022
Permit issued — Structural
Q00726321-I1-ST
10/20/2022
Permit issued — General Construction
Q00725275-I1-GC
08/17/2022
Objection raised — Scope
08/17/2022
Objection resolved — Addressed
08/11/2022
Filed — Alteration
FILING HEREWITH APPLICATION TO REPLACE EXISTING DRAIN LINES, VALVES AND EXISTING PLUMBING FIXTURES THROUGHOUT. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00726310-I1
08/11/2022
Filed — Alteration
Q00726316-I1
07/18/2022
Objection raised — Admin
07/18/2022
Objection resolved — Addressed
07/12/2022
Filed — Alteration
REPAIRING EXISTING PIERS AT SEVERAL LOCATION BY PATCHING AND GROUTING. NO OTHER WORKTO BE DONE ON STRUCTURE. STRUCTURE TO REMAIN
Q00725275-I1
07/12/2022
Filed — Alteration
FILING HEREWITH APPLICATION FOR STRUCTURAL WORK TYPE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00726321-I1
06/12/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Paul Raymond
06/12/2022
Special inspection requirement — Masonry
Paul Raymond
06/12/2022
Special inspection requirement — Concrete - Cast-In-Place
Paul Raymond
04/26/2022
Special inspection requirement — Final
Paul Raymond
04/26/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
04/25/2022
Special inspection requirement — Energy Code Compliance Inspections
Paul Raymond
04/25/2022
Special inspection requirement — Fenestration air leakage
Paul Raymond
04/25/2022
Special inspection requirement — Interior lighting power
Paul Raymond
04/25/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Paul Raymond
04/25/2022
Special inspection requirement — Air barrier - visual inspection
Paul Raymond
09/03/2020
Violation issued (FDNY_NOV, closed)
05/20/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/04/2018
Violation issued (ECB, closed)
Construction
09/15/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 92 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedDESIGN PROCURE BUILD08/11/2025
DOB NOWStructuralSigned-offGLOBAL HOME IMPROVEMENTS02/15/2023
DOB NOWPlumbingSigned-offP.H. WORKS INC11/20/2022
DOB NOWMechanical SystemsSigned-offGLOBAL HOME IMPROVEMENTS10/20/2022
DOB NOWStructuralPermit IssuedGLOBAL HOME IMPROVEMENTS10/20/2022
DOB NOWGeneral ConstructionSigned-offGLOBAL HOME IMPROVEMENTS10/20/2022
BISFPISSUEDMASTER FIRE SYSTEMS, INC03/31/2004
BISOTISSUEDC&A SENECA CONSTRUCTION L10/29/2003
BISPLISSUEDPACE PLG CO01/27/2003
BISMHISSUEDC&A SENECA CONSTRUCTION L01/16/2003
BISOTISSUEDC&A SENECA CONSTRUCTION L01/15/2003
BISOTISSUEDDNA CONSTRUCTION CORPORATION03/12/1998
BISEQISSUEDSPRING ENTERPRISES ,INC.03/12/1998
BISMHISSUED144 ROCKAWAY ASSOCIATES10/07/1992
1 job · most recent 02/16/2023
General Wiring
FiledStatusContractorScope
02/16/2023CompleteTRUE POWER ELECL CONT LLCGeneral Wiring
1 job · most recent 07/12/2022
Masonry
FiledStatusContractorScope
07/12/2022Permit IssuedGLOBAL HOME IMPROVEMENTSMasonry
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
03/20/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/17/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/09/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
03/13/2026Mechanical SystemsMOHAMED MAHMOUDspecial
03/13/2026HVAC-R and service water heating equipmentMOHAMED MAHMOUDenergy_progress
03/13/2026Maintenance informationMOHAMED MAHMOUDenergy_progress
03/13/2026HVAC-R and service water piping design and insulationMOHAMED MAHMOUDenergy_progress
03/13/2026HVAC-R and service water heating system controlsMOHAMED MAHMOUDenergy_progress
03/13/2026FinalMOHAMED MAHMOUDprogress
03/13/2026Energy Code Compliance InspectionsMOHAMED MAHMOUDprogress
03/13/2026Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
03/13/2026Post-installed AnchorsMOHAMED MAHMOUDspecial
12/12/2025HVAC-R and service water heating system controlsMOHAMED MAHMOUDenergy_progress
12/12/2025Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
12/12/2025Mechanical SystemsMOHAMED MAHMOUDspecial
12/12/2025Post-installed AnchorsMOHAMED MAHMOUDspecial
12/12/2025Energy Code Compliance InspectionsMOHAMED MAHMOUDprogress
12/12/2025FinalMOHAMED MAHMOUDprogress
12/12/2025HVAC-R and service water piping design and insulationMOHAMED MAHMOUDenergy_progress
12/12/2025Maintenance informationMOHAMED MAHMOUDenergy_progress
12/12/2025HVAC-R and service water heating equipmentMOHAMED MAHMOUDenergy_progress
02/13/2023FinalPaul Raymondprogress
02/13/2023MasonryPaul Raymondspecial
06/12/2022Structural Stability – Alterations of existing buildingsPaul Raymondspecial
06/12/2022MasonryPaul Raymondspecial
06/12/2022Concrete - Cast-In-PlacePaul Raymondspecial
04/26/2022FinalPaul Raymondprogress
04/26/2022Fire-Resistant Penetrations and JointsPaul Raymondspecial
Latest 25 of 32.
▾Documents — 43 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/26/2026Q00726316-I1Request digital key ↗
08/26/2026Q00726310-I1Request digital key ↗
08/25/2026Q00725275-S1Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications27
▸DOB NOWProgress Inspector Seal & Signature12
09/23/2026Q01264233-I1Open ↗
09/23/2026Q01264233-I1Open ↗
09/01/2026Q00726321-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/23/2026Q01264233-I1Open ↗
09/01/2026Q00726321-I1Open ↗
09/01/2026Q00726321-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/17/2026Q01264233-I1Open ↗
08/13/2026Q01264233-P2Open ↗
08/13/2026Q00726321-I1Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/17/2026Q01264233-I1Open ↗
08/13/2026Q01264233-P2Open ↗
08/13/2026Q00726316-I1Open ↗
Showing 3 of 7 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026Q00726316-I1Open ↗
08/13/2026Q00725275-I1Open ↗