Two family converted from one family
129-12 143 STREET
QUEENS · BIN 4262070
💬 Discuss this project
1955Year Built
2Stories
B3Building Class
R3AZoning
—Gross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family converted from one family · 0.6 FAR built · Flood zone X
Locations of Work
Electrical
Permit Issued — active, not yet Signed-off
RoofUnder Construction1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TRINITY SOLAR LLC108/17/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRINITY SOLAR LLCGeneral Contractor108/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BITOPI CONSULTANTS LLC7036108/17/2026
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Violation (1)Special Inspection (5)
08/20/2026
Permit issued — Solar
Q01444376-I1-SL
08/17/2026
Filed — Alteration
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
Q01444376-I1
08/11/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
KAMRUL AHSAN
08/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
KAMRUL AHSAN
08/11/2026
Special inspection requirement — Energy Code Compliance Inspections
Ayracon Almaraz
08/11/2026
Special inspection requirement — Final
Ayracon Almaraz
08/11/2026
Special inspection requirement — Air barrier - visual inspection
Ayracon Almaraz
02/10/2010
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedTRINITY SOLAR LLC08/20/2026
BISPLISSUEDW.R. PLBG AND HTG CORP02/09/2005
BIS—ISSUEDFAB-TEC CONSTRUCTION AND METAL I02/08/2005
1 project · most recent 08/10/2026
FiledStatusContractorScope
08/10/2026Permit IssuedREDLINE ELECTRIC INC—
1 project · most recent 08/17/2026
FiledStatusContractorScope
08/17/2026Permit IssuedTRINITY SOLAR LLC63 panels, 25.83 kw, 1,248 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
08/11/2026Structural Stability – Alterations of existing buildingsKAMRUL AHSANspecial
08/11/2026Fire-Resistant Penetrations and JointsKAMRUL AHSANspecial
08/11/2026Energy Code Compliance InspectionsAyracon Almarazprogress
08/11/2026FinalAyracon Almarazprogress
08/11/2026Air barrier - visual inspectionAyracon Almarazenergy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/18/2026Q01444376-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/26/2026Q01444376-I1Open ↗
08/26/2026Q01444376-I1Open ↗
08/26/2026Q01444376-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/26/2026Q01444376-I1Open ↗
08/26/2026Q01444376-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/18/2026Q01444376-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/18/2026Q01444376-I1Open ↗