← Back
Two family converted from one family
137-11 131 AVENUE
QUEENS · BIN 4262200
💬 Discuss this project
1920Year Built
2Stories
B3Building Class
R3AZoning
1,612 sfGross Floor Area
2Units
11 Open Violations ▸FDNY Report ↗
Two family converted from one family · 6,312 sf lot · 0.26 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Floor 18p · 1 filing · 20 docs
Cellar11p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HPD307/08/2026
ANSWER CONSTRUCTION407/08/2026
AROCK INC203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARC-HI-TECT ASSOCIATE INC601/19/2025
ENTHINK ENGINEERS LLC104/27/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARC-HI-TECT ASSOCIATE1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AAKASH CONSTRUCTION INCGeneral Contractor107/08/2026
ANSWER CONSTRUCTION CORPGeneral Contractor107/08/2026
PLBG P & H INCPlumbing107/08/2026
WATERMARK PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ARC-HI-TECH ASSOCIATES IN6963501/19/2025
Building Lifecycle
All (57)Filed (7)Permit Issued (4)Signed Off (1)Violation (24)Inspection (8)Objection (2)Special Inspection (11)
02/25/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/31/2025
Special inspection requirement — Energy Code Compliance Inspections
IGOR LISOVENKO
01/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
IGOR LISOVENKO
01/19/2025
Filed — Alteration
Remove & cap two gas ranges and two kitchen sinks to comply with ECB violations 39059139Y & 39059138M, and remove dryer from 1st floor bathroom. also gas pressure test of existing roughing due to gas disconnect from the meter by the utility company.
Q00860615-P4
01/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
IGOR LISOVENKO
01/14/2025
Special inspection requirement — Energy Code Compliance Inspections
IGOR LISOVENKO
12/16/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/05/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/14/2024
Filed — Alteration
Remove & cap two gas ranges and two kitchen sinks to comply with ECB violations 39059139Y & 39059138M, and remove dryer from 1st floor bathroom. also gas pressure test of existing roughing due to gas disconnect from the meter by the utility company.
Q00860615-P3
10/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
IGOR LISOVENKO
10/07/2024
Special inspection requirement — Energy Code Compliance Inspections
IGOR LISOVENKO
08/26/2024
Permit issued — Plumbing
Q15109005-I1-PL
07/03/2024
Objection resolved — Addressed
12/06/2023
Objection raised — Scope
11/27/2023
Filed — Alteration
Remove & cap two gas ranges and two kitchen sinks to comply with ECB violations 39059139Y & 39059138M, and remove dryer from 1st floor bathroom. also gas pressure test of existing roughing due to gas disconnect from the meter by the utility company.
Q00860615-P2
11/21/2023
Special inspection requirement — Energy Code Compliance Inspections
IGOR LISOVENKO
11/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
IGOR LISOVENKO
10/04/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/25/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/21/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/20/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/20/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/11/2023
Filed — Alteration
Remove & cap two gas ranges and two kitchen sinks to comply with ECB violations 39059139Y & 39059138M, and remove dryer from 1st floor bathroom. also gas pressure test of existing roughing due to gas disconnect from the meter by the utility company.
Q00860615-P1
08/26/2023
Special inspection requirement — Energy Code Compliance Inspections
IGOR LISOVENKO
08/26/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
IGOR LISOVENKO
06/16/2023
Permit issued — Plumbing
Q00860615-I1-PL
04/18/2023
Filed — Alteration
Remove & cap two gas ranges and two kitchen sinks to comply with ECB violations 39059139Y & 39059138M, and remove dryer from 1st floor bathroom. also gas pressure test of existing roughing due to gas disconnect from the meter by the utility company.
Q00860615-I1
11/08/2022
Violation issued (ECB, closed)
Construction
11/08/2022
Violation issued (ECB, closed)
Unknown
11/08/2022
Violation issued (ECB, closed)
Construction
08/30/2022
Signed off — Alteration
REPAIR EXTERIOR REAR WALL OF FIRST AND SECOND FLOOR DUE TO FIRE DAMAGE.REPLACE WINDOWS AND OTHER NECESSARY WORK AS PER FIELD CONDITIONS. TO COMPLY ECB VIOLATION 39059138M,39059139Y, & 39059140L. ALSO LIFTING FULLVACATE ORDER NO CHANGE IN USE, EGRESS,HOUSE
Q00780071-I1
08/12/2022
Permit issued — General Construction
Q00780071-I1-GC
07/27/2022
Filed — Alteration
REPAIR EXTERIOR REAR WALL OF FIRST AND SECOND FLOOR DUE TO FIRE DAMAGE.REPLACE WINDOWS AND OTHER NECESSARY WORK AS PER FIELD CONDITIONS. TO COMPLY ECB VIOLATION 39059138M,39059139Y, & 39059140L. ALSO LIFTING FULLVACATE ORDER NO CHANGE IN USE, EGRESS,HOUSE
Q00780071-I1
07/22/2022
Special inspection requirement — Final
IGOR LISOVENKO
05/23/2022
Permit issued — Construction Fence
Q00724652-I1-FN
05/17/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/27/2022
Filed — Alteration
Q00724652-I1
03/29/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/06/2008
Violation issued (ECB, closed)
Construction
10/06/2008
Violation issued (ECB, closed)
Quality of Life
03/22/2004
Violation issued (ECB, closed)
Construction
03/22/2004
Violation issued (ECB, closed)
Construction
02/03/2004
Violation issued (ECB, closed)
Construction
09/24/2002
Violation issued (HPD, open)
B
09/24/2002
Violation issued (HPD, open)
A
09/24/2002
Violation issued (HPD, open)
B
09/24/2002
Violation issued (HPD, open)
B
09/24/2002
Violation issued (HPD, open)
B
09/24/2002
Violation issued (HPD, open)
B
09/24/2002
Violation issued (HPD, open)
B
09/24/2002
Violation issued (HPD, open)
B
07/26/1998
Violation issued (ECB, closed)
Quality of Life
07/26/1998
Violation issued (ECB, closed)
Quality of Life
07/02/1998
Violation issued (ECB, closed)
Quality of Life
10/09/1992
Violation issued (ECB, closed)
Construction
10/09/1992
Violation issued (ECB, closed)
Construction
09/10/1992
Violation issued (DOB, closed)
VPW*-VIOLATION UNSERVED ECB-WORK WITHOUT PERMIT-DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offPLBG P & H INC08/26/2024
DOB NOWPlumbingPermit IssuedWATERMARK PLUMBING CORP06/16/2023
DOB NOWGeneral ConstructionSigned-offANSWER CONSTRUCTION CORP08/12/2022
DOB NOWConstruction FencePermit IssuedAAKASH CONSTRUCTION INC05/23/2022
BISOTISSUEDVENTURE HOME SOLAR LLC05/01/2019
BIS—ISSUEDMARCO POLO DESIGN CORP08/08/2013
BISPLISSUEDMARCO POLO PLBG & HTG INC08/07/2013
BISPLISSUEDPFEIFFER P,HTG,SPKL CONT11/29/2012
BIS—ISSUEDMARCO POLO DESIGN CORP11/29/2012
BISPLISSUEDTHE PLUMBING CO INC08/25/2008
BIS—ISSUEDCASTLE CONSTR DESIGN CORP06/18/2008
1 project · most recent 01/19/2025
Gas Water/Sanitary
FiledStatusContractorScope
01/19/2025Permit IssuedWATERMARK PLUMBING CORPGas, Water/Sanitary
2 projects · most recent 05/13/2022
FiledStatusContractorScope
05/13/2022Permit IssuedPOWER SURGE ELECTRIC, INC3 meters
06/10/2019CompleteVENTURE HOME SOLAR LLC—
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
02/25/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/16/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/05/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/04/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/25/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/21/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/20/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/20/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
01/31/2025Energy Code Compliance InspectionsIGOR LISOVENKOprogress
01/31/2025Fire-Resistant Penetrations and JointsIGOR LISOVENKOspecial
01/14/2025Fire-Resistant Penetrations and JointsIGOR LISOVENKOspecial
01/14/2025Energy Code Compliance InspectionsIGOR LISOVENKOprogress
10/07/2024Fire-Resistant Penetrations and JointsIGOR LISOVENKOspecial
10/07/2024Energy Code Compliance InspectionsIGOR LISOVENKOprogress
11/21/2023Energy Code Compliance InspectionsIGOR LISOVENKOprogress
11/21/2023Fire-Resistant Penetrations and JointsIGOR LISOVENKOspecial
08/26/2023Energy Code Compliance InspectionsIGOR LISOVENKOprogress
08/26/2023Fire-Resistant Penetrations and JointsIGOR LISOVENKOspecial
07/22/2022FinalIGOR LISOVENKOprogress
▾Documents — 98 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/26/2026Q00724652-I1Request digital key ↗
08/26/2026Q00780071-I1Request digital key ↗
08/21/2026Q00860615-P4Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits18
▸BISPLAN / WORK APPROVAL APPLICATION9
04/30/2019440545279Open ↗
06/19/2014410051465Open ↗
02/21/2014410051465Open ↗
Showing 3 of 9 on file for this type
▸BISWORK PERMIT APPLICATION7
05/01/2019440545279Open ↗
08/14/2013410051465Open ↗
08/13/2013410051465Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
08/22/2013410051465Open ↗
07/13/2009410051465Open ↗
▸Seals & Professional Certifications21
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/26/2026Q00724652-I1Open ↗
08/21/2026Q00860615-P4Open ↗
08/21/2026Q00860615-P3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026Q00860615-P4Open ↗
08/29/2026Q00860615-P1Open ↗
08/28/2026Q00860615-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026Q00860615-P4Open ↗
08/29/2026Q00860615-P1Open ↗
08/28/2026Q00860615-P2Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
04/30/2019440545279Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
01/11/2008410051465Open ↗
▸BISPC FULL REPORT1
01/11/2008410051465Open ↗
▸Trade Schedules & Equipment14
▸BISSCHEDULE B - PLUMBING7
06/19/2014410051465Open ↗
11/06/2013410051465Open ↗
07/12/2013410051465Open ↗
Showing 3 of 7 on file for this type
▸BISSELF-CERT PLUMBING NOTICE5
09/09/2014410051465Open ↗
10/02/2013410051465Open ↗
09/24/2013410051465Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
06/25/2014410051465Open ↗
▸BISDETECTOR:SMOKE-CERTIFICATE OF INSTALLATION1
09/23/2013410051465Open ↗
▸Safety & Tenant Protection2
▸BISTENANT PROTECTION PLAN AND NOTES1
04/30/2019440545279Open ↗
▸BISST-1: Street Tree Checklist1
05/28/2008410051465Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/21/2026Q00860615-P4Open ↗
08/21/2026Q00860615-P3Open ↗
08/21/2026Q00860615-P1Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
01/11/2008410051465Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
04/01/2020440545279Open ↗
04/30/2019440545279Open ↗
04/30/2019440545279Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
04/30/2019440545279Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
04/01/2020440545279Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
04/01/2020440545279Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY5
04/01/2020440545279Open ↗
04/01/2020440545279Open ↗
04/30/2019440545279Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs10
▸BISLETTERS - SUPPORTING DOCUMENTATION3
09/24/2014410051465Open ↗
03/03/2014410051465Open ↗
09/04/2013410051465Open ↗
▸BISSUPERSEDING LETTER2
12/03/2012410051465Open ↗
12/03/2012410051465Open ↗
▸BISSCHEDULE A - OCCUPANCY - USE1
07/03/2014410051465Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
01/11/2008410051465Open ↗
▸BISMaster Plumber Seal Temporary Approval Letter1
09/24/2013410051465Open ↗
▸BISUtility Company PV System Interconnection Acknowledgement Letter1
04/01/2020440545279Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
04/01/2020440545279Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT4
04/01/2020440545279Open ↗
04/30/2019440545279Open ↗
09/24/2014410051465Open ↗
Showing 3 of 4 on file for this type
▸BISDEPT OF FINANCE VERIFICATION1
03/04/2014410051465Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
04/30/2019440545279Open ↗
▸Other Documents2
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
04/30/2019440545279Open ↗
▸BISPlot Diagram1
02/21/2014410051465Open ↗