← Back
Two stories - detached, small or mid-size
133-14 140 STREET
QUEENS · BIN 4262465
💬 Discuss this project
1925Year Built
2Stories
A1Building Class
R3AZoning
1,326 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 3,664 sf lot · 0.36 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Roof1p · 1 filing · 16 docs
Floor 218p · 2 filings · 20 docs
Floor 117p · 2 filings · 20 docs
Cellar15p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SUNG HO SHIN ARCHITECT, PC1107/20/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BRICKSTONE CONST & RENOVGeneral Contractor707/08/2026
PLUMB-IT MECHANICAL INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
J&R DESIGN AND INSPECTION6637607/20/2026
SUNG HO SHIN ARCHITECT2997401/23/2026
Building Lifecycle
All (61)Filed (11)Permit Issued (5)Violation (8)Inspection (5)Objection (2)Special Inspection (30)
07/20/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED HORIZONTAL ADDITION TO THE SECOND FLOOR.
Q00680530-P9
03/09/2026
Permit issued — Plumbing
Q00866586-I1-PL
02/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SUNG HO SHIN
01/23/2026
Filed — Alteration
CELLAR: NEW GAS TANKLESS HOT WATER HEATER, REMOVE GAS FURNACE. EXISTING 1 GAS METER TO REMAIN. EXISTING GAS DRYER, EXISTING WASH MACHINE. 2ND FLOOR: NEW 6 FIXTURES BATHROOM, 1 NEW KITCHEN SINK, NEW 1 DISHWASHER, NEW 1 WASH MACHINE, AND NEW RAINFALL DRYWEL
Q00866586-P3
01/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SUNG HO SHIN
12/17/2025
Filed — Alteration
CELLAR: NEW GAS TANKLESS HOT WATER HEATER, REMOVE GAS FURNACE. EXISTING 1 GAS METER TO REMAIN. EXISTING GAS DRYER, EXISTING WASH MACHINE. 2ND FLOOR: NEW 6 FIXTURES BATHROOM, 1 NEW KITCHEN SINK, NEW 1 DISHWASHER, NEW 1 WASH MACHINE, AND NEW RAINFALL DRYWEL
Q00866586-P2
12/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SUNG HO SHIN
11/21/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/21/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
11/14/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/10/2025
Special inspection requirement — HVAC-R and service water heating equipment
11/10/2025
Special inspection requirement — HVAC-R and service water heating system controls
11/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
11/10/2025
Special inspection requirement — Fenestration areas
Robert Truskosky
11/10/2025
Special inspection requirement — Smoke Control Systems Testing
Robert Truskosky
11/10/2025
Special inspection requirement — Footing and Foundation
Robert Truskosky
11/10/2025
Special inspection requirement — Fire-Resistance Rated Construction
Robert Truskosky
11/10/2025
Special inspection requirement — Ventilation and air distribution system
11/10/2025
Special inspection requirement — Air barrier — testing
11/10/2025
Special inspection requirement — Air barrier - visual inspection
Robert Truskosky
11/10/2025
Special inspection requirement — Permanent certificate
Robert Truskosky
11/10/2025
Special inspection requirement — Structural Steel - Details
11/10/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Robert Truskosky
11/10/2025
Special inspection requirement — Concrete - Cast-In-Place
Robert Truskosky
11/10/2025
Special inspection requirement — Structural Cold-Formed Steel
Robert Truskosky
11/10/2025
Special inspection requirement — Mechanical Systems
Robert Truskosky
11/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Truskosky
11/10/2025
Special inspection requirement — Final
Jonar Madriaga
11/10/2025
Special inspection requirement — Energy Code Compliance Inspections
Robert Truskosky
11/10/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Robert Truskosky
11/10/2025
Special inspection requirement — Electric vehicle service equipment requirements
Robert Truskosky
11/10/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Robert Truskosky
11/10/2025
Special inspection requirement — Insulation placement and R values
Robert Truskosky
11/10/2025
Special inspection requirement — Exterior lighting power
Robert Truskosky
11/10/2025
Special inspection requirement — Interior lighting power
Robert Truskosky
11/10/2025
Special inspection requirement — Lighting controls
Robert Truskosky
11/10/2025
Special inspection requirement — Fenestration air leakage
Robert Truskosky
10/16/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED HORIZONTAL ADDITION TO THE SECOND FLOOR.
Q00680530-P8
09/05/2025
Objection resolved — Addressed
08/26/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED HORIZONTAL ADDITION TO THE SECOND FLOOR.
Q00680530-P3
08/11/2025
Objection raised — Cost
08/01/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED HORIZONTAL ADDITION TO THE SECOND FLOOR.
Q00680530-P2
07/18/2025
Filed — Alteration
CELLAR: NEW GAS TANKLESS HOT WATER HEATER, REMOVE GAS FURNACE. EXISTING 1 GAS METER TO REMAIN. EXISTING GAS DRYER, EXISTING WASH MACHINE. 2ND FLOOR: NEW 6 FIXTURES BATHROOM, 1 NEW KITCHEN SINK, NEW 1 DISHWASHER, NEW 1 WASH MACHINE, AND NEW RAINFALL DRYWEL
Q00866586-P1
07/16/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
07/16/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/02/2025
Permit issued — Plumbing
Q00866586-I1-PL
09/03/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED HORIZONTAL ADDITION TO THE SECOND FLOOR.
Q00680530-P1
08/27/2024
Permit issued — Construction Fence
Q00866603-I1-FN
06/11/2024
Permit issued — General Construction
Q00680530-I1-GC
05/31/2024
Permit issued — Construction Fence
Q00866603-I1-FN
03/19/2024
Filed — Alteration
Q00866603-I1
03/08/2024
Filed — Alteration
CELLAR: NEW GAS TANKLESS HOT WATER HEATER, REMOVE GAS FURNACE. EXISTING 1 GAS METER TO REMAIN. EXISTING GAS DRYER, EXISTING WASH MACHINE. 2ND FLOOR: NEW 6 FIXTURES BATHROOM, 1 NEW KITCHEN SINK, NEW 1 DISHWASHER, NEW 1 WASH MACHINE, AND NEW RAINFALL DRYWEL
Q00866586-I1
08/12/2022
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED HORIZONTAL ADDITION TO THE SECOND FLOOR.
Q00680530-I1
04/25/2019
Violation issued (ECB, closed)
Quality of Life
04/25/2019
Violation issued (ECB, closed)
Quality of Life
04/25/2019
Violation issued (ECB, closed)
Quality of Life
04/25/2019
Violation issued (ECB, closed)
Quality of Life
04/25/2019
Violation issued (ECB, closed)
Construction
06/20/1998
Violation issued (ECB, closed)
Zoning
06/20/1998
Violation issued (ECB, closed)
HPD
Latest 60 of 61 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJVR PLBG AND HEATING INC03/09/2026
DOB NOWPlumbingSigned-offJVR PLBG AND HEATING INC07/02/2025
DOB NOWConstruction FencePermit IssuedBRICKSTONE CONST & RENOV08/27/2024
DOB NOWGeneral ConstructionPermit IssuedBRICKSTONE CONST & RENOV06/11/2024
DOB NOWConstruction FencePermit IssuedBRICKSTONE CONST & RENOV05/31/2024
1 project · most recent 07/20/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/20/2026Permit IssuedBRICKSTONE CONST & RENOVAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Mitsubishi Electric MINI-SPLIT BY MITSUBISHI 700 BTU · Fan Coil Indoor ×10
Heating
Mitsubishi Electric MSZ-FS15NA 700 BTU · Fan Coil Indoor ×10
Ventilation
Air King BFQ110 100 CFM · Exhaust Fan ×1
1 project · most recent 01/23/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
01/23/2026Signed-offPLUMB-IT MECHANICAL INCGas, Storm, Water/Sanitary
2 projects · most recent 06/03/2026
General Wiring
FiledStatusContractorScope
06/03/2026Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
05/15/2026Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
1 project · most recent 07/20/2026
Steel Concrete
FiledStatusContractorScope
07/20/2026Permit IssuedBRICKSTONE CONST & RENOVSteel, Concrete
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
11/21/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/21/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
11/14/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/16/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
07/16/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 85
DateRequirementInspectorRole
02/13/2026Fire-Resistant Penetrations and JointsSUNG HO SHINspecial
01/21/2026Fire-Resistant Penetrations and JointsSUNG HO SHINspecial
12/17/2025Fire-Resistant Penetrations and JointsSUNG HO SHINspecial
11/10/2025Lighting controlsRobert Truskoskyenergy_progress
11/10/2025Air barrier - visual inspectionRobert Truskoskyenergy_progress
11/10/2025Interior lighting powerRobert Truskoskyenergy_progress
11/10/2025Exterior lighting powerRobert Truskoskyenergy_progress
11/10/2025HVAC-R and service water heating system controls—energy_progress
11/10/2025Air barrier — testing —energy_progress
11/10/2025Insulation placement and R valuesRobert Truskoskyenergy_progress
11/10/2025Fenestration and door U-factor and product ratingsRobert Truskoskyenergy_progress
11/10/2025Ventilation and air distribution system—energy_progress
11/10/2025Electric vehicle service equipment requirementsRobert Truskoskyenergy_progress
11/10/2025Fenestration air leakageRobert Truskoskyenergy_progress
11/10/2025Fenestration areasRobert Truskoskyenergy_progress
11/10/2025HVAC-R and service water heating equipment—energy_progress
11/10/2025Energy Code Compliance InspectionsRobert Truskoskyprogress
11/10/2025FinalJonar Madriagaprogress
11/10/2025Footing and FoundationRobert Truskoskyprogress
11/10/2025Fire-Resistant Penetrations and JointsRobert Truskoskyspecial
11/10/2025Mechanical SystemsRobert Truskoskyspecial
11/10/2025Structural Stability – Alterations of existing buildingsRobert Truskoskyspecial
11/10/2025Smoke Control Systems TestingRobert Truskoskyspecial
11/10/2025Structural Cold-Formed SteelRobert Truskoskyspecial
11/10/2025Concrete - Cast-In-PlaceRobert Truskoskyspecial
Latest 25 of 85.
▾Documents — 131 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/23/2026Q00866586-P1Request digital key ↗
08/23/2026Q00866586-P3Request digital key ↗
08/23/2026Q00866586-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸Zoning, Tax Lot & Property Records10
▸DOB NOWZD1: DOB Zoning Diagram6
08/18/2026Q00680530-P9Open ↗
08/13/2026Q00680530-P2Open ↗
08/13/2026Q00680530-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWRestrictive Declaration/Easement 13
08/18/2026Q00680530-P9Open ↗
08/13/2026Q00680530-I1Open ↗
08/13/2026Q00680530-P8Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00680530-I1Open ↗
▸Seals & Professional Certifications78
▸DOB NOWProgress Inspector Seal & Signature42
09/01/2026Q00680530-P8Open ↗
09/01/2026Q00680530-P8Open ↗
09/01/2026Q00680530-P8Open ↗
Showing 3 of 42 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature25
09/01/2026Q00680530-P8Open ↗
09/01/2026Q00680530-P8Open ↗
09/01/2026Q00680530-P8Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/18/2026Q00680530-P9Open ↗
08/13/2026Q00680530-I1Open ↗
08/13/2026Q00680530-P1Open ↗
Showing 3 of 11 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00680530-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00680530-I1Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/18/2026Q00680530-P9Open ↗
08/13/2026Q00680530-P3Open ↗
08/13/2026Q00680530-P1Open ↗
Showing 3 of 10 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/18/2026Q00680530-I1Open ↗
▸Other Documents19
▸DOB NOWSite Survey: Initial6
08/18/2026Q00680530-P9Open ↗
08/13/2026Q00680530-I1Open ↗
08/13/2026Q00680530-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone6
08/18/2026Q00680530-P9Open ↗
08/13/2026Q00680530-P2Open ↗
08/13/2026Q00680530-P8Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProperty Ownership Certification6
08/18/2026Q00680530-P9Open ↗
08/13/2026Q00680530-I1Open ↗
08/13/2026Q00680530-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWFinal Survey1
08/13/2026Q00680530-I1Open ↗