← Back
Predominantly retail with other uses
110-33 SUTPHIN BOULEVARD
QUEENS · BIN 4263388
💬 Discuss this project
1930Year Built
2Stories
K4Building Class
R5DZoning
3,180 sfGross Floor Area
3Units
Rent Stabilized43 Open Violations ▸FDNY Report ↗
Predominantly retail with other uses · Owner of record: SUTPHIN HOUSE LLC · 1,987 sf lot · 1.6 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
Floor 2Under Construction4p · 1 filing · 20 docs
Floor 1Under Construction14p · 1 filing · 20 docs
CellarUnder Construction10p · 1 filing · 20 docs
1 job · most recent 09/18/2025
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/18/2025Permit IssuedZK DEVELOPMENT CORPAir Conditioning Systems
Cooling
Midea MSEHU-H09B-2A 9,000 BTU · Fan Coil Indoor ×4
MSEHU-H06B-2A 6,000 BTU · Fan Coil Indoor ×3
MO5EX-H36B-2A 36,000 BTU · Condensing Unit ×2
MSEHU-H18B-2A 18,000 BTU · Fan Coil Indoor ×1
1 job · most recent 09/18/2025
Sprinkler System
FiledStatusContractorScope
09/18/2025Permit IssuedDYNAMIC PLBNG & SPRKR CORSprinkler System
1 job · most recent 09/18/2025
Water/Sanitary
FiledStatusContractorScope
09/18/2025Permit IssuedKISHAN PLUMBING INCWater/Sanitary
1 job · most recent 03/05/2026
General Wiring
FiledStatusContractorScope
03/05/2026Permit IssuedPOWER SURGE ELECTRIC, INCGeneral Wiring
Building Lifecycle
All (111)Filed (4)Permit Issued (5)Violation (60)Inspection (4)Objection (12)Special Inspection (26)
07/17/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/15/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/17/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/26/2026
Permit issued — Sprinklers
Q01098927-S2-PL
05/22/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/12/2026
Permit issued — Plumbing
Q01098927-S2-EW-SP
03/25/2026
Permit issued — Mechanical Systems
Q01098927-S3-MS
03/09/2026
Permit issued — Plumbing
Q01098927-S1-PL
02/08/2026
Objection resolved — Addressed
02/07/2026
Objection raised — Cost
01/28/2026
Objection resolved — Addressed
01/23/2026
Objection resolved — Addressed
12/23/2025
Permit issued — General Construction
Q01098927-I1-GC
12/09/2025
Objection raised — Energy
12/06/2025
Objection resolved — Addressed
12/06/2025
Objection resolved — Addressed
11/16/2025
Objection resolved — Addressed
10/01/2025
Special inspection requirement — Fenestration areas
ASHWANI KHANNA
10/01/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
ASHWANI KHANNA
09/29/2025
Objection raised — Admin
09/29/2025
Objection raised — Fire_Protection
09/29/2025
Objection raised — Energy
09/18/2025
Filed — Alteration CO
Propose to install ductless split units for the medical office on first floor.
Q01098927-S3
09/15/2025
Special inspection requirement — Fire-Resistance Rated Construction
ASHWANI KHANNA
09/15/2025
Special inspection requirement — Post-installed Anchors
ASHWANI KHANNA
09/15/2025
Special inspection requirement — Energy Code Compliance Inspections
ASHWANI KHANNA
09/15/2025
Special inspection requirement — HVAC-R and service water heating system controls
ASHWANI KHANNA
09/15/2025
Special inspection requirement — HVAC-R and service water heating equipment
ASHWANI KHANNA
09/15/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ASHWANI KHANNA
09/15/2025
Special inspection requirement — Maintenance information
ASHWANI KHANNA
09/13/2025
Special inspection requirement — Maintenance information
ASHWANI KHANNA
09/13/2025
Special inspection requirement — Interior lighting power
ASHWANI KHANNA
09/13/2025
Special inspection requirement — Metering
ASHWANI KHANNA
09/13/2025
Special inspection requirement — Lighting controls
ASHWANI KHANNA
09/02/2025
Objection raised — Cost
08/25/2025
Filed — Alteration CO
Propose to install ductless split units for the medical office on first floor.
Q01098927-S2
07/17/2025
Special inspection requirement — Tenant Protection Plan Compliance
ASHWANI KHANNA
07/17/2025
Special inspection requirement — Tenant Protection Plan Compliance
ASHWANI KHANNA
12/05/2024
Special inspection requirement — Final
ASHWANI KHANNA
12/05/2024
Special inspection requirement — Mechanical Systems
ASHWANI KHANNA
12/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ASHWANI KHANNA
12/04/2024
Special inspection requirement — Sprinkler Systems
ASHWANI KHANNA
09/27/2024
Filed — Alteration CO
Propose to install ductless split units for the medical office on first floor.
Q01098927-S1
09/06/2024
Filed — Alteration CO
Propose to install ductless split units for the medical office on first floor.
Q01098927-I1
09/05/2024
Special inspection requirement — Fenestration air leakage
ASHWANI KHANNA
09/04/2024
Special inspection requirement — Tenant Protection Plan Compliance
ASHWANI KHANNA
08/20/2024
Special inspection requirement — Energy Code Compliance Inspections
ASHWANI KHANNA
08/20/2024
Special inspection requirement — Fire-Resistance Rated Construction
ASHWANI KHANNA
08/20/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
ASHWANI KHANNA
08/20/2024
Special inspection requirement — Masonry
ASHWANI KHANNA
08/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ASHWANI KHANNA
11/30/2023
Violation issued (HPD, closed)
I
11/18/2022
Violation issued (HPD, closed)
I
03/18/2022
Violation issued (HPD, closed)
I
04/22/2021
Violation issued (HPD, closed)
I
11/08/2019
Violation issued (HPD, closed)
I
01/11/2018
Violation issued (HPD, closed)
I
12/09/2006
Violation issued (HPD, open)
B
12/09/2006
Violation issued (HPD, open)
B
12/09/2006
Violation issued (HPD, open)
C
Latest 60 of 111 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNER OF 110-33 SUTPHIN B103/22/2026
HPD103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RCGA ARCHITECTS, P.C409/18/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RCGA ARCHITECTS803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ZK DEVELOPMENT CORPGeneral Contractor204/09/2026
KISHAN PLUMBING INCPlumbing207/08/2026
REDROVAN ELIASElectrical103/21/2026
MCINTOSH, ABIELElectrical103/21/2026
DYNAMIC PLBNG & SPRKR CORFire Protection106/28/2026
SAVAGE, EDLEYElectrical103/21/2026
RAMDEEN, BALDATHElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ASHWANI KHANNA PE5256409/18/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedKISHAN PLUMBING INC05/26/2026
DOB NOWPlumbingPermit IssuedDYNAMIC PLBNG & SPRKR COR05/12/2026
DOB NOWMechanical SystemsPermit IssuedZK DEVELOPMENT CORP03/25/2026
DOB NOWPlumbingPermit IssuedN AND S PLUMBING INC03/09/2026
DOB NOWGeneral ConstructionPermit IssuedZK DEVELOPMENT CORP12/23/2025
BISOTISSUEDMD. ASHRAF ALI06/06/2011
BIS—ISSUEDN/A06/06/2001
BISEQISSUEDLAKHI GENERAL CONTRACTOR11/06/2000
BISOTISSUEDGIRVAN DOUGLAS03/29/2000
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
07/17/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/15/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/17/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/22/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
10/01/2025Fenestration areasASHWANI KHANNAenergy_progress
10/01/2025Fenestration and door U-factor and product ratingsASHWANI KHANNAenergy_progress
09/15/2025Fire-Resistance Rated ConstructionASHWANI KHANNAprogress
09/15/2025Post-installed AnchorsASHWANI KHANNAspecial
09/15/2025Energy Code Compliance InspectionsASHWANI KHANNAprogress
09/15/2025HVAC-R and service water heating system controlsASHWANI KHANNAenergy_progress
09/15/2025HVAC-R and service water heating equipmentASHWANI KHANNAenergy_progress
09/15/2025HVAC-R and service water piping design and insulationASHWANI KHANNAenergy_progress
09/15/2025Maintenance informationASHWANI KHANNAenergy_progress
09/13/2025Maintenance informationASHWANI KHANNAenergy_progress
09/13/2025Interior lighting powerASHWANI KHANNAenergy_progress
09/13/2025MeteringASHWANI KHANNAenergy_progress
09/13/2025Lighting controlsASHWANI KHANNAenergy_progress
07/17/2025Tenant Protection Plan ComplianceASHWANI KHANNAspecial
07/17/2025Tenant Protection Plan ComplianceASHWANI KHANNAspecial
12/05/2024FinalASHWANI KHANNAprogress
12/05/2024Mechanical SystemsASHWANI KHANNAspecial
12/04/2024Fire-Resistant Penetrations and JointsASHWANI KHANNAspecial
12/04/2024Sprinkler SystemsASHWANI KHANNAspecial
09/05/2024Fenestration air leakageASHWANI KHANNAenergy_progress
09/04/2024Tenant Protection Plan ComplianceASHWANI KHANNAspecial
08/20/2024Energy Code Compliance InspectionsASHWANI KHANNAprogress
08/20/2024Fire-Resistance Rated ConstructionASHWANI KHANNAprogress
08/20/2024Structural Stability – Alterations of existing buildingsASHWANI KHANNAspecial
08/20/2024MasonryASHWANI KHANNAspecial
Latest 25 of 26.
▾Documents — 48 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/21/2026Q01098927-P1Request digital key ↗
08/18/2026Q01098927-S3Request digital key ↗
08/18/2026Q01098927-S2Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications31
▸DOB NOWProgress Inspector Seal & Signature16
09/23/2026Q01098927-S3Open ↗
09/23/2026Q01098927-S3Open ↗
09/23/2026Q01098927-S3Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/23/2026Q01098927-S3Open ↗
09/23/2026Q01098927-S3Open ↗
09/23/2026Q01098927-S3Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/21/2026Q01098927-P1Open ↗
08/13/2026Q01098927-S3Open ↗
08/13/2026Q01098927-I1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/21/2026Q01098927-P1Open ↗
08/13/2026Q01098927-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q01098927-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q01098927-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q01098927-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/21/2026Q01098927-P1Open ↗
08/13/2026Q01098927-S2Open ↗
08/13/2026Q01098927-I1Open ↗
Showing 3 of 5 on file for this type
▸Other Documents2
▸DOB NOWProperty Ownership Certification2
08/21/2026Q01098927-P1Open ↗
08/13/2026Q01098927-I1Open ↗