← Back
Miscellaneous one family
153-27 118 AVENUE
QUEENS · BIN 4264913
💬 Discuss this project
1920Year Built
2Stories
A9Building Class
R3-2Zoning
736 sfGross Floor Area
1Units
2 Open Violations ▸FDNY Report ↗
Miscellaneous one family · 1,325 sf lot · 0.56 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
1 job · most recent 07/30/2025
Fence
FiledStatusContractorScope
07/30/2025Signed-offGRANITE ENVIRONMENT, LLCFence
Building Lifecycle
All (25)Filed (5)Permit Issued (4)Signed Off (2)Violation (4)Inspection (1)Objection (4)Special Inspection (5)
02/04/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/03/2025
Signed off — Alteration
ERECTING A CMU REINFORCED WALL AGAINST THE PARTY WALL FOUNDATION WITH A CONCRETE FOOTING TO HOLD BACKFILL FOR HPD EMERGENCY DEC# 18894, FD# Q01198395
Q01208209-I1
09/03/2025
Signed off — Full Demolition
Filed Herewith; 8-Foot-High Temporary Plywood Construction Fence in conjunction with Demolition Application #Q01198395-I1
Q01198395-I1
08/29/2025
Special inspection requirement — Structural Stability – Alterations of existing Buildings
THOMAS WENDEL
08/29/2025
Special inspection requirement — Demolition
THOMAS WENDEL
08/18/2025
Objection resolved — Addressed
08/15/2025
Objection raised — Other
07/30/2025
Filed — Full Demolition
Filed Herewith; 8-Foot-High Temporary Plywood Construction Fence in conjunction with Demolition Application #Q01198395-I1
Q01198395-P1
07/14/2025
Permit issued — General Construction
Q01208209-I1-GC
07/11/2025
Permit issued — Full Demolition
Q01198395-I1-FD
07/10/2025
Filed — Alteration
ERECTING A CMU REINFORCED WALL AGAINST THE PARTY WALL FOUNDATION WITH A CONCRETE FOOTING TO HOLD BACKFILL FOR HPD EMERGENCY DEC# 18894, FD# Q01198395
Q01208209-I1
07/07/2025
Permit issued — Construction Fence
Q01198395-S1-FN
07/01/2025
Special inspection requirement — Concrete - Cast-In-Place
THOMAS WENDEL
07/01/2025
Special inspection requirement — Masonry
THOMAS WENDEL
06/30/2025
Filed — Full Demolition
Filed Herewith; 8-Foot-High Temporary Plywood Construction Fence in conjunction with Demolition Application #Q01198395-I1
Q01198395-S1
06/13/2025
Objection resolved — Addressed
04/24/2025
Objection raised — Admin
04/16/2025
Filed — Full Demolition
Filed Herewith; 8-Foot-High Temporary Plywood Construction Fence in conjunction with Demolition Application #Q01198395-I1
Q01198395-I1
04/09/2025
Special inspection requirement — Final
THOMAS WENDEL
01/03/2025
Permit issued — Construction Fence
Q01160410-I1-FN
12/31/2024
Filed — Alteration
Q01160410-I1
12/19/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/16/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/14/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/02/2024
Violation issued (ECB, open)
Construction
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HOUSING PRESERVATION DEVELOPMENT1707/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HIRANI ENGINEERING AND LAND SURVEYI407/30/2025
ASR ENGINEERING PC112/31/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SADIE SILVER303/21/2026
HIRANI ENGINEERING LAND SURVEY203/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GRANITE ENVIRONMENT, LLCGeneral Contractor707/08/2026
NEW SAFEWAY CONTRACTINGGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HIRANI ENGINEERING & LAND679307/30/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offGRANITE ENVIRONMENT, LLC07/14/2025
DOB NOWFull DemolitionSigned-offGRANITE ENVIRONMENT, LLC07/11/2025
DOB NOWConstruction FenceSigned-offGRANITE ENVIRONMENT, LLC07/07/2025
DOB NOWConstruction FencePermit IssuedNEW SAFEWAY CONTRACTING01/03/2025
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
02/04/2026Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
08/29/2025Structural Stability – Alterations of existing BuildingsTHOMAS WENDELspecial
08/29/2025DemolitionTHOMAS WENDELspecial
07/01/2025Concrete - Cast-In-PlaceTHOMAS WENDELspecial
07/01/2025MasonryTHOMAS WENDELspecial
04/09/2025FinalTHOMAS WENDELprogress
▾Documents — 23 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/21/2026Q01160410-I1Contact architect ↗
08/20/2026Q01198395-I1Contact architect ↗
08/20/2026Q01198395-P1Contact architect ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/20/2026Q01198395-I1Open ↗
08/20/2026Q01198395-P1Open ↗
08/20/2026Q01198395-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026Q01198395-I1Open ↗
09/23/2026Q01198395-I1Open ↗
08/26/2026Q01208209-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
08/26/2026Q01208209-I1Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWElectric Cut-Off1
08/13/2026Q01198395-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026Q01198395-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026Q01198395-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026Q01198395-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/20/2026Q01198395-I1Open ↗
▸DOB NOWRodent Control1
08/13/2026Q01198395-I1Open ↗
▸Other Documents2
▸DOB NOWProperty Ownership Certification2
08/20/2026Q01198395-I1Open ↗
08/20/2026Q01198395-P1Open ↗