← Back
Miscellaneous one family
153-26 118 AVENUE
QUEENS · BIN 4265061
💬 Discuss this project
1925Year Built
2Stories
A9Building Class
R3-2Zoning
730 sfGross Floor Area
1Units
Miscellaneous one family · 1,350 sf lot · 0.54 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ETRECTE LLC104/24/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J B I CONSTRUCTION GROUP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J.B.I. CONSTRUCTION GROUPGeneral Contractor303/21/2026
JSP ELECTL CNTNG CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ETRECTE LLC8116104/24/2025
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
08/26/2025
Signed off — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOF TOP. NO CHANGES TO THE USE EGRESS OR OCCUPANCY.
Q01215745-I1
05/08/2025
Permit issued — Solar
Q01215745-I1-SL
04/24/2025
Filed — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOF TOP. NO CHANGES TO THE USE EGRESS OR OCCUPANCY.
Q01215745-I1
04/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
VYACHESLAV NECHAYEV
04/24/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
VYACHESLAV NECHAYEV
04/24/2025
Special inspection requirement — Energy Code Compliance Inspections
VYACHESLAV NECHAYEV
04/24/2025
Special inspection requirement — Final
VYACHESLAV NECHAYEV
04/24/2025
Special inspection requirement — Air barrier - visual inspection
VYACHESLAV NECHAYEV
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offJ.B.I. CONSTRUCTION GROUP05/08/2025
1 job · most recent 04/02/2025
FiledStatusContractorScope
04/02/2025CompleteJSP ELECTL CNTNG CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/24/2025Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
04/24/2025Structural Stability – Alterations of existing buildingsVYACHESLAV NECHAYEVspecial
04/24/2025Energy Code Compliance InspectionsVYACHESLAV NECHAYEVprogress
04/24/2025FinalVYACHESLAV NECHAYEVprogress
04/24/2025Air barrier - visual inspectionVYACHESLAV NECHAYEVenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/20/2026Q01215745-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
09/28/2026Q01215745-I1Open ↗
09/28/2026Q01215745-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/20/2026Q01215745-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/28/2026Q01215745-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/20/2026Q01215745-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01215745-I1Open ↗