← Back
One story - permanent living quarter
161-22 119 ROAD
QUEENS · BIN 4265749
💬 Discuss this project
1930Year Built
1.5Stories
A2Building Class
R3AZoning
2,052 sfGross Floor Area
1Units
18 Open Violations ▸FDNY Report ↗
One story - permanent living quarter · Owner of record: 19 BREAKDOWN LLC · 4,900 sf lot · 0.42 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
1 job · most recent 08/31/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/31/2026——Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Cooper & Hunter CH-N48LCU-230VO 48,000 BTU · Condensing Unit ×1
CH-N60LCU-230VO 60,000 BTU · Condensing Unit ×1
Heating
Cooper & Hunter CH-48AHU 48,000 BTU · Ahu ×1
CH-60AHU 60,000 BTU · Ahu ×1
Ventilation
Hampton Bay 7114-01 50 CFM · Exhaust Fan ×7
Delta Breeze SMT150 150 CFM · Exhaust Fan ×2
1 job · most recent 08/31/2026
Wood
FiledStatusContractorScope
08/31/2026——Wood
4 jobs · most recent 08/31/2026
Fence
FiledStatusContractorScope
08/31/2026——Fence
09/09/2025Signed-offSTATEWIDE DEMOLITION CORPFence
11/15/2022Permit IssuedG.N. CONSTRUCTION INCFence
09/17/2021Permit IssuedAAKASH CONSTRUCTION INCFence
Building Lifecycle
All (44)Filed (7)Permit Issued (4)Signed Off (1)Violation (23)Inspection (2)Objection (3)Special Inspection (4)
08/31/2026
Filed — New Building
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH DOB NOW APPLICATION #Q01450561-I1. FENCE SHALL COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE.
Q01450561-S1
11/25/2025
Violation issued (HPD, open)
I
10/22/2025
Signed off — Full Demolition
This is a DOB Emergency Declaration, changed from a non-emergency.
Q01208113-I1
10/02/2025
Permit issued — Full Demolition
Q01208113-I1-FD
09/09/2025
Filed — Full Demolition
This is a DOB Emergency Declaration, changed from a non-emergency.
Q01208113-P1
09/05/2025
Special inspection requirement — Demolition
Chris Sanders
09/05/2025
Special inspection requirement — Structural Stability – Alterations of existing Buildings
Chris Sanders
08/28/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/11/2025
Objection raised — Other
05/29/2025
Objection resolved — Addressed
05/23/2025
Filed — Full Demolition
On Behalf of GC- DOB Full Demo with Immediate Emergency Declaration
Q01166871-I1
05/16/2025
Special inspection requirement — Structural Stability – Alterations of existing Buildings
05/15/2025
Objection raised — Other
05/07/2025
Special inspection requirement — Demolition
05/05/2025
Permit issued — Construction Fence
Q01208113-S1-FN
05/02/2025
Filed — Full Demolition
This is a DOB Emergency Declaration, changed from a non-emergency.
Q01208113-I1
05/02/2025
Filed — Full Demolition
This is a DOB Emergency Declaration, changed from a non-emergency.
Q01208113-S1
12/05/2024
Violation issued (HPD, open)
I
11/29/2023
Violation issued (HPD, open)
I
09/18/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
07/12/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
12/21/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/18/2022
Permit issued — Construction Fence
Q08015717-I1-FN
11/18/2022
Violation issued (HPD, open)
I
11/15/2022
Filed — Alteration
INSTALLTION OF PLYWOOD CONSTRUCTION FENCE FOR PUBLIC SAFETY. NO CHANGES TO USES, EGRESS OR OCCUPANCY.
Q08015717-I1
09/06/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/05/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/07/2022
Violation issued (DOB, closed)
V%-DOB VIOLATION
04/01/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/17/2022
Violation issued (HPD, open)
I
09/17/2021
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00594006-I1
09/17/2021
Permit issued — Construction Fence
Q00594006-I1-FN
08/29/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/03/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/21/2021
Violation issued (HPD, open)
I
01/28/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/28/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/08/2019
Violation issued (HPD, open)
I
01/12/2018
Violation issued (HPD, open)
I
05/09/2016
Violation issued (DOB, closed)
V%*-DOB VIOLATION - DISMISSED
05/20/2003
Violation issued (HPD, open)
B
05/20/2003
Violation issued (HPD, open)
B
05/20/2003
Violation issued (HPD, open)
B
12/27/2002
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HPD507/08/2026
HOUSING PRESERVATION DEVELOPMENT904/09/2026
GUARDIAN ASSET MANAGEMENT103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPEDITE DEM603/21/2026
ABC PERMIT EXPEDITING203/21/2026
DSENY ENGINEERING SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STATEWIDE DEMOLITION CORP.General Contractor204/09/2026
AAKASH CONSTRUCTION INCGeneral Contractor107/08/2026
G.N. CONSTRUCTION INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOUTH BAY ENGINEERING PLL6682209/09/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFull DemolitionSigned-offSTATEWIDE DEMOLITION CORP.10/02/2025
DOB NOWConstruction FenceSigned-offSTATEWIDE DEMOLITION CORP.05/05/2025
DOB NOWConstruction FencePermit IssuedEMPIRE CONSTRUCTION ASSOC11/18/2022
DOB NOWConstruction FencePermit IssuedAAKASH CONSTRUCTION INC09/17/2021
BIS—ISSUEDPHEONIX HOMES02/15/2001
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
09/18/2023Fail-Final General Construction Non-Directive 14FailView ↗
07/12/2023Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
09/05/2025DemolitionChris Sandersspecial
09/05/2025Structural Stability – Alterations of existing BuildingsChris Sandersspecial
05/16/2025Structural Stability – Alterations of existing Buildings—special
05/07/2025Demolition—special
▾Documents — 35 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
09/14/2026Q01450561-S1Request digital key ↗
09/14/2026Q01450561-I1Request digital key ↗
08/27/2026Q00594006-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWHouse Number Verification: TOPO Stamp1
09/14/2026Q01450561-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
09/14/2026Q01450561-I1Open ↗
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/14/2026Q01450561-S1Open ↗
09/14/2026Q01450561-I1Open ↗
08/13/2026Q01208113-S1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/23/2026Q01208113-P1Open ↗
08/23/2026Q01208113-P1Open ↗
▸Trade Schedules & Equipment8
▸DOB NOWSewer Cut-Off2
08/13/2026Q01166871-I1Open ↗
08/13/2026Q01208113-I1Open ↗
▸DOB NOWGas Cut-Off2
08/13/2026Q01166871-I1Open ↗
08/13/2026Q01208113-I1Open ↗
▸DOB NOWWater Cut-Off2
08/13/2026Q01166871-I1Open ↗
08/13/2026Q01208113-I1Open ↗
▸DOB NOWElectric Cut-Off2
08/13/2026Q01166871-I1Open ↗
08/13/2026Q01208113-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
09/14/2026Q01450561-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q01208113-I1Open ↗
▸DOB NOWRodent Control1
08/13/2026Q01208113-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
09/14/2026Q01450561-I1Open ↗
▸Other Documents4
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026Q01208113-I1Open ↗
▸DOB NOWSite Survey: Initial1
09/14/2026Q01450561-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
09/14/2026Q01450561-I1Open ↗
▸DOB NOWProperty Ownership Certification1
09/14/2026Q01450561-I1Open ↗